← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
President Condominium
95 GREENE STREET · BIN 1007673
💬 Discuss this project
1881Year Built
6Stories
RMBuilding Class
M1-5/R7XZoning
46,055 sfGross Floor Area
30Units
LL97 CoveredRent Stabilized3 Active Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Greene House Condominium · 10,000 sf lot · 4.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofJordan Cooper, ChloeUnder Construction133p · 18 filings · 20 docs
BulkheadCranes and derricks work1p · 1 filing · 3 docs
PenthouseUnit PH, Unit PHAUnder Construction105p · 10 filings · 20 docs
Floor 6ChloeUnder Construction142p · 15 filings · 20 docs
Floor 5ChloeUnder Construction14p · 2 filings · 13 docs
Floor 4Jordan Cooper, Chloe, Unit 4AUnder Construction25p · 3 filings · 20 docs
Floor 3Chloe, Unit 3DUnder Construction23p · 3 filings · 20 docs
Floor 2ChloeUnder Construction14p · 2 filings · 13 docs
Floor 1Chloe, TIFFANY & Co.Under Construction15p · 3 filings · 20 docs
MezzaninePlumbing work on 6th floor, penthouse, and roofUnder Construction91p · 6 filings · 20 docs
CellarChloe, TIFFANY & Co.Under Construction30p · 4 filings · 20 docs
Site & exteriorGreenhouse Condominium14p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Soho Centrale7103/21/2026
Jordan Cooper & Associates2810/16/2026
95 Greene Street Condominium1803/21/2026
President Condominium Board503/21/2026
Stuyvesant Owners203/21/2026
Little Ann LLC C/O Jordan Cooper203/21/2026
Condominium Board103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eric Safyan Architect506/05/2026
The Rajiv205/13/2026
Arpad Baksa Architect904/21/2025
CES Engineering804/21/2025
Tohfaz Uddin PE211/01/2024
Gilsanz Murray Steficek307/12/2024
Patuxent Engineering411/21/2023
R & S Associates211/10/2023
Ashraf111/09/2023
WPM NY Engineers509/29/2023
GC Engineering & Associates601/13/2023
B2B Associates107/08/2022
The Eipel Engineering Group111/03/2021
DS&F Architect111/02/2021
Jag Engineering104/08/2021
Howard L Zimmerman Arch & Engineering103/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arpad Baksa Architect3603/21/2026
Spring Scaffolding403/21/2026
Archetype Consultants403/21/2026
Custodio Consulting403/21/2026
Patuxent Engineering803/21/2026
Hlzae103/21/2026
Green Studio203/21/2026
Richard Wainer Architect203/21/2026
Hierarch-E203/21/2026
Rigging Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Toka HomeGeneral Contractor4407/08/2026
Platinum Services NYScaffold603/21/2026
Saber Steelspecialty_contractor603/21/2026
Urban IntelligenceScaffold603/21/2026
Dynamic Sheet Metalspecialty_contractor507/08/2026
Henry Myers P & HPlumbing507/08/2026
Interior ManagementGeneral Contractor507/08/2026
Spring ScaffoldingScaffold407/08/2026
Buckmiller Automatic SprinklerFire Protection407/08/2026
Rockall ConstructionGeneral Contractor403/21/2026
TumenGeneral Contractor310/16/2026
GWT EnterprisesScaffold303/21/2026
Manhattan D EnterprisesScaffold303/21/2026
Allstate SprinklerFire Protection307/08/2026
Pyramid Restoration NYspecialty_contractor207/08/2026
Park East DevelopmentGeneral Contractor203/21/2026
Ferko Plumbing & HeatingPlumbing107/08/2026
Absolute Comfort SolutionGeneral Contractor107/08/2026
Electric EssentialsElectrical103/21/2026
L.J.F. Electric CoElectrical103/21/2026
Amn PlumbingPlumbing107/31/2026
Best Plumbing & HVACPlumbing107/08/2026
Inter Connection ElectricElectrical103/22/2026
TMG ConstructionGeneral Contractor107/08/2026
Yafe MeodGeneral Contractor107/08/2026
Arred Electrical ContractingElectrical103/21/2026
Demar MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eric Safyan Architectpc3248506/05/2026
The Rajiv9613104/06/2026
CES Engineering1277804/21/2025
Gilsanz Murray Steficek240604/21/2025
Domani Inspection Service843504/21/2025
Comply Building Group8622211/10/2023
WPM NY Engineers8597209/29/2023
Ace Structural Engineering496308/21/2023
WPM Engineering7809208/21/2023
GC Engineering & Associates1796301/13/2023
B2 Engineering5433107/08/2022
The Eipel Engineering Group2714111/03/2021
Howard L Zimmerman Architects1712103/29/2021
Building Lifecycle
All (300)Filed (56)Permit Issued (71)Signed Off (12)Violation (31)Inspection (20)Objection (80)Special Inspection (30)
10/15/2026
Permit issued — Mechanical Systems
M01035561-S2-MS
07/30/2026
Signed off — Alteration
Installation of RPZ Backflow Preventer, DCDA Double Check Detector Assembly, Sump Pump, Floor Drains and associated piping in the cellar as per plans filed. No change to use, egress or occupancy is involved.
M00939052-I1
07/23/2026
Permit issued — Plumbing
M01378836-S1-PL
07/14/2026
Objection resolved — Addressed
06/25/2026
Permit issued — Plumbing
M00770753-I1-PL
06/25/2026
Violation issued (HPD, open)
C
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Safyan
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Cost
06/11/2026
Objection raised — Scope
06/10/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (HPD, closed)
C
06/08/2026
Filed — Alteration
Facade Inspection for AC lines
M01411295-I1
06/05/2026
Filed — Alteration
SUBSEQUENT MECHANICAL WORK , HVAC MIN-SPIT ELECTRICAL SYSTEM, IN CONJUCTION WITH RENOVATION OF APT 4A. NO CHANGE TO USE EGRESS OR COOCUPANCY.
M01035561-P3
06/05/2026
Filed — Alteration
SUBSEQUENT MECHANICAL WORK , HVAC MIN-SPIT ELECTRICAL SYSTEM, IN CONJUCTION WITH RENOVATION OF APT 4A. NO CHANGE TO USE EGRESS OR COOCUPANCY.
M01035561-P2
05/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/19/2026
Permit issued — General Construction
M01378836-I1-GC
05/18/2026
Special inspection requirement — Final
Eric Safyan
05/18/2026
Special inspection requirement — Mechanical Systems
Eric Safyan
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
05/14/2026
Signed off — Alteration
Suspended Scaffold for Exterior Work
M01377584-I1
05/14/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/13/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3RD FL APARTMENT (UNIT 3D). NON-STRUCTURAL PARTITION WORK, KITCHEN & BATH RENOVATIONS, NEW LIGHTING, MISC. MILLWORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01378836-S1
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Objection resolved — Addressed
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Rajiv Fernandez
05/01/2026
Objection raised — Other
05/01/2026
Objection raised — Inspections
05/01/2026
Objection raised — Accessibility
05/01/2026
Objection raised — Admin
05/01/2026
Objection raised — Scope
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Safyan
04/20/2026
Permit issued — Mechanical Systems
M00953240-I1-MS
04/06/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3RD FL APARTMENT (UNIT 3D). NON-STRUCTURAL PARTITION WORK, KITCHEN & BATH RENOVATIONS, NEW LIGHTING, MISC. MILLWORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01378836-I1
04/03/2026
Permit issued — General Construction
M07997601-S1-GC
04/03/2026
Permit issued — Mechanical Systems
M00770708-I1-MS
04/02/2026
Permit issued — Suspended Scaffold
M01377584-I1-SC
04/02/2026
Permit issued — Structural
M08012479-I1-ST
04/01/2026
Permit issued — General Construction
M00537347-I1-GC
04/01/2026
Permit issued — General Construction
M00755524-I1-GC
03/30/2026
Filed — Alteration
Suspended Scaffold for Exterior Work
M01377584-I1
03/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2026
Special inspection requirement — Final
Rajiv Fernandez
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajiv Fernandez
03/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2026
Permit issued — General Construction
M01035561-I1-GC
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2025
Signed off — Alteration
ISOLATED FACADE REPAIR ON THE WEST & SOUTH FACADE & RAILING INSTALL. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00466133-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTumen10/15/2026
DOB NOWPlumbingPermit IssuedAmn Plumbing07/23/2026
DOB NOWPlumbingSigned-offHenry Myers P & H06/25/2026
DOB NOWGeneral ConstructionPermit IssuedTMG Construction05/19/2026
DOB NOWMechanical SystemsPermit IssuedDynamic Sheet Metal04/20/2026
DOB NOWGeneral ConstructionPermit IssuedToka Home04/03/2026
DOB NOWMechanical SystemsPermit IssuedToka Home04/03/2026
DOB NOWSuspended ScaffoldSigned-offSPD Construction04/02/2026
DOB NOWStructuralPermit IssuedToka Home04/02/2026
DOB NOWGeneral ConstructionPermit IssuedToka Home04/01/2026
DOB NOWGeneral ConstructionPermit IssuedToka Home04/01/2026
DOB NOWGeneral ConstructionPermit IssuedTumen02/25/2026
DOB NOWStructuralPermit IssuedToka Home09/24/2025
DOB NOWGeneral ConstructionPermit IssuedToka Home09/24/2025
DOB NOWPlumbingSigned-offDemar Mechanical09/11/2025
DOB NOWSuspended ScaffoldSigned-offSPD Construction04/09/2025
DOB NOWSprinklersPermit IssuedBuckmiller Automatic Sprinkler04/03/2025
DOB NOWGeneral ConstructionPermit IssuedToka Home03/18/2025
DOB NOWMechanical SystemsPermit IssuedToka Home03/14/2025
DOB NOWGeneral ConstructionPermit IssuedToka Home03/14/2025
DOB NOWMechanical SystemsPermit IssuedDynamic Sheet Metal03/11/2025
DOB NOWPlumbingSigned-offHenry Myers P & H03/04/2025
DOB NOWMechanical SystemsPermit IssuedToka Home03/03/2025
DOB NOWGeneral ConstructionPermit IssuedToka Home02/28/2025
DOB NOWGeneral ConstructionPermit IssuedToka Home02/28/2025
DOB NOWPlumbingSigned-offBest Plumbing & HVAC12/09/2024
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY11/08/2024
DOB NOWConstruction FenceSigned-offSpring Scaffolding11/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding11/01/2024
DOB NOWGeneral ConstructionPermit IssuedTumen10/15/2024
DOB NOWGeneral ConstructionPermit IssuedToka Home10/07/2024
DOB NOWStructuralPermit IssuedToka Home09/16/2024
DOB NOWMechanical SystemsPermit IssuedToka Home09/16/2024
DOB NOWGeneral ConstructionPermit IssuedToka Home09/16/2024
DOB NOWGeneral ConstructionPermit IssuedToka Home09/16/2024
DOB NOWMechanical SystemsPermit IssuedDynamic Sheet Metal08/28/2024
DOB NOWSprinklersSigned-offAllstate Sprinkler08/07/2024
DOB NOWGeneral ConstructionSigned-offPyramid Restoration NY06/11/2024
DOB NOWGeneral ConstructionPermit IssuedToka Home04/18/2024
DOB NOWSprinklersPermit IssuedBuckmiller Automatic Sprinkler03/26/2024
+ 60 more permits on file
3 projects · most recent 06/05/2026
Heating and Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2026Permit IssuedTumenHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEAD-A12AA7 12,000 BTU · Vrf Indoor ×1
PEAD-A24AA7 24,000 BTU · Vrf Indoor ×1
PUZ-A36NKA7 36,000 BTU · Heat Pump Outdoor ×1
04/21/2025Permit IssuedToka HomeAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXMQ12PBVJU 12,000 BTU · Vrf Indoor ×8
FXMQ15PBVJU 142,000 BTU · Vrf Indoor ×4
FXMQ18PBVJU 18,000 BTU · Vrf Indoor ×4
FXMQ24MVJU9 24,000 BTU · Vrf Indoor ×4
2MXL18QMVJU 18,000 BTU · Heat Pump Outdoor ×2
CTXS07LVJU 7,000 BTU · Fan Coil Indoor ×2
FXMQ36PBVJU 36,000 BTU · Vrf Indoor ×2
FXMQ48PBVJU 48,000 BTU · Vrf Indoor ×2
FXTQ09TAVJUD 9,500 BTU · Vrf Indoor ×2
FXTQ48TAVJUD 48,000 BTU · Vrf Indoor ×2
REYQ144XATJA 144,000 BTU · Vrf Outdoor ×2
REYQ168XATJA 168,000 BTU · Vrf Outdoor ×2
Trane WHC060H3RGA 61,050 BTU · Rooftop Unit ×1
Captiveaire CAS-HVAC2-I.200-15-10T 2,000 CFM · Rooftop Unit ×1
Ventilation
Lifebreathe METRO 120ERVD 129 CFM · Erv ×2
11/10/2023Permit IssuedDynamic Sheet MetalHeating and Air Conditioning Systems
Heat / Cool
1 project · most recent 08/02/2024
FiledStatusContractorScope
08/02/2024Permit IssuedBuckmiller Automatic Sprinkler89 heads
6 projects · most recent 06/05/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/05/2026Signed-offBest Plumbing & HVACGas, Water/Sanitary
05/13/2026Permit IssuedAmn PlumbingGas, Water/Sanitary
04/21/2025Signed-offHenry Myers Plumbing & HeatingGas, Storm, Water/Sanitary
10/17/2023Signed-offDemar MechanicalWater/Sanitary
12/20/2022Permit IssuedFerko Plumbing & HeatingGas, Storm, Water/Sanitary
06/02/2022Signed-offHenry Myers P & HWater/Sanitary
13 projects · most recent 09/29/2026
General Wiring Lighting
FiledStatusContractorScope
09/29/2026Permit IssuedWarren Ostroff Electric1 meters, 1 new_meters
02/25/2026CompletePower Surge ElectricGeneral Wiring
03/18/2025Permit IssuedA.X.M. ElectricGeneral Wiring
11/29/2023Permit IssuedC.falco Eletl ContGeneral Wiring
11/17/2023CompleteWarren Ostroff Electric—
11/17/2023CompleteWarren Ostroff ElectricGeneral Wiring
01/06/2023Complete5 J'S Electl Conts—
10/17/2021Complete5 J'S Electl Conts—
11/25/2020Permit IssuedAgir Electl SolutionGeneral Wiring
03/13/2020CompleteInfinity ElectricGeneral Wiring
03/12/2020CancelledInfinity ElectricGeneral Wiring
01/09/2020Permit IssuedOmd ElectricalLighting
02/05/2018CompleteInter Connection Electric—
5 projects · most recent 05/13/2026
Steel Masonry
FiledStatusContractorScope
05/13/2026Permit IssuedAmn Plumbing1 scope_items
07/12/2024Permit IssuedToka HomeSteel
09/29/2023Permit IssuedYafe Meod2 scope_items
08/21/2023Permit IssuedRockall ConstructionSteel, Masonry
11/03/2021——Steel
1 project · most recent 11/09/2023
Scaffold
FiledStatusContractorScope
11/09/2023Permit IssuedPlatinum Services NYScaffold
2 projects · most recent 06/08/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/08/2026———
03/30/2026Signed-offSPD ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
05/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/14/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/26/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
06/12/2026Fire-Resistant Penetrations and JointsEric Safyanspecial
05/18/2026Mechanical SystemsEric Safyanspecial
05/18/2026Energy Code Compliance InspectionsEric Safyanprogress
05/18/2026FinalEric Safyanprogress
05/04/2026Fire-Resistance Rated ConstructionRajiv Fernandezprogress
04/28/2026Fire-Resistant Penetrations and JointsEric Safyanspecial
03/26/2026FinalRajiv Fernandezprogress
03/26/2026Fire-Resistant Penetrations and JointsRajiv Fernandezspecial
06/23/2025Fire-Resistant Penetrations and JointsDelbert Smithspecial
05/01/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/01/2025FinalArpad Baksaprogress
05/01/2025Structural Stability – Alterations of existing buildingsPhilip Murrayspecial
04/28/2025Fire-Resistant Penetrations and JointsDelbert Smithspecial
04/28/2025Mechanical SystemsDelbert Smithspecial
04/28/2025Energy Code Compliance InspectionsPeter Vottoprogress
04/28/2025FinalPeter Vottoprogress
04/28/2025Heating SystemsDelbert Smithspecial
04/01/2025Fire-Resistant Penetrations and JointsDelbert Smithspecial
04/01/2025Fire-Resistant Penetrations and JointsDelbert Smithspecial
04/01/2025FinalPeter Vottoprogress
04/01/2025Energy Code Compliance InspectionsPeter Vottoprogress
04/01/2025Mechanical SystemsDelbert Smithspecial
04/01/2025Heating SystemsDelbert Smithspecial
01/27/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/27/2025FinalArpad Baksaprogress
Latest 25 of 100.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Jordan CooperResidentialFloor 4, Roof
Project M01035561 Alteration · Permit Entire · 04/15/2024
ChloeRetailCellar, Floors 1–6, Roof
Project M00953240 Alteration · Permit Entire · 11/10/2023
TIFFANY & CoRetailCellar, Floor 1
Project M00939052 Alteration · LOC Issued · 10/17/2023
Project M00582222 Alteration · Approved · 11/03/2021
Project M00579089 Alteration · Approved · 11/02/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,167 on file (BIS + DOB NOW)
▸Plans & Drawings55
▸DOB NOWPlans/Sketch47
09/03/2026M00579089-I1Request digital key ↗
09/03/2026M00582222-I1Request digital key ↗
09/03/2026M00611550-P1Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026M00267894-P1Request digital key ↗
09/01/2026M00267894-P2Request digital key ↗
09/01/2026M00267894-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026M00268006-P1Request digital key ↗
09/01/2026M00268006-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00466133-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/03/2026M00268087-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/03/2026M00268027-I1Request digital key ↗
▸Applications & Permits232
▸BISPLAN / WORK APPROVAL APPLICATION106
11/17/2025103608026Open ↗
11/13/2023103926058Open ↗
11/13/2023103926049Open ↗
Showing 3 of 106 on file for this type
▸BISWORK PERMIT APPLICATION82
12/13/2021141006462Open ↗
12/03/2020123497778Open ↗
10/27/2020140947572Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWLPC Approval/Permit42
09/03/2026M00466133-I1Open ↗
09/03/2026M00582222-I1Open ↗
09/02/2026M00745227-I1Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications305
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION111
12/03/2020123497778Open ↗
10/05/2020123497778Open ↗
01/02/2020123737956Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature55
09/28/2026M01035561-S1Open ↗
09/02/2026M00770708-P2Open ↗
09/02/2026M00770753-P2Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature52
09/03/2026M00466133-I1Open ↗
09/03/2026M00582222-I1Open ↗
09/03/2026M00611550-I1Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/02/2026M00770708-P2Open ↗
09/02/2026M00770708-P2Open ↗
09/01/2026M00268087-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
10/05/2020123497778Open ↗
04/19/2019123737956Open ↗
Showing 2 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
12/06/2021141006462Open ↗
10/05/2020123497778Open ↗
04/19/2019123737956Open ↗
Showing 3 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/06/2021141006462Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/06/2021141006462Open ↗
Showing 1 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment70
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
11/26/2019122915809Open ↗
04/19/2019123737956Open ↗
06/04/2018123236729Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
11/23/2020123101730Open ↗
07/27/2017120987003Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
10/27/2021123236729Open ↗
10/27/2021123236729Open ↗
Showing 2 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection24
▸BISTenant Protection Plan and Notes12
10/05/2020123497778Open ↗
09/29/2020140947572Open ↗
04/19/2019123737956Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan7
09/01/2026M00268006-I1Open ↗
Showing 1 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
08/26/2026M07997601-S1Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos88
▸DOB NOWDEP ACP-5: Asbestos Assessment Report44
09/03/2026M00582222-I1Open ↗
09/02/2026M00537347-I1Open ↗
09/02/2026M00537347-P1Open ↗
Showing 3 of 44 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)23
10/05/2020123497778Open ↗
09/20/2020140947572Open ↗
04/19/2019123737956Open ↗
Showing 3 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
01/02/2020123737956Open ↗
04/19/2019123737956Open ↗
12/14/2017122861545Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
12/16/2021140947572Open ↗
12/15/2021140947572Open ↗
04/07/2021121677738Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/16/2021140947572Open ↗
12/15/2021140947572Open ↗
03/26/2021121677738Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
10/05/2020123497778Open ↗
06/04/2018123236729Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY18
12/16/2021140947572Open ↗
12/06/2021141006462Open ↗
10/25/2021123236729Open ↗
Showing 3 of 18 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/20/2024123497778Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/13/2021141006462Open ↗
▸Approvals, Objections & Sign-offs104
▸BISLANDMARKS APPROVAL40
12/06/2021141006462Open ↗
10/05/2020123497778Open ↗
10/05/2020123497778Open ↗
Showing 3 of 40 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
11/14/2024123497778Open ↗
12/17/2021140947572Open ↗
10/25/2021123236729Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/02/2020123737956Open ↗
Showing 1 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
10/04/2024123497778Open ↗
12/15/2021140947572Open ↗
10/25/2021123236729Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPRVD FAB CERT-INTENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
07/22/2021123888105Open ↗
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership82
▸BISCOST AFFIDAVIT75
12/06/2021141006462Open ↗
10/25/2021123236729Open ↗
04/07/2021121677738Open ↗
Showing 3 of 75 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/14/2024123497778Open ↗
12/15/2021140947572Open ↗
▸Filing & Intake Forms111
▸BISADDITIONAL INFORMATION48
04/21/2022123888105Open ↗
01/11/2022123888105Open ↗
12/06/2021141006462Open ↗
Showing 3 of 48 on file for this type
▸BISEFILING COVER SHEET44
07/22/2021123888105Open ↗
10/05/2020123497778Open ↗
04/19/2019123737956Open ↗
Showing 3 of 44 on file for this type
▸BISBOROUGH INTAKE FORM13
01/02/2020123737956Open ↗
12/30/2019123737956Open ↗
11/26/2019122915809Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
12/06/2021141006462Open ↗
09/20/2020140947572Open ↗
Showing 2 of 6 on file for this type
▸Other Documents34
▸DOB NOWProof of Historic Building15
09/02/2026M00745227-I1Open ↗
08/28/2026M00755524-P2Open ↗
08/28/2026M00755524-P1Open ↗
Showing 3 of 15 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
01/11/2022123888105Open ↗
10/31/2017123077525Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWCalculations3
08/18/2026M01377584-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
08/18/2026M01377584-I1Open ↗
Showing 1 of 3 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type