1920Year Built
2Stories
B2Building Class
R4AZoning
2,288 sfGross Floor Area
2Units
1 Active Violation ▸FDNY Report ↗
Two family frame · 2,742 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Under Construction5p · 1 filing · 6 docs
Floor 1Under Construction4p · 1 filing · 6 docs
CellarUnder Construction19p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Curtis Design Group203/05/2026
Associates611/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JS Architecture Design403/21/2026
AM Engineering Services1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dfe ContractorGeneral Contractor303/21/2026
WCK ElectricElectrical103/22/2026
Andate ConstructionGeneral Contractor107/08/2026
PFL MechanicalPlumbing107/10/2026
Signore & Sons PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Century Testing & Consulting4081103/05/2026
AM Engineering Services P7975311/09/2023
Building Lifecycle
All (84)Filed (8)Permit Issued (4)Signed Off (2)Violation (8)Inspection (7)Objection (48)Special Inspection (7)
09/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2026
Permit issued — Plumbing
Q01354678-S1-PL
05/28/2026
Permit issued — General Construction
Q01354678-I1-GC
04/17/2026
Objection resolved — Resolved
04/17/2026
Objection resolved — Resolved
04/17/2026
Objection resolved — Resolved
04/16/2026
Objection raised — Cost
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Plumbing
03/18/2026
Objection raised — Plumbing
03/18/2026
Objection raised — Plumbing
03/18/2026
Objection raised — Plumbing
03/18/2026
Objection raised — Other
03/18/2026
Objection raised — Plumbing
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Cost
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Other
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Admin
03/17/2026
Objection raised — Other
03/17/2026
Objection raised — Fire_Protection
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Structural
03/05/2026
Filed — Alteration
RENOVATE EXISTING TWO FAMILY DWELLING AS PER PLANS FILED: WORK ENTAILS REPLACEMENT OF FIRE DAMAGE PARTITIONS, DOORS , WINDOWS AND FINISHING
Q01354678-I1
03/05/2026
Filed — Alteration
RENOVATE EXISTING TWO FAMILY DWELLING AS PER PLANS FILED: WORK ENTAILS REPLACEMENT OF FIRE DAMAGE PARTITIONS, DOORS , WINDOWS AND FINISHING
Q01354678-S1
08/29/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/27/2023
Signed off — Alteration
APPLICATION FILED TO REMOVE NON-BEARING PARTITIONS AS SHOWN ON PLANS. PROPOSED CELLAR TO BE SED AS AN ACCESSORY AREA. CORRECT ECB VIOLATION # 39031341N. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00564675-I1
12/27/2023
Signed off — Alteration
APPLICATION FILED TO PROPOSE 3 PIECES BATH (TOILET, LAVATORY & SHOWER) AND LAUNDRY AREA (DRYER & WASHER). REMOVE, CAP & SEAL KITCHEN SINK & GAS RANGE AT CELLAR LEVEL. NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q00564709-I1
12/13/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/16/2023
Objection resolved — Addressed
11/15/2023
Objection raised — Admin
11/09/2023
Filed — Alteration
APPLICATION FILED TO REMOVE NON-BEARING PARTITIONS AS SHOWN ON PLANS. PROPOSED CELLAR TO BE SED AS AN ACCESSORY AREA. CORRECT ECB VIOLATION # 39031341N. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00564675-P2
11/09/2023
Filed — Alteration
APPLICATION FILED TO PROPOSE 3 PIECES BATH (TOILET, LAVATORY & SHOWER) AND LAUNDRY AREA (DRYER & WASHER). REMOVE, CAP & SEAL KITCHEN SINK & GAS RANGE AT CELLAR LEVEL. NO CHANGE OF USE, EGRESS OR OCCUPANCY
Q00564709-P1
11/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Albert Munoz
11/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPFL Mechanical07/09/2026
DOB NOWGeneral ConstructionPermit IssuedAndate Construction05/28/2026
DOB NOWPlumbingSigned-offSignore & Sons Plumbing07/20/2023
DOB NOWGeneral ConstructionSigned-offDfe Contractor04/17/2023
2 projects · most recent 03/05/2026
Water/Sanitary Gas
FiledStatusContractorScope
03/05/2026Permit IssuedAmw PlumbingWater/Sanitary
11/09/2023Signed-offSignore & Sons PlumbingGas, Water/Sanitary
3 projects · most recent 07/27/2026
General Wiring
FiledStatusContractorScope
07/27/2026Permit IssuedR.C.M. ElectricGeneral Wiring
10/28/2025CancelledCircuit City Electric2 meters
10/20/2023CompleteWCK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/06/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/21/2023Fire-Resistant Penetrations and Joints—special
11/07/2023Fire-Resistance Rated ConstructionAlbert Munozprogress
11/07/2023Fire-Resistant Penetrations and Joints—special
11/07/2023Fire-Resistant Penetrations and JointsAlbert Munozspecial
02/07/2023Fire-Resistant Penetrations and Joints—special
02/07/2023Fire-Resistance Rated Construction—progress
07/29/2021Fire-Resistant Penetrations and JointsAlbert Munozspecial
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00564675-P2Request digital key ↗
08/27/2026Q00564675-I1Request digital key ↗
08/27/2026Q00564675-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00564675-I1Open ↗
08/13/2026Q00564675-P2Open ↗
08/13/2026Q00564709-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00564675-P2Open ↗
08/27/2026Q00564675-I1Open ↗
08/27/2026Q00564675-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00564709-I1Open ↗
08/22/2026Q00564675-P2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026Q00564675-P2Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026Q00564675-P2Open ↗
08/27/2026Q00564675-I1Open ↗
08/27/2026Q00564675-P1Open ↗
Showing 3 of 8 on file for this type