← Back
Miscellaneous asylum / home
948 EASTERN PARKWAY
BROOKLYN · BIN 3037475
💬 Discuss this project
1912Year Built
4Stories
N9Building Class
R6Zoning
15,540 sfGross Floor Area
0Units
Rent Stabilized18 Open Violations 17 unresolved · 1 paperwork only ▸FDNY Report ↗
Miscellaneous asylum / home · Owner of record: ICL REAL PROPERTY HOLDING CORPORATION · 5,547 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ICL807/08/2026
ICL REAL PROPERTY HOLDING503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANDREW KATZ ENGINEERS407/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
KNIGHT ELEC'L SERV. CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087207/10/2023
Building Lifecycle
All (76)Filed (4)Permit Issued (2)Signed Off (2)Violation (60)Inspection (4)Special Inspection (4)
05/04/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2023
Violation issued (FDNY_NOV, closed)
10/12/2023
Violation issued (FDNY_NOV, closed)
07/17/2023
Signed off — Alteration
DISCONNECT AND RECONNECT GAS PIPING TO NEW REPLACEMENT BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749305-I1
07/17/2023
Signed off — Alteration
DISCONNECT AND RECONNECT GAS PIPING TO NEW REPLACEMENT BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749305-S1
07/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2023
Filed — Alteration
DISCONNECT AND RECONNECT GAS PIPING TO NEW REPLACEMENT BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749305-P2
07/10/2023
Filed — Alteration
DISCONNECT AND RECONNECT GAS PIPING TO NEW REPLACEMENT BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749305-P1
07/10/2023
Special inspection requirement — Heating Systems
David Katz
07/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
07/10/2023
Special inspection requirement — Maintenance information
David Katz
07/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
David Katz
07/03/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2023
Violation issued (FDNY_NOV, closed)
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/22/2023
Violation issued (HPD, closed)
A
02/21/2023
Permit issued — Plumbing
B00749305-S1-PL
02/15/2023
Filed — Alteration
DISCONNECT AND RECONNECT GAS PIPING TO NEW REPLACEMENT BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749305-S1
07/25/2022
Filed — Alteration
DISCONNECT AND RECONNECT GAS PIPING TO NEW REPLACEMENT BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749305-I1
07/25/2022
Permit issued — Boiler Equipment
B00749305-I1-BE
02/24/2022
Violation issued (HPD, closed)
A
11/15/2021
Violation issued (FDNY_ORDER, closed)
07/03/2021
Violation issued (FDNY_NOV, closed)
04/08/2021
Violation issued (HPD, closed)
A
03/10/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/10/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/21/2020
Violation issued (ECB, closed)
Construction
03/13/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/13/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/2019
Violation issued (ECB, closed)
Construction
05/14/2019
Violation issued (ECB, open)
Elevators
05/14/2019
Violation issued (ECB, closed)
Elevators
04/04/2019
Violation issued (HPD, open)
B
03/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2018
Violation issued (FDNY_NOV, closed)
10/01/2018
Violation issued (FDNY_NOV, closed)
03/25/2018
Violation issued (FDNY_NOV, closed)
11/22/2017
Violation issued (HPD, closed)
I
06/15/2017
Violation issued (ECB, closed)
Elevators
04/05/2017
Violation issued (FDNY_NOV, closed)
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/2016
Violation issued (FDNY_NOV, closed)
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2016
Violation issued (FDNY_NOV, closed)
08/28/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/23/2015
Violation issued (FDNY_NOV, closed)
10/02/2014
Violation issued (FDNY_NOV, closed)
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC02/21/2023
DOB NOWBoiler EquipmentSigned-offTARGET PIPING NY LLC07/25/2022
BISSPISSUEDBAY RIDGE MECHANICAL CORP04/22/1997
BISFPISSUEDFIRE COMMAND CO.,INC04/18/1997
BISPLISSUEDBAY RIDGE MECHANICAL CORP.03/21/1997
BISBLISSUEDCOSA DEVELOPMENT CORP04/04/1996
BISBLISSUEDBAY RIDGE MECHANICAL, CORP.01/29/1996
BISPLISSUEDBAY RIDGE MECHANICAL, CORP.01/29/1996
BIS—ISSUEDCOSA DEVELOPMENT CORP.09/26/1995
3 projects · most recent 09/29/2022
General Wiring Boiler Controls
FiledStatusContractorScope
09/29/2022Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
09/06/2022CompleteSMALLS MECH & ELECL SVCBoiler Controls
03/15/2021CancelledTHYSSENKRUPP ELEVATOR CO—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/10/2023Heating SystemsDavid Katzspecial
07/10/2023HVAC-R and service water heating equipmentDavid Katzenergy_progress
07/10/2023Maintenance informationDavid Katzenergy_progress
07/10/2023HVAC-R and service water heating system controlsDavid Katzenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026B00749305-S1Request digital key ↗
08/29/2026B00749305-I1Request digital key ↗
08/29/2026B00749305-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026B00749305-S1Open ↗
08/29/2026B00749305-I1Open ↗
08/13/2026B00749305-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B00749305-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B00749305-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00749305-S1Open ↗
08/29/2026B00749305-I1Open ↗
08/13/2026B00749305-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00749305-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00749305-I1Open ↗