Miscellaneous two family
95 MONROE STREET
BROOKLYN · BIN 3057029
💬 Discuss this project
1899Year Built
2Stories
B9Building Class
R6BZoning
1,995 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · Owner of record: BEDSTUY GROUP CAPITAL LLC · 1,770 sf lot · 1.13 FAR built · Flood zone X
Locations of Work
Architecture
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
Basement7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN B COMPANY GROUP507/08/2026
420 EAST 75 STREET907/08/2026
1310 MYRTLE404/09/2026
OWNER OF 95 MONROE STREET103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2026$2.8M—— → —$1,404/sf building
07/16/2024$1.3M—Private party → BEDSTUY GROUP CAPITAL LLC$672/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION512/09/2025
THOMAS C. TUNG, P.E.210/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AB PLUS R CONSTRUCTION INGeneral Contractor207/08/2026
IK MGNT LLCGeneral Contractor104/09/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON7555112/09/2025
D&E BUILD EVERGREEN I9342210/29/2025
Building Lifecycle
All (61)Filed (7)Permit Issued (4)Signed Off (4)Violation (1)Inspection (7)Objection (8)Special Inspection (30)
05/04/2026
Signed off — Alteration CO
MECHANICAL WORK FOR THREE STORY, 2-FAMILY RESIDENTIAL BUILDING AND CELLAR IN CONJUCTION TO JOB# B01046929.
B01046929-I1
12/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2025
Signed off — Alteration CO
MECHANICAL WORK FOR THREE STORY, 2-FAMILY RESIDENTIAL BUILDING AND CELLAR IN CONJUCTION TO JOB# B01046929.
B01046929-S1
12/12/2025
Permit issued — Mechanical Systems
B01046929-S1-MS
12/09/2025
Filed — Alteration CO
MECHANICAL WORK FOR THREE STORY, 2-FAMILY RESIDENTIAL BUILDING AND CELLAR IN CONJUCTION TO JOB# B01046929.
B01046929-S1
12/09/2025
Signed off — Alteration CO
MECHANICAL WORK FOR THREE STORY, 2-FAMILY RESIDENTIAL BUILDING AND CELLAR IN CONJUCTION TO JOB# B01046929.
B01046929-S2
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
12/08/2025
Special inspection requirement — Maintenance information
CALVIN TRAN
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
11/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/12/2025
Special inspection requirement — Insulation placement and R values
THOMAS TUNG
11/12/2025
Special inspection requirement — Metering
THOMAS TUNG
11/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS TUNG
11/12/2025
Special inspection requirement — Interior lighting power
THOMAS TUNG
11/12/2025
Special inspection requirement — Fenestration areas
THOMAS TUNG
11/12/2025
Special inspection requirement — Air barrier - visual inspection
THOMAS TUNG
11/12/2025
Special inspection requirement — Permanent certificate
THOMAS TUNG
11/12/2025
Special inspection requirement — Fenestration air leakage
THOMAS TUNG
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
11/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
11/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
THOMAS TUNG
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
10/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2025
Filed — Alteration CO
MECHANICAL WORK FOR THREE STORY, 2-FAMILY RESIDENTIAL BUILDING AND CELLAR IN CONJUCTION TO JOB# B01046929.
B01046929-P1
10/15/2025
Special inspection requirement — Fenestration areas
THOMAS TUNG
10/15/2025
Special inspection requirement — Permanent certificate
THOMAS TUNG
10/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS TUNG
10/15/2025
Special inspection requirement — Fenestration air leakage
THOMAS TUNG
10/15/2025
Special inspection requirement — Insulation placement and R values
THOMAS TUNG
10/15/2025
Special inspection requirement — Interior lighting power
THOMAS TUNG
10/15/2025
Special inspection requirement — Metering
THOMAS TUNG
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
10/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
10/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
THOMAS TUNG
10/15/2025
Special inspection requirement — Air barrier - visual inspection
THOMAS TUNG
09/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/20/2025
Signed off — Alteration
B01097515-I1
03/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/14/2025
Permit issued — Plumbing
B01046929-S2-PL
01/16/2025
Permit issued — General Construction
B01046929-I1-GC
12/31/2024
Filed — Alteration CO
MECHANICAL WORK FOR THREE STORY, 2-FAMILY RESIDENTIAL BUILDING AND CELLAR IN CONJUCTION TO JOB# B01046929.
B01046929-S2
12/31/2024
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
12/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
12/24/2024
Objection resolved — Addressed
12/24/2024
Objection resolved — Addressed
11/15/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
10/30/2024
Objection raised — Zoning
10/30/2024
Objection raised — Zoning
10/30/2024
Objection raised — Zoning
10/30/2024
Objection raised — Zoning
10/23/2024
Filed — Alteration CO
MECHANICAL WORK FOR THREE STORY, 2-FAMILY RESIDENTIAL BUILDING AND CELLAR IN CONJUCTION TO JOB# B01046929.
B01046929-I1
10/11/2024
Filed — Alteration
INTERIOR DEMOLITION ON EXISTING THREE (3) STORY, TWO (2) FAMILY RESIDENTIAL BUILDING. NO EXTERIOR WORK, NO CHANGE OF BUILDING BULK, OCCUPANCY OR EGRESS
B01084833-P1
08/26/2024
Permit issued — Construction Fence
B01097515-I1-FN
08/19/2024
Filed — Alteration
B01097515-I1
08/12/2024
Filed — Alteration
INTERIOR DEMOLITION ON EXISTING THREE (3) STORY, TWO (2) FAMILY RESIDENTIAL BUILDING. NO EXTERIOR WORK, NO CHANGE OF BUILDING BULK, OCCUPANCY OR EGRESS
B01084833-I1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offIK MGNT LLC12/12/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC02/14/2025
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN01/16/2025
DOB NOWConstruction FenceSigned-offAB PLUS R CONSTRUCTION IN08/26/2024
1 project · most recent 12/09/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/09/2025Signed-offIK MGNT LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Samsung AM036TXMDCH 38,000 BTU · Vrf Indoor ×3
Heating
Samsung AM012TNVDCH 13,500 BTU · Vrf Indoor ×6
AM009TNVDCH 10,000 BTU · Vrf Indoor ×2
Ventilation
Greenheck TEF-A 50 CFM · Exhaust Fan ×3
KEF-A 100 CFM · Kitchen Exhaust ×2
1 project · most recent 12/09/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/09/2025Signed-offALL PRO PLBG & HTG INCGas, Water/Sanitary
2 projects · most recent 12/12/2025
General Wiring
FiledStatusContractorScope
12/12/2025CompletePOWER SURGE ELECTRIC, INC3 meters, 1 new_meters
09/04/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/08/2025HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
12/08/2025Maintenance informationCALVIN TRANenergy_progress
12/08/2025HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
12/08/2025HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
11/12/2025Insulation placement and R valuesTHOMAS TUNGenergy_progress
11/12/2025MeteringTHOMAS TUNGenergy_progress
11/12/2025Fenestration and door U-factor and product ratingsTHOMAS TUNGenergy_progress
11/12/2025Interior lighting powerTHOMAS TUNGenergy_progress
11/12/2025Fenestration areasTHOMAS TUNGenergy_progress
11/12/2025Air barrier - visual inspectionTHOMAS TUNGenergy_progress
11/12/2025Permanent certificateTHOMAS TUNGenergy_progress
11/12/2025Fenestration air leakageTHOMAS TUNGenergy_progress
11/12/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
11/12/2025Structural Stability – Alterations of existing buildingsDanny Chenspecial
11/12/2025Fire-Resistance Rated ConstructionTHOMAS TUNGprogress
11/12/2025Energy Code Compliance InspectionsTHOMAS TUNGprogress
10/15/2025Fenestration areasTHOMAS TUNGenergy_progress
10/15/2025Permanent certificateTHOMAS TUNGenergy_progress
10/15/2025Fenestration and door U-factor and product ratingsTHOMAS TUNGenergy_progress
10/15/2025Fenestration air leakageTHOMAS TUNGenergy_progress
10/15/2025Insulation placement and R valuesTHOMAS TUNGenergy_progress
10/15/2025Interior lighting powerTHOMAS TUNGenergy_progress
10/15/2025MeteringTHOMAS TUNGenergy_progress
10/15/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
10/15/2025Structural Stability – Alterations of existing buildingsDanny Chenspecial
Latest 25 of 34.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026B01084833-P1Request digital key ↗
08/24/2026B01084833-I1Request digital key ↗
08/24/2026B01097515-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01046929-P1Open ↗
08/13/2026B01046929-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01046929-I1Open ↗
08/13/2026B01046929-P1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B01046929-S2Open ↗
09/01/2026B01046929-S2Open ↗
08/24/2026B01046929-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026B01084833-I1Open ↗
08/24/2026B01097515-I1Open ↗
08/23/2026B01046929-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B01046929-S1Open ↗
08/23/2026B01046929-I1Open ↗
08/22/2026B01046929-P1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01046929-P1Open ↗
08/13/2026B01046929-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026B01084833-I1Open ↗
08/23/2026B01046929-P1Open ↗
08/23/2026B01046929-S2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/23/2026B01046929-I1Open ↗
08/23/2026B01046929-P1Open ↗
▸DOB NOWFinal Survey1
08/23/2026B01046929-I1Open ↗