Two stories - detached, small or mid-size
95-33 72 AVENUE
QUEENS · BIN 4095448
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
1,412 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Permit Issued — active, not yet Signed-off
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction3p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/29/2025$949K—Private party → Private party$672/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS907/31/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.603/21/2026
GERALD J CALIENDO R A A I A603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TEKTON ENTERPRISE INCGeneral Contractor404/09/2026
HASAN A SALIMGeneral Contractor303/21/2026
C.R.U. MECHAN & HEAT INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323103/27/2026
AA BUILDING & INSPECTION1519207/02/2025
Building Lifecycle
All (50)Filed (9)Permit Issued (5)Inspection (6)Special Inspection (30)
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
08/19/2026
Special inspection requirement — Protection of exposed foundation insulation
William Alicea
08/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
William Alicea
08/19/2026
Special inspection requirement — Insulation placement and R values
William Alicea
08/19/2026
Special inspection requirement — Air barrier - visual inspection
William Alicea
08/19/2026
Special inspection requirement — Fenestration areas
William Alicea
08/19/2026
Special inspection requirement — Fenestration air leakage
William Alicea
08/19/2026
Special inspection requirement — Interior lighting power
William Alicea
08/19/2026
Special inspection requirement — Permanent certificate
William Alicea
08/19/2026
Special inspection requirement — Maintenance information
William Alicea
08/19/2026
Special inspection requirement — Metering
William Alicea
08/19/2026
Special inspection requirement — Electric vehicle service equipment requirements
William Alicea
08/19/2026
Special inspection requirement — Air barrier — testing
William Alicea
08/19/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
08/19/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
08/19/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
William Alicea
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Alicea
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/31/2026
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-P5
05/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-P4
04/14/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/01/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
04/01/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/27/2026
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-P2
03/13/2026
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-P1
03/10/2026
Special inspection requirement — Metering
William Alicea
03/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
William Alicea
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/27/2025
Permit issued — Plumbing
Q01209825-S1-PL
10/23/2025
Permit issued — Structural
Q01209825-S4-ST
10/21/2025
Permit issued — Earth Work
Q01209825-S3-FO
09/05/2025
Permit issued — General Construction
Q01209825-I1-GC
09/02/2025
Permit issued — Construction Fence
Q01209825-S2-FN
07/02/2025
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-S4
07/02/2025
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-S3
06/09/2025
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-S1
06/03/2025
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-S2
04/11/2025
Filed — Alteration CO
HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH ALT-CO GC Q01209825-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND FLOOR AS PER PLANS FILED HEREIN.
Q01209825-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedC.R.U. MECHAN & HEAT INC10/27/2025
DOB NOWStructuralPermit IssuedTEKTON ENTERPRISE INC10/23/2025
DOB NOWEarth WorkPermit IssuedTEKTON ENTERPRISE INC10/21/2025
DOB NOWGeneral ConstructionPermit IssuedTEKTON ENTERPRISE INC09/05/2025
DOB NOWConstruction FencePermit IssuedHASAN A SALIM09/02/2025
1 project · most recent 07/31/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/31/2026Permit IssuedC.R.U. MECHAN & HEAT INCGas, Water/Sanitary
1 project · most recent 10/22/2025
General Wiring
FiledStatusContractorScope
10/22/2025Permit IssuedBRUNI ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/19/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
08/19/2026Protection of exposed foundation insulationWilliam Aliceaenergy_progress
08/19/2026Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
08/19/2026Insulation placement and R valuesWilliam Aliceaenergy_progress
08/19/2026Air barrier - visual inspectionWilliam Aliceaenergy_progress
08/19/2026Fenestration areasWilliam Aliceaenergy_progress
08/19/2026Fenestration air leakageWilliam Aliceaenergy_progress
08/19/2026Interior lighting powerWilliam Aliceaenergy_progress
08/19/2026Permanent certificateWilliam Aliceaenergy_progress
08/19/2026Maintenance informationWilliam Aliceaenergy_progress
08/19/2026MeteringWilliam Aliceaenergy_progress
08/19/2026Electric vehicle service equipment requirementsWilliam Aliceaenergy_progress
08/19/2026Air barrier — testing William Aliceaenergy_progress
08/19/2026Maintenance informationYounes Abouyaalaenergy_progress
08/19/2026Permanent certificateYounes Abouyaalaenergy_progress
08/19/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
08/19/2026Exterior Insulation and Finish Systems (EIFS)William Aliceaspecial
08/19/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
08/19/2026Fire-Resistance Rated ConstructionWilliam Aliceaprogress
08/19/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/19/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/19/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/01/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/01/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/01/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
Latest 25 of 49.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/19/2026Q01209825-I1Request digital key ↗
08/19/2026Q01209825-P2Request digital key ↗
08/17/2026Q01209825-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01209825-P3Open ↗
08/13/2026Q01209825-P2Open ↗
08/13/2026Q01209825-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q01209825-S1Open ↗
09/02/2026Q01209825-S1Open ↗
09/02/2026Q01209825-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026Q01209825-I1Open ↗
08/17/2026Q01209825-S1Open ↗
08/17/2026Q01209825-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026Q01209825-P2Open ↗
08/27/2026Q01209825-P2Open ↗
08/27/2026Q01209825-S4Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/17/2026Q01209825-I1Open ↗
08/17/2026Q01209825-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01209825-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/17/2026Q01209825-S1Open ↗
08/17/2026Q01209825-P5Open ↗
08/17/2026Q01209825-P2Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01209825-I1Open ↗
08/17/2026Q01209825-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01209825-S3Open ↗