← Back
Multi-story retail building (2+)
95-51 ROOSEVELT AVENUE
QUEENS · Jackson Heights · BIN 4036675
💬 Discuss this project
1925Year Built
2Stories
K2Building Class
R6AZoning
1,800 sfGross Floor Area
5Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: 95-51 ROOSEVELT AVENUE, LLC · 990 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 15p · 3 filings · 20 docs
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
95-51 ROOSEVELT AVENUE LL103/22/2026
CAROL'S CABANA, INC LA CA503/22/2026
KOKO CARGO EXPRESS INC403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING PC605/12/2023
MW PROFESSIONAL ENGINEERING, P.C.101/27/2023
HSU & ASSOCIATES605/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILD TEAM1203/21/2026
ALL CITY ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QBK PLUMBING & HTNG INCPlumbing307/08/2026
VILLAGE P & H NY INCFire Protection107/08/2026
GREAT ONE CONSTRUCTION LLGeneral Contractor107/08/2026
WINWAY DEVELOPMENT LLCGeneral Contractor107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL CITY ENGINEERING PC7115505/12/2023
JD ENGINEERING PC9859102/07/2023
MW PROFESSIONAL ENGINEERI570101/27/2023
B CHEN ARCHITECT PLLC1346109/15/2020
Building Lifecycle
All (65)Filed (13)Permit Issued (7)Signed Off (3)Violation (21)Inspection (4)Special Inspection (17)
09/08/2023
Signed off — Alteration
INSTALL NEW SMOKE DRAFT CURTAIN AS PER PLAN. IN CONJUNCTION WITH DOBNOW GC-Q00817190. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q00822858-I1
08/31/2023
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES AS PER PLAN. IN CONJUNCTION WITH DOBNOW GC-Q00817190. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q00822857-I1
07/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHAO DENG
05/12/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AS PER PLAN. IN CONJUNCTION WITH DOBNOW GC-Q00817190. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q00822857-P2
05/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHAO DENG
04/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/23/2023
Filed — Alteration
INSTALL NEW SMOKE DRAFT CURTAIN AS PER PLAN. IN CONJUNCTION WITH DOBNOW GC-Q00817190. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q00822858-P1
03/23/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AS PER PLAN. IN CONJUNCTION WITH DOBNOW GC-Q00817190. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q00822857-P1
03/23/2023
Special inspection requirement — Sprinkler Systems
ZHAO DENG
03/03/2023
Special inspection requirement — Sprinkler Systems
ZHAO DENG
02/15/2023
Permit issued — Sprinklers
Q00822858-I1-EW-SP
02/13/2023
Permit issued — Plumbing
Q00822857-I1-PL
02/08/2023
Permit issued — General Construction
Q00817190-I1-GC
02/07/2023
Filed — Alteration
INSTALL NEW SMOKE DRAFT CURTAIN AS PER PLAN. IN CONJUNCTION WITH DOBNOW GC-Q00817190. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q00822858-I1
02/07/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AS PER PLAN. IN CONJUNCTION WITH DOBNOW GC-Q00817190. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
Q00822857-I1
02/07/2023
Filed — Alteration
Install HVAC, install kitchen exhaust hood and ductwork in the existing kitchen
Q00822856-I1
02/07/2023
Special inspection requirement — Shutoff dampers
ZHAO DENG
02/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHAO DENG
02/07/2023
Special inspection requirement — Energy Code Compliance Inspections
ZHAO DENG
02/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
ZHAO DENG
02/07/2023
Special inspection requirement — Maintenance information
ZHAO DENG
02/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHAO DENG
02/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
ZHAO DENG
02/02/2023
Special inspection requirement — Mechanical Systems
ZHAO DENG
02/02/2023
Special inspection requirement — Final
ZHAO DENG
01/27/2023
Filed — Alteration
Q00817190-I1
08/09/2021
Signed off — Alteration
REPLACE 3 PIECES COMPARTMENT SINK AND HAND SINK ON THE FIRST FLOOR AND REPLACE 50 LB GREASE TRAP IN CELLAR, NEW INSTALLATION OF 4 COMMERICIAL COOKING EQUIPMENT AND RELOCATE ONE FIRE SUPRESSION SHUT OFF VALVE . NO CHANGE IN USE, OCCUPANCY AND EGRESSS
Q00394753-I1
05/13/2021
Filed — Alteration
REPLACE 3 PIECES COMPARTMENT SINK AND HAND SINK ON THE FIRST FLOOR AND REPLACE 50 LB GREASE TRAP IN CELLAR, NEW INSTALLATION OF 4 COMMERICIAL COOKING EQUIPMENT AND RELOCATE ONE FIRE SUPRESSION SHUT OFF VALVE . NO CHANGE IN USE, OCCUPANCY AND EGRESSS
Q00394753-P4
04/21/2021
Permit issued — Plumbing
Q00394753-I1-PL
03/25/2021
Permit issued — Plumbing
Q00394753-I1-PL
03/23/2021
Filed — Alteration
REPLACE 3 PIECES COMPARTMENT SINK AND HAND SINK ON THE FIRST FLOOR AND REPLACE 50 LB GREASE TRAP IN CELLAR, NEW INSTALLATION OF 4 COMMERICIAL COOKING EQUIPMENT AND RELOCATE ONE FIRE SUPRESSION SHUT OFF VALVE . NO CHANGE IN USE, OCCUPANCY AND EGRESSS
Q00394753-P3
01/25/2021
Filed — Alteration
REPLACE 3 PIECES COMPARTMENT SINK AND HAND SINK ON THE FIRST FLOOR AND REPLACE 50 LB GREASE TRAP IN CELLAR, NEW INSTALLATION OF 4 COMMERICIAL COOKING EQUIPMENT AND RELOCATE ONE FIRE SUPRESSION SHUT OFF VALVE . NO CHANGE IN USE, OCCUPANCY AND EGRESSS
Q00394753-P2
11/20/2020
Permit issued — Mechanical Systems
Q00399431-I1-MS
10/08/2020
Filed — Alteration
REPLACE 3 PIECES COMPARTMENT SINK AND HAND SINK ON THE FIRST FLOOR AND REPLACE 50 LB GREASE TRAP IN CELLAR, NEW INSTALLATION OF 4 COMMERICIAL COOKING EQUIPMENT AND RELOCATE ONE FIRE SUPRESSION SHUT OFF VALVE . NO CHANGE IN USE, OCCUPANCY AND EGRESSS
Q00394753-P1
09/29/2020
Permit issued — Plumbing
Q00394753-I1-PL
09/15/2020
Filed — Alteration
REPLACE 3 PIECES COMPARTMENT SINK AND HAND SINK ON THE FIRST FLOOR AND REPLACE 50 LB GREASE TRAP IN CELLAR, NEW INSTALLATION OF 4 COMMERICIAL COOKING EQUIPMENT AND RELOCATE ONE FIRE SUPRESSION SHUT OFF VALVE . NO CHANGE IN USE, OCCUPANCY AND EGRESSS
Q00394753-I1
09/15/2020
Filed — Alteration
REPLACE 2 SPLIT SYSTEM. 1 OUTDOOR CONDENSER IN REAR YARD & 2 INDOOR WALL MOUNT. CONJUNCTION WITH ALT-II JOB # 440622471. NO CHANGE IN USE, OCCUPANCY AND EGRESSS
Q00399431-I1
09/15/2020
Special inspection requirement — Mechanical Systems
billy chen
09/15/2020
Special inspection requirement — HVAC insulation and sealing
Chih Hsu
09/15/2020
Special inspection requirement — Duct leakage testing
Chih Hsu
09/15/2020
Special inspection requirement — Final
Chih Hsu
04/15/2013
Violation issued (ECB, closed)
Construction
02/28/2003
Violation issued (ECB, closed)
Quality of Life
02/18/2003
Violation issued (ECB, closed)
Signs
02/18/2003
Violation issued (ECB, closed)
Signs
02/18/2003
Violation issued (ECB, closed)
Signs
02/18/2003
Violation issued (ECB, closed)
Signs
02/18/2003
Violation issued (ECB, closed)
Signs
02/18/2003
Violation issued (ECB, closed)
Signs
02/18/2003
Violation issued (ECB, closed)
Signs
02/18/2003
Violation issued (ECB, closed)
Signs
02/18/2003
Violation issued (ECB, closed)
Signs
12/11/2002
Violation issued (ECB, closed)
Signs
12/11/2002
Violation issued (ECB, closed)
Signs
12/11/2002
Violation issued (ECB, closed)
Signs
12/11/2002
Violation issued (ECB, closed)
Signs
12/11/2002
Violation issued (ECB, closed)
Signs
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC02/15/2023
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC02/13/2023
DOB NOWGeneral ConstructionPermit IssuedGREAT ONE CONSTRUCTION LL02/08/2023
DOB NOWPlumbingSigned-offSILVER STAR PLBG & HTG IN04/21/2021
DOB NOWPlumbingSigned-offSILVER STAR PLBG & HTG IN03/25/2021
DOB NOWMechanical SystemsPermit IssuedWINWAY DEVELOPMENT LLC11/20/2020
DOB NOWPlumbingSigned-offSILVER STAR PLBG & HTG IN09/29/2020
BISOTISSUEDWINWAY DEVELOPMENT LLC11/09/2020
BISOTISSUEDWINWAY DEVELOPMENT LLC09/03/2020
BISMHISSUEDMARCO POLO DESIGN CORP11/12/2013
BISOTISSUEDMARCO POLO DESIGN CORP11/07/2013
BISOTISSUEDHANSOL SIGN ART CORP08/16/2011
BISFPISSUEDUNIQUE FIRE SYSTEMS INC06/27/2011
BISEQISSUEDK&K CONST MGMT GROUP INC06/16/2011
BISOTISSUEDK&K CONST MGMT GROUP INC06/16/2011
BISPLISSUEDARANDA PLBG & HTG CORP05/27/2011
BISOTISSUEDK&K CONST MGMT GROUP INC05/25/2011
BIS—ISSUEDNEW YORK SIGN CITY INC05/04/2005
2 projects · most recent 02/07/2023
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/07/2023——Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MUZ-GL24NA 22,400 BTU · Heat Pump Outdoor ×1
MXZ-3C24NA3 22,000 BTU · Heat Pump Outdoor ×1
PUZ-A36NKA7 36,000 BTU · Heat Pump Outdoor ×1
Ventilation
09/15/2020Permit IssuedWINWAY DEVELOPMENT LLCAir Conditioning Systems
Cooling
Kinghome KW36HQ2B8D 34,600 BTU · Split System ×2
KW36HQ2B4D 42,500 BTU ×1
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
05/15/2023Fire-Resistant Penetrations and JointsZHAO DENGspecial
05/11/2023Fire-Resistant Penetrations and JointsZHAO DENGspecial
03/23/2023Sprinkler SystemsZHAO DENGspecial
03/03/2023Sprinkler SystemsZHAO DENGspecial
02/07/2023Shutoff dampersZHAO DENGenergy_progress
02/07/2023Fire-Resistant Penetrations and JointsZHAO DENGspecial
02/07/2023Energy Code Compliance InspectionsZHAO DENGprogress
02/07/2023HVAC-R and service water heating system controlsZHAO DENGenergy_progress
02/07/2023Maintenance informationZHAO DENGenergy_progress
02/07/2023HVAC-R and service water piping design and insulationZHAO DENGenergy_progress
02/07/2023HVAC-R and service water heating equipmentZHAO DENGenergy_progress
02/02/2023Mechanical SystemsZHAO DENGspecial
02/02/2023FinalZHAO DENGprogress
09/15/2020Mechanical Systemsbilly chenspecial
09/15/2020HVAC insulation and sealing Chih Hsuenergy_progress
09/15/2020Duct leakage testing Chih Hsuenergy_progress
09/15/2020FinalChih Hsuprogress
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch7
08/25/2026Q00817190-I1Request digital key ↗
08/25/2026Q00822856-I1Request digital key ↗
08/25/2026Q00822858-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/27/2026Q00394753-P3Request digital key ↗
08/27/2026Q00394753-I1Request digital key ↗
08/15/2026Q00394753-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00399431-I1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION10
09/03/2020440622471Open ↗
12/05/2013420874343Open ↗
11/16/2013420874343Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/28/2020440622471Open ↗
08/03/2013420874343Open ↗
08/03/2013420357358Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00399431-I1Open ↗
08/27/2026Q00394753-P2Open ↗
08/27/2026Q00394753-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
07/22/2019420357358Open ↗
08/03/2013420874343Open ↗
03/29/2013420357358Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00822857-I1Open ↗
09/01/2026Q00822858-P1Open ↗
09/01/2026Q00822856-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
08/03/2013420874343Open ↗
07/22/2011420461556Open ↗
06/27/2011420371724Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
08/03/2013420874343Open ↗
07/22/2011420461556Open ↗
06/27/2011420371724Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00822856-I1Open ↗
09/01/2026Q00822856-I1Open ↗
08/26/2026Q00399431-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/28/2020440622471Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/28/2020440622471Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/28/2020440622471Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
08/01/2011420357358Open ↗
06/24/2011420357358Open ↗
▸BISSCHEDULE B - PLUMBING2
08/03/2013420874343Open ↗
05/23/2011420357358Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026Q00399431-I1Open ↗
08/27/2026Q00394753-I1Open ↗
08/27/2026Q00394753-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
07/22/2011420461556Open ↗
06/27/2011420371724Open ↗
06/14/2011420367285Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/28/2020440622471Open ↗
08/03/2013420874343Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY3
07/22/2011420461556Open ↗
06/14/2011420367285Open ↗
05/23/2011420357358Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/24/2019420357358Open ↗
08/03/2013420874343Open ↗
03/29/2013420367285Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
07/22/2019420357358Open ↗
07/16/2013420367285Open ↗
03/29/2013420357358Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/28/2020440622471Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/28/2020440622471Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/02/2020440622471Open ↗
▸Inspections & Test Reports3
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/02/2020440622471Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/02/2020440622471Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/28/2020440622471Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS5
08/03/2013420874343Open ↗
07/22/2011420461556Open ↗
06/27/2011420371724Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
07/16/2013420367285Open ↗
07/24/2019420357358Open ↗
▸BISFINAL1
09/02/2020440622471Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
08/28/2020440622471Open ↗
07/22/2019420357358Open ↗
08/15/2013420357358Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
08/03/2013420874343Open ↗
07/22/2011420461556Open ↗
06/27/2011420371724Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/28/2020440622471Open ↗
▸BISBOROUGH INTAKE FORM1
07/24/2019420357358Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
08/01/2011420357358Open ↗