← Back
BuildNYC
One family attached or semi-detached
948 ROCKLAND AVENUE
STATEN ISLAND · BIN 5175375
💬 Discuss this project
2022Year Built
2Stories
A5Building Class
R3-1Zoning
1,426 sfGross Floor Area
1Units
One family attached or semi-detached · 2,343 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Proposed One - Family Dwelling5p · 1 filing · 20 docs
Floor 1Proposed One - Family Dwelling15p · 1 filing · 20 docs
BasementProposed One - Family Dwelling5p · 1 filing · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect402/09/2023
Island Associates110/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Island Associates503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wallace Avenue ConstructionGeneral Contractor403/21/2026
Wallace Avenue ConstructionScaffold203/21/2026
Flow-Right Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Island Engineering Associates264102/07/2022
Building Lifecycle
06/05/2023
Signed off — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S00633711-S2
05/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/22/2023
Signed off — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S00633711-S1
05/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/19/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
47 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offWallace Avenue Construction10/13/2022
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating06/13/2022
DOB NOWCurb CutSigned-offWallace Avenue Construction04/25/2022
DOB NOWEarth WorkPermit IssuedWallace Avenue Construction04/04/2022
1 project · most recent 02/09/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/09/2023Signed-offFlow-Right Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 04/03/2023
General Wiring
FiledStatusContractorScope
04/03/2023CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 02/09/2023
Concrete Wood
FiledStatusContractorScope
02/09/2023Signed-offFlow-Right Plumbing & HeatingConcrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/19/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
02/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2022Pass-Final PL - UndergroundPassView ↗
06/17/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/31/2022Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
02/07/2022Exterior Insulation and Finish Systems (EIFS)WILLIAM DURDEN, P.E.special
02/07/2022Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
02/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
02/07/2022Subgrade InspectionsWILLIAM DURDEN, P.E.special
02/07/2022Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
02/07/2022Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
02/07/2022Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
02/07/2022Structural Wood FrameWILLIAM DURDEN, P.E.progress
02/07/2022Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
02/07/2022Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
02/07/2022Fenestration areasWILLIAM DURDEN, P.E.energy_progress
02/07/2022Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
02/07/2022HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
02/07/2022HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
02/07/2022Maintenance informationWILLIAM DURDEN, P.E.energy_progress
02/07/2022Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
02/07/2022Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
02/07/2022Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
02/07/2022Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
02/07/2022Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
02/07/2022Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
02/07/2022Permanent certificateWILLIAM DURDEN, P.E.energy_progress
02/07/2022Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
02/07/2022HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 28.
30 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account