← Back
Two family converted from one family
95-14 93 STREET
QUEENS · BIN 4187565
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R4-1Zoning
2,850 sfGross Floor Area
2Units
Rent Stabilized35 Open Violations ▸FDNY Report ↗
Two family converted from one family · 5,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Architecture
Floor 213p · 1 filing · 20 docs
Floor 115p · 2 filings · 20 docs
Cellar14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LV CONTRACTING SOLUTIONS INC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/05/2021$666K—— → —$234/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
QUAMAR ZAMAN904/26/2025
CHANDA ENGINEERING CONSULTANT PC102/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHANDA ENGINEERING CONSULTANT1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A TAHER CONTRACTING CO INGeneral Contractor203/21/2026
HAY MECHANICAL SOLUTIONSPlumbing207/08/2026
IMPERIAL CONTRAC OF NYC CGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842904/26/2025
Building Lifecycle
All (96)Filed (10)Permit Issued (4)Signed Off (2)Violation (37)Inspection (7)Objection (6)Special Inspection (30)
11/25/2025
Violation issued (HPD, open)
I
08/26/2025
Signed off — Alteration
Two (2) combi boilers, 1 floor drain installation at cellar. At 1st floor 1 new 3 fixture bathroom and handwash sink, kitchen installation. At 2nd floor 1 new 3 fixture bathroom installation. 1st & 2nd floor existing bathrooms & kitchens relocation.
Q00653498-I1
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
05/05/2025
Special inspection requirement — Maintenance information
QUAMAR ZAMAN
05/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QUAMAR ZAMAN
05/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
QUAMAR ZAMAN
05/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
QUAMAR ZAMAN
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
QUAMAR ZAMAN
04/26/2025
Filed — Alteration
Two (2) combi boilers, 1 floor drain installation at cellar. At 1st floor 1 new 3 fixture bathroom and handwash sink, kitchen installation. At 2nd floor 1 new 3 fixture bathroom installation. 1st & 2nd floor existing bathrooms & kitchens relocation.
Q00653498-P5
04/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QUAMAR ZAMAN
04/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
QUAMAR ZAMAN
04/26/2025
Special inspection requirement — Maintenance information
QUAMAR ZAMAN
04/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
QUAMAR ZAMAN
04/26/2025
Special inspection requirement — Energy Code Compliance Inspections
QUAMAR ZAMAN
04/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
04/01/2025
Signed off — Alteration
Temporary construction fence installation for existing house renovation/alteration work.
Q00685638-I1
03/28/2025
Permit issued — Construction Fence
Q00685638-I1-FN
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
12/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
QUAMAR ZAMAN
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
QUAMAR ZAMAN
12/16/2024
Special inspection requirement — Insulation placement and R values
QUAMAR ZAMAN
12/16/2024
Special inspection requirement — Interior lighting power
QUAMAR ZAMAN
12/16/2024
Special inspection requirement — Air barrier - visual inspection
QUAMAR ZAMAN
12/05/2024
Violation issued (HPD, open)
I
11/16/2024
Filed — Alteration CO
Horizontal extension left and right side of the building and interior renovation including lamination wall, replace floor and ceiling finishes and painting to get new certificate of occupancy.
Q00604030-P2
11/14/2024
Special inspection requirement — Insulation placement and R values
QUAMAR ZAMAN
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
QUAMAR ZAMAN
11/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
QUAMAR ZAMAN
11/14/2024
Special inspection requirement — Interior lighting power
QUAMAR ZAMAN
11/14/2024
Special inspection requirement — Air barrier - visual inspection
QUAMAR ZAMAN
10/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/28/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2024
Filed — Alteration
Two (2) combi boilers, 1 floor drain installation at cellar. At 1st floor 1 new 3 fixture bathroom and handwash sink, kitchen installation. At 2nd floor 1 new 3 fixture bathroom installation. 1st & 2nd floor existing bathrooms & kitchens relocation.
Q00653498-P4
04/25/2024
Filed — Alteration
Two (2) combi boilers, 1 floor drain installation at cellar. At 1st floor 1 new 3 fixture bathroom and handwash sink, kitchen installation. At 2nd floor 1 new 3 fixture bathroom installation. 1st & 2nd floor existing bathrooms & kitchens relocation.
Q00653498-P3
04/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
04/25/2024
Special inspection requirement — Energy Code Compliance Inspections
QUAMAR ZAMAN
04/25/2024
Special inspection requirement — Maintenance information
QUAMAR ZAMAN
04/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
QUAMAR ZAMAN
04/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
QUAMAR ZAMAN
04/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
QUAMAR ZAMAN
04/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2024
Permit issued — Plumbing
Q00653498-I1-PL
11/29/2023
Violation issued (HPD, open)
I
10/09/2023
Permit issued — General Construction
Q00604030-I1-GC
02/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/13/2022
Filed — Alteration
Two (2) combi boilers, 1 floor drain installation at cellar. At 1st floor 1 new 3 fixture bathroom and handwash sink, kitchen installation. At 2nd floor 1 new 3 fixture bathroom installation. 1st & 2nd floor existing bathrooms & kitchens relocation.
Q00653498-P2
11/19/2022
Objection resolved — Addressed
11/19/2022
Objection resolved — Addressed
11/19/2022
Objection resolved — Addressed
11/18/2022
Violation issued (HPD, open)
I
09/06/2022
Filed — Alteration
Two (2) combi boilers, 1 floor drain installation at cellar. At 1st floor 1 new 3 fixture bathroom and handwash sink, kitchen installation. At 2nd floor 1 new 3 fixture bathroom installation. 1st & 2nd floor existing bathrooms & kitchens relocation.
Q00653498-P1
08/30/2022
Objection raised — Zoning
08/30/2022
Objection raised — Fire_Protection
08/30/2022
Objection raised — Scope
08/24/2022
Filed — Alteration CO
Horizontal extension left and right side of the building and interior renovation including lamination wall, replace floor and ceiling finishes and painting to get new certificate of occupancy.
Q00604030-P1
05/18/2022
Permit issued — Plumbing
Q00653498-I1-PL
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offA TAHER CONTRACTING CO IN03/28/2025
DOB NOWPlumbingSigned-offHAY MECHANICAL SOLUTIONS01/05/2024
DOB NOWGeneral ConstructionPermit IssuedIMPERIAL CONTRAC OF NYC C10/09/2023
DOB NOWPlumbingSigned-offHAY MECHANICAL SOLUTIONS05/18/2022
1 project · most recent 05/05/2022
General Wiring
FiledStatusContractorScope
05/05/2022CompleteJSP ELECTL CNTNG CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
05/05/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
05/05/2025Maintenance informationQUAMAR ZAMANenergy_progress
05/05/2025HVAC-R and service water piping design and insulationQUAMAR ZAMANenergy_progress
05/05/2025HVAC-R and service water heating equipmentQUAMAR ZAMANenergy_progress
05/05/2025HVAC-R and service water heating system controlsQUAMAR ZAMANenergy_progress
05/05/2025Energy Code Compliance InspectionsQUAMAR ZAMANprogress
04/26/2025HVAC-R and service water piping design and insulationQUAMAR ZAMANenergy_progress
04/26/2025HVAC-R and service water heating system controlsQUAMAR ZAMANenergy_progress
04/26/2025Maintenance informationQUAMAR ZAMANenergy_progress
04/26/2025HVAC-R and service water heating equipmentQUAMAR ZAMANenergy_progress
04/26/2025Energy Code Compliance InspectionsQUAMAR ZAMANprogress
04/26/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
12/16/2024Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
12/16/2024Fire-Resistance Rated ConstructionQUAMAR ZAMANprogress
12/16/2024Energy Code Compliance InspectionsQUAMAR ZAMANprogress
12/16/2024Insulation placement and R valuesQUAMAR ZAMANenergy_progress
12/16/2024Interior lighting powerQUAMAR ZAMANenergy_progress
12/16/2024Air barrier - visual inspectionQUAMAR ZAMANenergy_progress
11/14/2024Insulation placement and R valuesQUAMAR ZAMANenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
11/14/2024Energy Code Compliance InspectionsQUAMAR ZAMANprogress
11/14/2024Fire-Resistance Rated ConstructionQUAMAR ZAMANprogress
11/14/2024Interior lighting powerQUAMAR ZAMANenergy_progress
11/14/2024Air barrier - visual inspectionQUAMAR ZAMANenergy_progress
04/25/2024Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
Latest 25 of 42.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026Q00685638-I1Request digital key ↗
08/25/2026Q00604030-I1Request digital key ↗
08/25/2026Q00604030-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/25/2026Q00604030-I1Open ↗
08/15/2026Q00604030-P1Open ↗
08/13/2026Q00604030-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00604030-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature35
09/01/2026Q00653498-P2Open ↗
09/01/2026Q00653498-P2Open ↗
09/01/2026Q00653498-P2Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026Q00604030-I1Open ↗
08/25/2026Q00604030-P1Open ↗
08/22/2026Q00653498-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00653498-P2Open ↗
09/01/2026Q00653498-I1Open ↗
08/29/2026Q00653498-P3Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/25/2026Q00604030-I1Open ↗
08/15/2026Q00604030-P1Open ↗
08/13/2026Q00604030-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00604030-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026Q00604030-I1Open ↗
08/22/2026Q00653498-P4Open ↗
08/22/2026Q00653498-I1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00653498-I1Open ↗
08/13/2026Q00604030-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/25/2026Q00604030-I1Open ↗
08/15/2026Q00604030-P1Open ↗
08/13/2026Q00604030-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/25/2026Q00604030-I1Open ↗
08/15/2026Q00604030-P1Open ↗
08/13/2026Q00604030-P2Open ↗
▸DOB NOWPlot Diagram3
08/25/2026Q00604030-I1Open ↗
08/15/2026Q00604030-P1Open ↗
08/13/2026Q00604030-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/25/2026Q00604030-I1Open ↗
08/15/2026Q00604030-P1Open ↗
08/13/2026Q00604030-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00604030-I1Open ↗