← Back
BuildNYC
Parks / recreation facility
Columbus Park Pavilion
95 BAYARD STREET · Name © OpenStreetMap contributors · BIN 1079268
💬 Discuss this project
1935Year Built
1Stories
Q1Building Class
PARKZoning
3,183 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Parks / recreation facility · Owner of record: NYC Department of Parks and Recreation · 145,365 sf lot · 0.02 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCity of New York Parks & Recreation1 filing · 12 docs
Floor 1City of New York Parks & Recreation1 filing · 12 docs
Sub-BasementCity of New York Parks & Recreation1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Parks303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC Department of Parks and Recreation202/20/2026
NYC Parks Department110/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Department of Parks and Recreation603/21/2026
Building Lifecycle
All (28)Filed (3)Violation (2)Objection (14)Special Inspection (9)
09/08/2026
Objection resolved — Resolved
03/19/2026
Objection resolved — Addressed
03/17/2026
Objection raised — Other
03/12/2026
Objection resolved — Resolved
02/26/2026
Objection resolved — Resolved
02/23/2026
Objection raised — Energy
02/23/2026
Objection raised — Other
02/23/2026
Objection raised — Admin
02/20/2026
Filed — Alteration
INSTALLATION OF 3 NEW FLOOR DRAINS CONNECTED TO EXISTING STORM DRAIN SYSTEM.
M01308514-S2
02/05/2026
Filed — Alteration
INSTALLATION OF 3 NEW FLOOR DRAINS CONNECTED TO EXISTING STORM DRAIN SYSTEM.
M01308514-S1
01/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
01/26/2026
Special inspection requirement — Shutoff dampers
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/26/2026
Special inspection requirement — Maintenance information
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/22/2025
Special inspection requirement — Final
12/22/2025
Special inspection requirement — Mechanical Systems
11/12/2025
Objection raised — Fire_Protection
11/07/2025
Objection raised — Scope
11/07/2025
Objection raised — Scope
10/27/2025
Filed — Alteration
INSTALLATION OF 3 NEW FLOOR DRAINS CONNECTED TO EXISTING STORM DRAIN SYSTEM.
M01308514-I1
02/27/2013
Violation issued (FDNY_ORDER, closed)
10/17/2006
Violation issued (FDNY_ORDER, closed)
Nothing on file for this building.
1 project · most recent 02/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/20/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MODEL NTXWPH15B112AA 14,000 BTU · Fan Coil Indoor ×4
MODEL NTXMPH48A182BA 48,000 BTU · Vrf Indoor ×1
Ventilation
Renewaire RENEWAIRE HE 05IN 375 CFM · Ahu ×1
1 project · most recent 02/20/2026
Storm
FiledStatusContractorScope
02/20/2026——Storm
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/26/2026Duct leakage testing, insulation and design—energy_progress
01/26/2026Shutoff dampers—energy_progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026Energy Code Compliance Inspections—progress
01/26/2026HVAC-R and service water heating system controls—energy_progress
01/26/2026HVAC-R and service water heating equipment—energy_progress
01/26/2026Maintenance information—energy_progress
12/22/2025Final—progress
12/22/2025Mechanical Systems—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
City of New York Parks & RecreationGovernment / CivicSub-basement, Floor 1, Roof
Project M01308514 Alteration · Objections · 10/27/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/15/2026M01308514-I1Request digital key ↗
08/15/2026M01308514-S2Request digital key ↗
08/15/2026M01308514-S1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026M01308514-I1Open ↗
08/21/2026M01308514-S2Open ↗
08/21/2026M01308514-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026M01308514-I1Open ↗
08/15/2026M01308514-S2Open ↗
08/15/2026M01308514-S1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/15/2026M01308514-I1Open ↗
08/15/2026M01308514-S2Open ↗
08/15/2026M01308514-S1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026M01308514-S1Open ↗
08/13/2026M01308514-I1Open ↗
08/13/2026M01308514-S2Open ↗