← Back
One family attached or semi-detached
95-02 LINDEN BOULEVARD
QUEENS · BIN 4248455
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R4AZoning
1,140 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
One family attached or semi-detached · 1,900 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 12p · 2 filings · 15 docs
Cellar2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LW CONTRACTING1107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT509/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LW CONTRACTING INCGeneral Contractor307/08/2026
AP PLUMBING & HVAC LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965209/18/2025
Building Lifecycle
All (30)Filed (5)Permit Issued (5)Signed Off (3)Violation (4)Inspection (6)Special Inspection (7)
11/03/2025
Signed off — Alteration
application filed herewith for gut rehab; replace gypsum boards, minor interior non bearing partitions work, scraping of beams damaged by fire/smoke; replace portion of studs; new flooring, new doors, windows, painting; replace tiles.
Q01091478-I1
10/30/2025
Signed off — Alteration
application filed to replace plumbing fixtures
Q01091504-I1
10/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/09/2025
Signed off — Alteration
Q01091546-I1
09/30/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/18/2025
Filed — Alteration
application filed herewith for gut rehab; replace gypsum boards, minor interior non bearing partitions work, scraping of beams damaged by fire/smoke; replace portion of studs; new flooring, new doors, windows, painting; replace tiles.
Q01091478-P1
09/18/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
09/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
HAYM GROSS
09/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
HAYM GROSS
09/18/2025
Special inspection requirement — Air barrier - visual inspection
HAYM GROSS
09/18/2025
Special inspection requirement — Fenestration areas
HAYM GROSS
09/18/2025
Special inspection requirement — Fenestration air leakage
HAYM GROSS
09/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/11/2025
Permit issued — Plumbing
Q01091504-I1-PL
02/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2025
Filed — Alteration
application filed to replace plumbing fixtures
Q01091504-P1
01/07/2025
Permit issued — General Construction
Q01091478-I1-GC
12/10/2024
Permit issued — Plumbing
Q01091504-I1-PL
10/04/2024
Permit issued — Construction Fence
Q01091546-I1-FN
10/04/2024
Permit issued — General Construction
Q01091478-I1-GC
09/17/2024
Filed — Alteration
application filed herewith for gut rehab; replace gypsum boards, minor interior non bearing partitions work, scraping of beams damaged by fire/smoke; replace portion of studs; new flooring, new doors, windows, painting; replace tiles.
Q01091478-I1
09/17/2024
Filed — Alteration
application filed to replace plumbing fixtures
Q01091504-I1
09/17/2024
Filed — Alteration
Q01091546-I1
08/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/08/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG08/11/2025
DOB NOWGeneral ConstructionSigned-offLW CONTRACTING INC01/07/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG12/10/2024
DOB NOWConstruction FenceSigned-offLW CONTRACTING INC10/04/2024
DOB NOWGeneral ConstructionSigned-offLW CONTRACTING INC10/04/2024
1 project · most recent 06/10/2026
General Wiring
FiledStatusContractorScope
06/10/2026CompleteSUPREME ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/30/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/18/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
09/18/2025Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
09/18/2025Energy Code Compliance InspectionsHAYM GROSSprogress
09/18/2025Fire-Resistance Rated ConstructionHAYM GROSSprogress
09/18/2025Air barrier - visual inspectionHAYM GROSSenergy_progress
09/18/2025Fenestration areasHAYM GROSSenergy_progress
09/18/2025Fenestration air leakageHAYM GROSSenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01091504-P1Request digital key ↗
08/21/2026Q01091504-I1Request digital key ↗
08/21/2026Q01091546-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01091504-P1Open ↗
08/21/2026Q01091504-I1Open ↗
08/13/2026Q01091478-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q01091478-P1Open ↗
08/24/2026Q01091478-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q01091478-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q01091504-P1Open ↗
08/21/2026Q01091504-I1Open ↗
08/13/2026Q01091478-P1Open ↗
Showing 3 of 4 on file for this type