← Back
Two family converted from one family
95-10 101 STREET
QUEENS · Ozone Park (North) · BIN 4196989
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R5Zoning
1,708 sfGross Floor Area
2Units
5 Open Violations ▸FDNY Report ↗
Two family converted from one family · 3,038 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/03/2018$615K—— → —$360/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MADRIAGA ENGINEERING P.C.310/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BERNARDO GAMBA203/21/2026
Building Lifecycle
All (58)Filed (3)Violation (6)Objection (20)Special Inspection (29)
03/05/2026
Objection resolved — Addressed
02/04/2026
Objection raised — Other
02/03/2026
Objection resolved — Addressed
02/03/2026
Objection resolved — Addressed
02/03/2026
Objection resolved — Addressed
02/03/2026
Objection resolved — Addressed
02/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/03/2026
Special inspection requirement — Maintenance information
02/03/2026
Special inspection requirement — Sprinkler Systems
02/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/03/2026
Special inspection requirement — Energy Code Compliance Inspections
01/21/2026
Objection resolved — Addressed
01/08/2026
Objection raised — Other
12/22/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
09/20/2024
Objection raised — Other
05/15/2024
Objection resolved — Addressed
04/02/2024
Special inspection requirement — Electric vehicle service equipment requirements
04/01/2024
Special inspection requirement — Duct leakage testing, insulation and design
04/01/2024
Special inspection requirement — Fenestration areas
04/01/2024
Special inspection requirement — Fenestration air leakage
04/01/2024
Special inspection requirement — Ventilation and air distribution system
04/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
04/01/2024
Special inspection requirement — Insulation placement and R values
12/15/2023
Objection raised — Structural
12/15/2023
Objection raised — Inspections
11/22/2023
Objection raised — Zoning
11/01/2023
Objection raised — Scope
10/31/2023
Objection raised — Scope
10/31/2023
Objection raised — Zoning
10/31/2023
Objection raised — Admin
10/16/2023
Filed — Alteration CO
THE PROPOSED INTERIOR REMODELING INCLUDES THE CELLAR, FIRST FLOOR, AND SECOND FLOOR, AS WELL ASTHE CONSTRUCTION OF A NEW ROOF AND BULKHEAD.
Q00944374-S2
10/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/10/2023
Filed — Alteration CO
THE PROPOSED INTERIOR REMODELING INCLUDES THE CELLAR, FIRST FLOOR, AND SECOND FLOOR, AS WELL ASTHE CONSTRUCTION OF A NEW ROOF AND BULKHEAD.
Q00944374-I1
10/10/2023
Filed — Alteration
Q00933069-I1
10/10/2023
Special inspection requirement — Structural Cold-Formed Steel
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
10/10/2023
Special inspection requirement — Metering
10/10/2023
Special inspection requirement — Structural Steel - Details
10/10/2023
Special inspection requirement — Permanent certificate
10/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
10/10/2023
Special inspection requirement — Interior lighting power
10/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
10/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/10/2023
Special inspection requirement — Heating Systems
10/10/2023
Special inspection requirement — Air barrier - visual inspection
10/10/2023
Special inspection requirement — Maintenance information
10/06/2023
Special inspection requirement — Final
10/06/2023
Special inspection requirement — Mechanical Systems
05/14/2015
Violation issued (HPD, closed)
B
12/10/2014
Violation issued (HPD, open)
B
12/10/2014
Violation issued (HPD, open)
C
12/10/2014
Violation issued (HPD, open)
B
12/10/2014
Violation issued (HPD, open)
B
12/10/2014
Violation issued (HPD, open)
B
Nothing on file for this building.
1 project · most recent 10/16/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/16/2023——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric NTXWST09A11AA 10,900 BTU · Fan Coil Indoor ×7
MSZ-GL24NA 27,600 BTU · Fan Coil Indoor ×5
1 project · most recent 10/16/2023
Sprinkler System
FiledStatusContractorScope
10/16/2023——Sprinkler System
1 project · most recent 10/16/2023
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
10/16/2023——Gas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 09/03/2018
General Wiring
FiledStatusContractorScope
09/03/2018Permit IssuedFSM ELECTRICAL CORPORATIOGeneral Wiring
1 project · most recent 10/16/2023
FiledStatusContractorScope
10/16/2023——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
02/03/2026HVAC-R and service water heating equipment—energy_progress
02/03/2026HVAC-R and service water piping design and insulation—energy_progress
02/03/2026Maintenance information—energy_progress
02/03/2026Sprinkler Systems—special
02/03/2026HVAC-R and service water heating system controls—energy_progress
02/03/2026Energy Code Compliance Inspections—progress
04/02/2024Electric vehicle service equipment requirements—energy_progress
04/01/2024Duct leakage testing, insulation and design—energy_progress
04/01/2024Fenestration areas—energy_progress
04/01/2024Fenestration air leakage—energy_progress
04/01/2024Ventilation and air distribution system—energy_progress
04/01/2024Fenestration and door U-factor and product ratings—energy_progress
04/01/2024Insulation placement and R values—energy_progress
10/16/2023Fire-Resistant Penetrations and Joints—special
10/10/2023Structural Cold-Formed Steel—special
10/10/2023Fire-Resistant Penetrations and Joints—special
10/10/2023HVAC-R and service water heating system controls—energy_progress
10/10/2023Metering—energy_progress
10/10/2023Structural Steel - Details—special
10/10/2023Permanent certificate—energy_progress
10/10/2023HVAC-R and service water piping design and insulation—energy_progress
10/10/2023Interior lighting power—energy_progress
10/10/2023HVAC-R and service water heating equipment—energy_progress
10/10/2023Structural Stability – Alterations of existing buildings—special
10/10/2023Heating Systems—special
Latest 25 of 29.
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026Q00933069-I1Request digital key ↗
08/24/2026Q00944374-S2Request digital key ↗
08/24/2026Q00944374-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/24/2026Q00944374-I1Open ↗
08/13/2026Q00944374-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026Q00933069-I1Open ↗
08/13/2026Q00944374-S2Open ↗
08/13/2026Q00944374-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00944374-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00944374-I1Open ↗
08/13/2026Q00944374-S2Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00944374-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00944374-I1Open ↗