← Back
Primarily 4 family with 1 store or office
95 2 AVENUE
MANHATTAN · BIN 1006626
💬 Discuss this project
1845Year Built
5Stories
S4Building Class
R7AZoning
7,719 sfGross Floor Area
5Units
Rent Stabilized4 Open Violations ▸
Primarily 4 family with 1 store or office · Owner of record: IN GROUP, . · 2,494 sf lot · 3.1 FAR built · Flood zone X
Locations of Work
Architecture
Roof7p · 1 filing · 4 docs
Bulkhead1p · 1 filing · 4 docs
Floor 31p · 1 filing · 4 docs
Floor 2
Floor 11p · 1 filing · 7 docs
Cellar2p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HELM MANAGEMENT1907/08/2026
IN GROUP, .903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP309/08/2025
CHUN ENGINEERING CONSULTANT PLLC202/04/2025
HUAN DESIGN INC.106/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor207/08/2026
CAVALRY LLCGeneral Contractor203/21/2026
STEWART, DUDLEYElectrical103/21/2026
A ELECTRICAL MAIN SVC INCElectrical103/22/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
FORT-CICA ROOFING & GENGeneral Contractor104/09/2026
ASHLEY, ANTHONYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHUN ENGINEERING CONSULTA9605102/04/2025
HUAN DESIGN INC7669106/24/2024
AA BUILDING & INSPECTION1519112/22/2022
M. INT'L ENGINEERING PLLC3129112/22/2022
Building Lifecycle
All (83)Filed (6)Permit Issued (5)Signed Off (3)Violation (60)Special Inspection (9)
01/22/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01274457-I1
01/22/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01274458-I1
09/19/2025
Violation issued (ECB, open)
Construction
09/19/2025
Violation issued (ECB, open)
Construction
09/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01274457-P1
09/05/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01274458-I1
09/05/2025
Permit issued — Supported Scaffold
M01274458-I1-SF
09/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01274457-I1
09/03/2025
Permit issued — Sidewalk Shed
M01274457-I1-SH
09/01/2025
Violation issued (HPD, closed)
B
09/01/2025
Violation issued (HPD, closed)
B
09/01/2025
Violation issued (HPD, closed)
B
09/01/2025
Violation issued (HPD, closed)
B
08/11/2025
Permit issued — General Construction
M01084304-I1-GC
02/04/2025
Filed — Alteration
M01084304-I1
09/12/2024
Violation issued (HPD, closed)
B
09/12/2024
Violation issued (HPD, closed)
B
07/16/2024
Permit issued — General Construction
M01057397-I1-GC
06/24/2024
Filed — Alteration
PLUMBING WORK ON 1ST FLOOR AND CELLAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01057397-I1
06/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
05/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
05/28/2024
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
05/28/2024
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
05/28/2024
Special inspection requirement — Final
ZHENHUAN XU
05/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
05/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
05/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
09/14/2023
Violation issued (HPD, open)
B
04/03/2023
Signed off — Alteration
M08049939-I1
02/21/2023
Permit issued — General Construction
M08049939-I1-GC
12/22/2022
Filed — Alteration
M08049939-I1
12/13/2022
Violation issued (HPD, open)
B
12/13/2022
Violation issued (HPD, closed)
B
12/06/2022
Violation issued (HPD, closed)
B
12/06/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
A
09/14/2018
Violation issued (HPD, closed)
B
12/10/2013
Violation issued (HPD, closed)
C
12/10/2013
Violation issued (HPD, closed)
C
05/24/2011
Violation issued (ECB, closed)
Construction
02/09/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2011
Violation issued (ECB, closed)
Construction
12/15/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2010
Violation issued (ECB, closed)
Construction
11/09/2010
Violation issued (ECB, closed)
Construction
11/09/2010
Violation issued (ECB, closed)
Construction
09/14/2010
Violation issued (ECB, closed)
Construction
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2000
Violation issued (HPD, closed)
B
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/13/1990
Violation issued (HPD, closed)
B
04/03/1990
Violation issued (HPD, closed)
C
04/03/1990
Violation issued (HPD, closed)
B
04/03/1990
Violation issued (HPD, closed)
B
04/03/1990
Violation issued (HPD, closed)
C
02/24/1986
Violation issued (HPD, closed)
B
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/05/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/03/2025
DOB NOWGeneral ConstructionPermit IssuedFORT-CICA ROOFING & GEN08/11/2025
DOB NOWGeneral ConstructionPermit IssuedKLE CONSTRUCTION INC07/16/2024
DOB NOWGeneral ConstructionSigned-offCAVALRY LLC02/21/2023
BISEQISSUEDH2L MILLWORK CONSTRUCTION09/13/2007
BISOTISSUEDH2L MILLWORK CONSTRUCTION09/13/2007
BISBLISSUEDCALARAY GAS HGHT CORP10/15/1999
BISPLISSUEDCALARAY GAS HGHT CORP10/15/1999
1 project · most recent 06/24/2024
Water/Sanitary
FiledStatusContractorScope
06/24/2024——Water/Sanitary
2 projects · most recent 08/19/2025
General Wiring
FiledStatusContractorScope
08/19/2025CompleteBOROWIDE ELECT'L CONTR'S—
08/20/2024Permit IssuedA ELECTRICAL MAIN SVC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/19/2024HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
05/28/2024Tenant Protection Plan ComplianceZHENHUAN XUspecial
05/28/2024Mechanical SystemsZHENHUAN XUspecial
05/28/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
05/28/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
05/28/2024FinalZHENHUAN XUprogress
05/28/2024HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
05/28/2024HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
05/28/2024Fire-Resistance Rated ConstructionZHENHUAN XUprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026M08049939-I1Request digital key ↗
08/27/2026M01057397-I1Request digital key ↗
08/25/2026M01084304-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026M01084304-I1Open ↗
08/13/2026M08049939-I1Open ↗
08/13/2026M01057397-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026M08049939-I1Open ↗
08/25/2026M01084304-I1Open ↗
08/21/2026M01274458-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026M01057397-I1Open ↗
08/24/2026M01057397-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026M01057397-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026M08049939-I1Open ↗
08/25/2026M01084304-I1Open ↗
08/13/2026M01057397-I1Open ↗