| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/25/2026 | Permit Issued | ADI CONTRACTING LLC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PUHY-HP72YNUA1 72,000 BTU · Vrf Outdoor ×1 PUHY-P72YNU-4 72,000 BTU · Vrf Outdoor ×1 Ventilation Mitsubishi Electric PEFY-P72NMHU-E-OA 72,000 BTU · Vrf Indoor ×1 |
| 06/19/2023 | Permit Issued | PAUL M MAINTENANCE INC | Associated Ducts and Piping | Ducts & Piping N/A N/a 1 BTU · Ductwork ×1 |
| 01/07/2022 | Permit Issued | PREMIER MECHANICAL SERVIC | Air Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems | |
| 01/06/2022 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric PUY-A12NKA7 12,000 BTU · Condensing Unit ×2 PUY-A36NKA7 36,000 BTU · Condensing Unit ×2 Aaon RN-050-3-0 533,750 BTU · Rooftop Unit ×1 Heating Aaon RN-050-3-0 540,000 BTU · Rooftop Unit ×1 Ventilation Aaon RN-050-3-0 533,750 BTU · Rooftop Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/05/2022 | — | — | 241 heads |
| 04/02/2021 | Permit Issued | PARAMOUNT SERVICES, LLC | 18 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/18/2025 | Permit Issued | MACCARONE PLUMBING INC | Gas, Water/Sanitary |
| 06/19/2023 | Signed-off | A. PILATO PLUMBING LLC | Water/Sanitary |
| 06/05/2023 | Signed-off | VILLAGE P & H NY INC | Water/Sanitary |
| 11/10/2022 | — | — | Water/Sanitary |
| 01/05/2022 | — | — | Gas, Medical Gas, Water/Sanitary |
| 04/02/2021 | Permit Issued | VILLAGE P & H NY INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/29/2026 | Permit Issued | DOUBLE "R" ELEC'L CONTR'G | General Wiring |
| 05/22/2026 | Permit Issued | NEE ELECTRICAL, LLC | — |
| 05/23/2025 | Permit Issued | TROON ELECTRIC OF NEW YOR | General Wiring |
| 04/28/2025 | Complete | L.E.A. ELECTRIC CORP. | General Wiring |
| 09/27/2023 | Complete | JVR ELECTRIC INC | General Wiring |
| 09/26/2023 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 09/18/2023 | Complete | CRANA ELECTRIC, INC | General Wiring |
| 09/12/2023 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 09/11/2023 | Permit Issued | DOUMAS ELECTRIC INC. | General Wiring |
| 06/20/2023 | Complete | PM ELEC'L MAINTENANCE INC | General Wiring |
| 04/26/2023 | Complete | CRANA ELECTRIC, INC | General Wiring |
| 02/16/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 04/13/2022 | Permit Issued | AMERGY ELECTRIC OF NY INC | General Wiring |
| 02/01/2022 | Complete | NEE ELECTRICAL, LLC | — |
| 11/20/2021 | Complete | SRM ELECTRICAL SVC INC | General Wiring, Lighting |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/31/2023 | — | — | Steel, Concrete |
| 05/18/2023 | Signed-off | THE WHITING-TURNER CONTRA | 2 scope_items |
| 04/10/2023 | Signed-off | THE WHITING-TURNER CONTRA | 2 scope_items |
| 01/05/2022 | — | — | Steel, Concrete |
| Owner | Filings | Most Recent |
|---|---|---|
| REGO PARK OFFICE TOWER | 43 | 03/22/2026 |
| 95 TOWER LAND LIMITED PAR | 13 | 03/22/2026 |
| 95 TOWERLAND LP | 1 | 03/22/2026 |
| 95 TOWER LAND LTD PARTNER | 2 | 03/22/2026 |
| 95-25 TOWER LAND L.P. | 1 | 03/22/2026 |
| QNS OFFICE TOWER LTC PART | 1 | 03/22/2026 |
| QNS OFFICE TOWER LTD PART | 1 | 03/22/2026 |
| QNS OFFICE TOWER ASSOC | 3 | 03/22/2026 |
| QUEENS OFFICE TOWEL LP | 278 | 03/22/2026 |
| LEFRAK ORGANIZATION | 32 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 03/28/2017 | $139.9M | — | QUEENS OFFICE TOWER LIMITED PARTNERSHIP → REGO PARK OFFICE TOWER, LLC | $391/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| BLADYKAS ENGINEERING, P.C. | 29 | 06/25/2026 |
| TDM CONSULTING ENGINEER | 1 | 06/25/2026 |
| ALEXANDER BADALAMENTI | 1 | 06/24/2026 |
| JASON M APTOWITZ CONSULTING ENGINEE | 1 | 06/22/2026 |
| CME ENGINEERING SERVICES DPC | 24 | 06/03/2025 |
| MURDOCH ENGINEERING | 2 | 02/25/2025 |
| BR DESIGN ASSOCIATES LLC | 2 | 12/05/2024 |
| SALVATOR A. CARADONNA JR. | 7 | 10/08/2024 |
| RANDALL P. COLLINS ARCHITECT, PC | 6 | 05/30/2024 |
| SHAABAN ENGINEERING, LLC | 5 | 05/30/2024 |
| JRS ARCHITECT, PC | 1 | 05/22/2024 |
| LMW ENGINEERING GROUP LLC | 1 | 12/29/2023 |
| LEON SKVIRSKY PE | 5 | 09/26/2023 |
| JACK GREEN ASSOCIATES | 4 | 09/19/2023 |
| FACADE MD ARCHITECTURE AND ENGINEER | 2 | 09/05/2023 |
| ACTIVE DESIGN GROUP ENGINEERING | 3 | 07/07/2023 |
| THE MCGUIRE GROUP ARCHITECTS | 1 | 07/07/2023 |
| REUTHER BOWEN | 6 | 05/31/2023 |
| EFH ARCHITECTURE | 5 | 05/31/2023 |
| KHACHATURIAN ENGINEERING ASSOCIATES | 4 | 02/09/2023 |
| DEGIAIMO GROUP ARCHITECT LLP | 2 | 01/18/2023 |
| TOHFAZ UDDIN PE PC | 2 | 01/18/2023 |
| LEVIN ENGINEERING PLLC | 2 | 08/17/2022 |
| AMARA ASSOCIATES LLC | 1 | 01/04/2022 |
| STONEFIELD ENGINEERING & DESIGN | 1 | 10/22/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| J A EXPEDITING | 22 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 76 | 03/21/2026 |
| KAZAM CONSULTANTS | 10 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 9 | 03/21/2026 |
| SUPPORT BUILDINGS OF NEW YORK | 40 | 03/21/2026 |
| BUILDING BROTHERS | 10 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 8 | 03/21/2026 |
| LEWSAN CONSULTING | 2 | 03/21/2026 |
| D R BROWN | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| DEGIAIMO GROUP BUILDING C | General Contractor | 16 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 14 | 07/08/2026 |
| PREMIER MECHANICAL SERVIC | General Contractor | 14 | 07/08/2026 |
| GANNON CONTRACTING LLC | General Contractor | 11 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 11 | 07/08/2026 |
| THE WHITING-TURNER CONTRA | General Contractor | 10 | 07/08/2026 |
| ADI CONTRACTING LLC | General Contractor | 7 | 09/22/2026 |
| ULTIMATE SIGNS DESIGNS | Scaffold | 5 | 07/08/2026 |
| NORTH SHORE NEON SIGN | Scaffold | 5 | 07/08/2026 |
| VERICON CONSTRUCTION CO | General Contractor | 5 | 07/08/2026 |
| VALMATO CONSTRUCTION INC | General Contractor | 5 | 07/08/2026 |
| MACCARONE PLUMBING INC | Plumbing | 4 | 07/08/2026 |
| AMERICAN SIGN ELECL CON | Scaffold | 4 | 07/08/2026 |
| EAGLE SCAFFOLDING SVCS INC | General Contractor | 4 | 03/21/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 4 | 07/08/2026 |
| PERRY MECHANICAL CONTRACT | General Contractor | 3 | 03/21/2026 |
| PAUL M MAINTENANCE INC | General Contractor | 3 | 07/08/2026 |
| JOSEPH O'GRADY P & H INC | Plumbing | 3 | 07/08/2026 |
| VILLAGE P & H NY INC | Plumbing | 2 | 07/08/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 2 | 07/08/2026 |
| PAUL SIGNS INC | General Contractor | 2 | 07/08/2026 |
| TJ SIGNS UNLIMITED | Scaffold | 2 | 07/08/2026 |
| CRANA ELECTRIC, INC | Electrical | 2 | 03/22/2026 |
| CARE ENTERPRISES, INC | General Contractor | 2 | 03/21/2026 |
| VILLAGE P & H NY INC | Fire Protection | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CC@A ENGINEERING P.C | 1854 | 4 | 06/25/2026 |
| JASON M APTOWITZ CONSULTI | 5671 | 1 | 06/22/2026 |
| SKYLINE ENGINEERING, PLLC | 267 | 11 | 06/03/2025 |
| JACK GREEN ASSOCIATES | 422 | 23 | 03/18/2025 |
| LMW ENGINEERING GROUP LLC | 279 | 1 | 12/29/2023 |
| SGM ENGINEERING | 2366 | 9 | 09/19/2023 |
| DNA CONTROLLED INSPECTION | 554 | 22 | 07/11/2023 |
| ESNYC CONSULTING INC | 4099 | 16 | 07/07/2023 |
| SPECIAL INSPECTION SERVIC | 1200 | 3 | 09/09/2021 |
| GREGORY V. PEROTTO, P.E. | 947 | 1 | 12/15/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | A I N CONTRACTING CORP | 09/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ADI CONTRACTING LLC | 09/21/2026 |
| DOB NOW | Structural | Permit Issued | ADI CONTRACTING LLC | 09/10/2026 |
| DOB NOW | General Construction | Signed-off | PAUL SIGNS INC | 03/12/2025 |
| DOB NOW | Sign | Signed-off | AMERICAN SIGN & ELECL CON | 03/05/2025 |
| DOB NOW | Sprinklers | Signed-off | ASHLAR MECHANICAL CORP | 12/19/2024 |
| DOB NOW | Mechanical Systems | Signed-off | 4IR IDEAL | 12/18/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 12/18/2024 |
| DOB NOW | General Construction | Signed-off | BENCHMARK BUILDERS LLC | 12/10/2024 |
| DOB NOW | General Construction | Signed-off | VALMATO CONSTRUCTION INC | 11/21/2024 |
| DOB NOW | Mechanical Systems | Signed-off | VALMATO CONSTRUCTION INC | 11/21/2024 |
| DOB NOW | General Construction | Signed-off | PAUL SIGNS INC | 11/04/2024 |
| DOB NOW | Sign | Signed-off | AMERICAN SIGN & ELECL CON | 10/15/2024 |
| DOB NOW | Mechanical Systems | Signed-off | GANNON CONTRACTING LLC | 08/28/2024 |
| DOB NOW | Plumbing | Permit Issued | MACCARONE PLUMBING INC | 08/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | GANNON CONTRACTING LLC | 07/10/2024 |
| DOB NOW | General Construction | Signed-off | VERICON CONSTRUCTION CO | 06/20/2024 |
| DOB NOW | General Construction | Signed-off | GANNON CONTRACTING LLC | 06/04/2024 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 05/31/2024 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 05/31/2024 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 05/31/2024 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 05/30/2024 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 05/30/2024 |
| DOB NOW | Sign | Signed-off | AMERICAN SIGN & ELECL CON | 09/22/2023 |
| DOB NOW | Sign | Signed-off | AMERICAN SIGN & ELECL CON | 09/12/2023 |
| DOB NOW | Plumbing | Signed-off | A. PILATO PLUMBING LLC | 08/16/2023 |
| DOB NOW | Plumbing | Signed-off | VILLAGE P & H NY INC | 08/16/2023 |
| DOB NOW | General Construction | Permit Issued | PAUL M MAINTENANCE INC | 08/10/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | PAUL M MAINTENANCE INC | 08/10/2023 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 07/19/2023 |
| DOB NOW | Sprinklers | Signed-off | VILLAGE P & H NY INC | 07/10/2023 |
| DOB NOW | General Construction | Signed-off | MERIDIAN CONSTRUCTION GRP | 07/07/2023 |
| DOB NOW | General Construction | Signed-off | ADI CONTRACTING LLC | 07/07/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | ADI CONTRACTING LLC | 07/07/2023 |
| DOB NOW | Structural | Signed-off | THE WHITING-TURNER CONTRA | 06/02/2023 |
| DOB NOW | Structural | Signed-off | THE WHITING-TURNER CONTRA | 06/01/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | PREMIER MECHANICAL SERVIC | 05/25/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | PREMIER MECHANICAL SERVIC | 05/25/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | PREMIER MECHANICAL SERVIC | 05/25/2023 |
| DOB NOW | General Construction | Permit Issued | THE WHITING-TURNER CONTRA | 05/15/2023 |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/19/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/16/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/16/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/09/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/22/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/27/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/27/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/13/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/24/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/02/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/30/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/22/2023 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 09/20/2023 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 09/20/2023 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 09/20/2023 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 09/12/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/12/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/12/2023 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 08/30/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/23/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/21/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/21/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/10/2026 | Post-installed Anchors | CHAROULIS CHARALAMBOUS | special |
| 06/10/2026 | Energy Code Compliance Inspections | CHAROULIS CHARALAMBOUS | progress |
| 06/10/2026 | Maintenance information | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/10/2026 | HVAC-R and service water heating equipment | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/10/2026 | Fire-Resistant Penetrations and Joints | CHAROULIS CHARALAMBOUS | special |
| 06/10/2026 | HVAC-R and service water heating system controls | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/10/2026 | HVAC-R and service water piping design and insulation | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/05/2026 | Fire-Resistant Penetrations and Joints | CHAROULIS CHARALAMBOUS | special |
| 06/05/2026 | HVAC-R and service water piping design and insulation | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/05/2026 | Final | JASON APTOWITZ | progress |
| 06/05/2026 | Post-installed Anchors | CHAROULIS CHARALAMBOUS | special |
| 06/05/2026 | Maintenance information | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/05/2026 | HVAC-R and service water heating equipment | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/05/2026 | Energy Code Compliance Inspections | CHAROULIS CHARALAMBOUS | progress |
| 06/05/2026 | HVAC-R and service water heating system controls | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/05/2026 | Shutoff dampers | CHAROULIS CHARALAMBOUS | energy_progress |
| 06/05/2026 | Structural Stability – Alterations of existing buildings | JASON APTOWITZ | special |
| 05/20/2026 | Fire-Resistant Penetrations and Joints | CHAROULIS CHARALAMBOUS | special |
| 05/20/2026 | Interior lighting power | CHAROULIS CHARALAMBOUS | energy_progress |
| 05/20/2026 | Lighting controls | CHAROULIS CHARALAMBOUS | energy_progress |
| 05/20/2026 | Energy Code Compliance Inspections | CHAROULIS CHARALAMBOUS | progress |
| 05/20/2026 | Fire-Resistance Rated Construction | CHAROULIS CHARALAMBOUS | progress |
| 05/15/2026 | Sprinkler Systems | CHAROULIS CHARALAMBOUS | special |
| 05/14/2026 | Final | CHAROULIS CHARALAMBOUS | progress |
| 05/14/2026 | Final | CHAROULIS CHARALAMBOUS | progress |