← Back
Primarily 2 family with 1 store or office
95-12 JAMAICA AVENUE
QUEENS · Woodhaven · BIN 4184382
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R6AZoning
3,180 sfGross Floor Area
3Units
14 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,149 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 3Under Construction2p · 2 filings · 6 docs
Floor 2Under Construction4p · 2 filings · 6 docs
Floor 1Under Construction2p · 2 filings · 6 docs
CellarUnder Construction3p · 3 filings · 8 docs
Site & exteriorUnder Construction1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 95-12 JAMAICA AV103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI311/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor404/09/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394111/26/2025
Building Lifecycle
All (44)Filed (3)Permit Issued (4)Violation (25)Inspection (7)Special Inspection (5)
05/11/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/11/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/04/2025
Permit issued — Plumbing
Q01317058-I1-PL
12/04/2025
Permit issued — Boiler Equipment
Q01317061-I1-BE
12/02/2025
Permit issued — General Construction
Q01320676-I1-GC
12/02/2025
Permit issued — Mechanical Systems
Q01320676-I1-MS
11/26/2025
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL SPACE IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01317061-I1
11/26/2025
Filed — Alteration
RESOLVE DOB VIOLATIONS: VIO25-02114 AND VIO25-02112; RENOVATION OF EXISTING CELLAR, 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.MECHANICAL WORK FOR EXHAUST HOOD IN EXIST
Q01320676-I1
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
11/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
11/21/2025
Filed — Alteration
RESOLVE DOB VIOLATIONS: VIO25-02114 AND VIO25-02112; RENOVATION OF EXISTING CELLAR, 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK AS PER PLAN: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCC
Q01317058-I1
11/18/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
11/18/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
09/12/2025
Violation issued (FDNY_ORDER, closed)
09/12/2025
Violation issued (FDNY_ORDER, closed)
09/12/2025
Violation issued (FDNY_ORDER, closed)
09/12/2025
Violation issued (FDNY_ORDER, closed)
09/12/2025
Violation issued (FDNY_ORDER, closed)
09/12/2025
Violation issued (FDNY_ORDER, closed)
09/10/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/10/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/10/2025
Violation issued (FDNY_NOV, closed)
09/10/2025
Violation issued (FDNY_NOV, closed)
09/05/2025
Violation issued (FDNY_ORDER, closed)
09/05/2025
Violation issued (FDNY_ORDER, closed)
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/04/2002
Violation issued (HPD, open)
B
04/04/2002
Violation issued (HPD, open)
B
04/04/2002
Violation issued (HPD, open)
A
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2000
Violation issued (HPD, open)
B
11/08/2000
Violation issued (HPD, open)
B
11/08/2000
Violation issued (HPD, open)
B
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/1990
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG12/04/2025
DOB NOWBoiler EquipmentPermit IssuedJOHN FITZGERALD PLBG &HTG12/04/2025
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC12/02/2025
DOB NOWMechanical SystemsPermit IssuedKALE CONSTRUCTION INC12/02/2025
BISPLISSUEDCATMAN PLUMBING INC02/22/1993
BISPLISSUEDCATMAN PLUMBING INC02/22/1993
BISFPISSUEDMATER FIRE PREV. SYSTEMS, INC.02/01/1993
BISEQISSUEDW.C.L01/27/1993
BISOTISSUEDW.C.L01/27/1993
1 project · most recent 11/26/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025Permit IssuedKALE CONSTRUCTION INCVentilation Systems
Ventilation
Panasonic FV-30VQ56 30,000 CFM · Exhaust Fan ×1
1 project · most recent 11/21/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/21/2025Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
1 project · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/11/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/11/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/26/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
11/26/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
11/26/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
11/18/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
11/18/2025FinalFARHAD BASSIRI-TEHRANIprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01317058-I1Request digital key ↗
08/18/2026Q01320676-I1Request digital key ↗
08/18/2026Q01317061-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01317058-I1Open ↗
08/13/2026Q01317061-I1Open ↗
08/13/2026Q01320676-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q01320676-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01320676-I1Open ↗