950 KINGS HIGHWAY
BROOKLYN · BIN 3177637
💬 Discuss this project
1950Year Built
2Stories
K4Building Class
C4-2Zoning
37,400 sfGross Floor Area
5Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: KINGSWAY PLAZA ASSOC. LLC · 22,880 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof6p · 3 filings · 13 docs
Floor 234p · 7 filings · 20 docs
Floor 132p · 6 filings · 20 docs
Mezzanine19p · 3 filings · 20 docs
Cellar25p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACHS MANAGEMENT3207/08/2026
JENEL MANAGEMENT607/08/2026
MJM CONTRACTING ASSOCIATES707/08/2026
DITMARS 31ST ST ASSOCIATES4407/08/2026
KINGSWAY PLAZA ASSOC4003/22/2026
MJM ASSOCIATES CONSTR103/22/2026
KINGS PLAZA ASSOCIATES303/22/2026
OWNER OF 946 KINGS HIGHWA103/22/2026
OWNER OF 946 KINGS HI9GHW103/22/2026
KINGS PLAZA ASSOCIATION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BURNHAM NATIONWIDE INC103/21/2026
SBLM1303/21/2026
4444 PPPP CORP203/21/2026
BUILDING BROTHERS2003/21/2026
KD DESIGNS203/21/2026
ASKON ARCHITECTS P C403/21/2026
KAZAM CONSULTANTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJM ASSOCIATES CONSTR LLCGeneral Contractor1207/08/2026
A M A HOLDINGSScaffold1007/08/2026
ACTIVE SIGNSScaffold407/08/2026
JOHN AHRENSElectrical303/21/2026
TUXEDO ELECL CONTRG INC 004066General Contractor303/22/2026
F.S. SITE CORPFire Protection207/08/2026
M. FRIED STORE FIXTURES,General Contractor203/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
F.S. SITE CORPPlumbing107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
OM ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191009/04/2025
RYAN SPECIAL ENGINEERING2018103/17/2021
Building Lifecycle
All (185)Filed (33)Permit Issued (29)Signed Off (26)Violation (49)Inspection (14)Objection (4)Special Inspection (30)
07/30/2026
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED SIGN WORDING "EUROPEAN WAX CENTER''. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00127794-I1
02/06/2026
Violation issued (FDNY_NOV, closed)
12/02/2025
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS VINYL WINDOW GRAPHICS
B01294374-I1
12/02/2025
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS VINYL WINDOW GRAPHICS
B01294389-I1
12/02/2025
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS VINYL WINDOW GRAPHICS
B01294393-I1
12/02/2025
Signed off — Alteration
B01294391-I1
10/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2025
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN ON EXTERIOR WALL. (BURLINGTON)
B01181551-I1
10/16/2025
Signed off — Alteration
INSTALL ILLUMINATED D/F BLADE SIGN ON EXTERIOR WALL. (BURLINGTON)
B01181572-I1
10/16/2025
Signed off — Alteration
INSTALL ILLUMINATED D/F BLADE SIGN ON EXTERIOR WALL. (BURLINGTON)
B01181569-I1
10/16/2025
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN ON EXTERIOR WALL. (BURLINGTON)
B01181550-I1
10/16/2025
Signed off — Alteration
B01181564-I1
10/16/2025
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN ON EXTERIOR WALL. (BURLINGTON)
B01181555-I1
10/16/2025
Signed off — Alteration
B01181541-I1
10/16/2025
Signed off — Alteration
B01181536-I1
10/16/2025
Signed off — Alteration
B01181512-I1
10/16/2025
Signed off — Alteration
INSTALL ILLUMINATED WALL SIGN ON EXTERIOR WALL. (BURLINGTON)
B01181549-I1
10/14/2025
Permit issued — Sign
B01294389-I1-SG
10/14/2025
Permit issued — Sign
B01294391-I1-SG
10/14/2025
Permit issued — Sign
B01294393-I1-SG
10/14/2025
Permit issued — Sign
B01294374-I1-SG
10/13/2025
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS VINYL WINDOW GRAPHICS
B01294374-I1
10/13/2025
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS VINYL WINDOW GRAPHICS
B01294389-I1
10/13/2025
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS VINYL WINDOW GRAPHICS
B01294393-I1
10/13/2025
Filed — Alteration
B01294391-I1
09/29/2025
Special inspection requirement — Final
ARIEL GOLSHAN
09/29/2025
Special inspection requirement — Final
ARIEL GOLSHAN
09/29/2025
Special inspection requirement — Final
ARIEL GOLSHAN
09/26/2025
Signed off — Alteration
BCF - PLUMBING WORK RELATED TO THE RENOVATION OF THE SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.
B01128740-I1
09/25/2025
Signed off — Alteration
BCF - STANDPIPE APPLICATION RELATED TO THE RENOVATION OF THE SPACE.
B01128784-I1
09/18/2025
Signed off — Alteration
BCF - SPRINKLER WORK RELATED TO THE RENOVATION GOF THE SPACE.
B01128772-I1
09/15/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
09/09/2025
Signed off — Alteration
BCF -TEMP LOOP SPRINKLER WORK RELATED TO THE INTERIOR RENOVATION OF AN EXISTING SPACE.
B01139148-I1
09/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/05/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
09/05/2025
Special inspection requirement — Standpipe Systems
Younes Abouyaala
09/04/2025
Filed — Alteration
BCF - STANDPIPE APPLICATION RELATED TO THE RENOVATION OF THE SPACE.
B01128784-P1
09/03/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
09/03/2025
Special inspection requirement — Standpipe Systems
Younes Abouyaala
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/28/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
08/26/2025
Signed off — Alteration
BCF - MECHANICAL WORK RELATED TO THE RENOVATION OF THE SPACE.
B01128758-I1
08/20/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/18/2025
Signed off — Alteration
BCF JENEL - FILING HEREWITH FOR THE INSTALLATION OF A CURB CUT WORK RELATED TO THE RENOVATION RETAIL SPACE.
B01187745-I1
08/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/15/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/15/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/31/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/31/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
07/30/2025
Signed off — Alteration
BCF/JENEL - INTERIOR RENOVATION TO AN EXISTING SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01152376-I1
07/29/2025
Filed — Alteration
BCF - SPRINKLER WORK RELATED TO THE RENOVATION GOF THE SPACE.
B01128772-P1
07/23/2025
Permit issued — Curb Cut
B01187745-I1-CC
07/21/2025
Objection resolved — Addressed
07/21/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/21/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/21/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offACTIVE SIGNS INC10/14/2025
DOB NOWSignSigned-offACTIVE SIGNS INC10/14/2025
DOB NOWSignSigned-offACTIVE SIGNS INC10/14/2025
DOB NOWSignSigned-offACTIVE SIGNS INC10/14/2025
DOB NOWCurb CutSigned-offMJM ASSOCIATES CONSTR LLC07/23/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC06/02/2025
DOB NOWGeneral ConstructionPermit IssuedMJM ASSOCIATES CONSTR LLC05/23/2025
DOB NOWSprinklersSigned-offALAN J. BRUTOSKY PLBG CON03/05/2025
DOB NOWConstruction FenceSigned-offMJM ASSOCIATES CONSTR LLC02/27/2025
DOB NOWGeneral ConstructionSigned-offMJM ASSOCIATES CONSTR LLC02/27/2025
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR01/31/2025
DOB NOWConstruction FenceSigned-offMJM ASSOCIATES CONSTR LLC01/31/2025
DOB NOWSprinklersSigned-offALAN J. BRUTOSKY PLBG CON01/29/2025
DOB NOWStandpipeSigned-offALAN J BRUTOSKY PLBR CONT01/29/2025
DOB NOWGeneral ConstructionSigned-offMJM ASSOCIATES CONSTR LLC01/21/2025
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC12/06/2024
DOB NOWMechanical SystemsSigned-offMJM ASSOCIATES CONSTR LLC12/05/2024
DOB NOWGeneral ConstructionSigned-offMJM ASSOCIATES CONSTR LLC09/18/2024
DOB NOWMechanical SystemsSigned-offM. FRIED STORE FIXTURES,03/29/2021
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC05/22/2019
BISPLISSUEDVILLAGE P & H NY INC08/09/2018
BISOTISSUEDU.S. TEAM INC08/09/2018
BISPLISSUEDJAG PLBG & MECH INC09/06/2017
BISMHISSUEDORIOLE CONSTRUCTION INC06/16/2016
BISOTISSUEDORIOLE CONSTRUCTION INC06/16/2016
BIS—ISSUEDBERGER SIGNS INC10/30/2008
BIS—ISSUEDBERGER SIGNS INC04/28/2008
BISPLISSUEDMACCARONE PLUMBING INC08/27/2007
BISOTISSUEDCOASTAL CONSTRUCTION05/04/2007
BISPLISSUEDEARLY PLBG & HTG INC06/01/2005
BISMHISSUEDADMIRAL AIR CONDITION COR03/23/2005
+ 39 more permits on file
8 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026Permit IssuedL J ELEC'L SERV. INC.General Wiring
11/05/2025CompleteDENALI ELECTRIC CORP—
08/06/2025CompleteOM ELECTRIC, INC—
08/06/2025CompleteOM ELECTRIC, INCGeneral Wiring
12/17/2024CompleteTUXEDO ELEC'L CONTR'G INC—
10/03/2024CompleteOM ELECTRIC, INCGeneral Wiring
03/26/2020CompleteEASTERN ELEC'L TECHNOLOGIGeneral Wiring
09/20/2018Permit IssuedAMRA ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
10/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/15/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
09/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/20/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
09/29/2025FinalARIEL GOLSHANprogress
09/29/2025FinalARIEL GOLSHANprogress
09/29/2025FinalARIEL GOLSHANprogress
09/05/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/05/2025Post-installed AnchorsYounes Abouyaalaspecial
09/05/2025Standpipe SystemsYounes Abouyaalaspecial
09/03/2025Post-installed AnchorsYounes Abouyaalaspecial
09/03/2025Standpipe SystemsYounes Abouyaalaspecial
09/03/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/31/2025Post-installed AnchorsYounes Abouyaalaspecial
07/31/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/31/2025Sprinkler SystemsYounes Abouyaalaspecial
07/21/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/21/2025Fenestration air leakageYounes Abouyaalaenergy_progress
07/21/2025Fenestration areasYounes Abouyaalaenergy_progress
07/21/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/21/2025Sprayed fire-resistant materialsYounes Abouyaalaspecial
07/21/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/21/2025PreliminaryYounes Abouyaalaprogress
07/21/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/21/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/21/2025VestibulesYounes Abouyaalaenergy_progress
07/13/2025Fenestration areasYounes Abouyaalaenergy_progress
07/13/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/13/2025Sprayed fire-resistant materialsYounes Abouyaalaspecial
Latest 25 of 55.
▾Documents — 167 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch30
08/24/2026B01093582-I1Request digital key ↗
08/23/2026B01131564-I1Request digital key ↗
08/23/2026B01139148-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/02/2026B00127794-I1Request digital key ↗
09/02/2026B00127794-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00453498-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION7
12/18/2025340916520Open ↗
03/28/2025340916520Open ↗
07/15/2020321310960Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
09/18/2017321043866Open ↗
06/20/2016321043866Open ↗
06/20/2016321043866Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/15/2017321043866Open ↗
▸Seals & Professional Certifications70
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/02/2026B00127794-P1Open ↗
09/02/2026B00127794-I1Open ↗
09/01/2026B00453498-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B01152376-P1Open ↗
08/30/2026B01294393-I1Open ↗
08/29/2026B00127794-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
07/02/2018321310960Open ↗
12/15/2017321043866Open ↗
12/15/2017321043866Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01128784-I1Open ↗
09/06/2026B01128784-P1Open ↗
08/27/2026B01115805-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/02/2018321310960Open ↗
12/22/2014321043866Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/22/2014321043866Open ↗
12/22/2014321043866Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/02/2018321310960Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/28/2025340916520Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/28/2025340916520Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/02/2018321310960Open ↗
12/22/2014321043866Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026B01115805-I1Open ↗
08/13/2026B01115805-P1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/28/2025340916520Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01115805-I1Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/01/2026B00453498-I1Open ↗
08/23/2026B01131564-I1Open ↗
08/23/2026B01128758-I1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/02/2018321310960Open ↗
12/22/2014321043866Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/02/2018321310960Open ↗
12/15/2017321043866Open ↗
12/15/2017321043866Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
12/15/2017321043866Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00453498-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/15/2017321043866Open ↗
12/12/2017321043866Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/14/2017321043866Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/02/2018321310960Open ↗
12/15/2017321043866Open ↗
12/22/2014321043866Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
07/02/2018321310960Open ↗
12/22/2014321043866Open ↗
12/22/2014321043866Open ↗
▸BISBOROUGH INTAKE FORM2
12/15/2017321043866Open ↗
12/15/2017321043866Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/28/2025340916520Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/21/2026B01115805-I1Open ↗
08/21/2026B01115805-P1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B01131564-I1Open ↗