← Back
Elevator cooperative
95 PARK TERRACE EAST
MANHATTAN · Inwood · BIN 1065024
💬 Discuss this project
1925Year Built
6Stories
D4Building Class
R7AZoning
41,176 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 95 PARK TERRACE EAST OWNERS · 6,900 sf lot · 5.97 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 5 docs
BulkheadUnder Construction1p · 1 filing · 3 docs
Floor 53p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 27p · 1 filing · 20 docs
Floor 1
Site & exteriorUnder Construction4p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
95 PARK TERRACE EAST OWNERS703/22/2026
SKYLINE NY MANAGEMENT SOLUTIONS403/21/2026
ONEVESTA PROPERTY MANAGEMENT309/09/2026
INTERBORO HOLDING203/21/2026
BRONX INDEPENDENCE APTS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SAGHARI ARCHITECTURAL SERVICES, PC103/30/2026
ZHENG ENGINEERING PLLC504/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCX DESIGN1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY & SUBURBAN CNSTN GRGeneral Contractor404/09/2026
G. & S. PLUMBING & HTG COPlumbing407/08/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
FUTURA BUILDERS GROUP INC.General Contractor109/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY RESTORATION TECHNOLOGY6187103/30/2026
ZHENG ENGINEERING PLLC8512404/04/2025
Building Lifecycle
All (103)Filed (7)Permit Issued (5)Signed Off (2)Facade (FISP) (12)Violation (49)Inspection (5)Objection (6)Special Inspection (17)
09/08/2026
Permit issued — General Construction
M01378869-I1-GC-CX
08/24/2026
Permit issued — Suspended Scaffold
M01443953-I1-SC
08/20/2026
Objection raised — Other
08/20/2026
Objection resolved — Addressed
08/11/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01443953-I1
04/06/2026
Objection resolved — Resolved
04/06/2026
Objection resolved — Resolved
04/02/2026
Objection raised — Structural
04/02/2026
Objection raised — Structural
03/30/2026
Filed — Alteration
Facade repairs as per plans. No change in egress, use, or occupancy.
M01378869-I1
03/30/2026
Special inspection requirement — Masonry
Hamidreza Saghari
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Hamidreza Saghari
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hamidreza Saghari
03/26/2026
Special inspection requirement — Air barrier - visual inspection
Hamidreza Saghari
03/26/2026
Special inspection requirement — Final
Hakan Westergren
11/18/2025
Signed off — Alteration
INTERIOR NON-STRUCTURAL RENOVATION OF APARTMENT UNIT 2G WITH PARTITION WORK. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00974002-I1
11/18/2025
Signed off — Alteration
INTERIOR NON-STRUCTURAL RENOVATION OF APARTMENT UNIT 2G WITH PARTITION WORK. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00974002-S1
05/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/04/2025
Filed — Alteration
INTERIOR NON-STRUCTURAL RENOVATION OF APARTMENT UNIT 2G WITH PARTITION WORK. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00974002-P2
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
03/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2025
Filed — Alteration
INTERIOR NON-STRUCTURAL RENOVATION OF APARTMENT UNIT 2G WITH PARTITION WORK. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00974002-P1
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
03/28/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
03/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
03/28/2025
Special inspection requirement — Final
XIAO ZHENG
03/28/2025
Special inspection requirement — Lighting in dwelling units
XIAO ZHENG
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
03/27/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
03/27/2025
Special inspection requirement — Final
XIAO ZHENG
03/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
03/27/2025
Special inspection requirement — Lighting in dwelling units
XIAO ZHENG
03/25/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/2024
Permit issued — Plumbing
M00974002-S1-PL
03/28/2024
Violation issued (HPD, closed)
C
03/28/2024
Violation issued (HPD, open)
B
03/28/2024
Violation issued (HPD, open)
B
03/28/2024
Violation issued (HPD, closed)
C
02/20/2024
Permit issued — General Construction
M00974002-I1-GC
02/14/2024
Filed — Alteration
INTERIOR NON-STRUCTURAL RENOVATION OF APARTMENT UNIT 2G WITH PARTITION WORK. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00974002-I1
02/14/2024
Filed — Alteration
INTERIOR NON-STRUCTURAL RENOVATION OF APARTMENT UNIT 2G WITH PARTITION WORK. REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00974002-S1
12/14/2023
Cycle 9 facade report signed — SWARMP
11/30/2023
Cycle 9 facade report submitted
10/05/2023
Cycle 9 facade inspection completed
09/22/2023
Permit issued — General Construction
M00906303-I1-GC
08/16/2023
Filed — Alteration
M00906303-I1
05/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/11/2021
Violation issued (ECB, closed)
Elevators
02/10/2021
Violation issued (ECB, closed)
Elevators
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/13/2019
Cycle 8 facade report signed — SAFE
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/25/2019
Cycle 8 facade report submitted
02/20/2019
Cycle 8 facade inspection completed
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFUTURA BUILDERS GROUP INC.09/08/2026
DOB NOWSuspended ScaffoldPermit IssuedFUTURA BUILDERS GROUP,INC08/24/2026
DOB NOWPlumbingSigned-offG. & S. PLUMBING & HTG CO05/01/2024
DOB NOWGeneral ConstructionSigned-offCITY & SUBURBAN CNSTN GR02/20/2024
DOB NOWGeneral ConstructionPermit IssuedCITY & SUBURBAN CNSTN GR09/22/2023
BISEQISSUEDXINOS CONSTRUCTION CORP03/02/2012
BISOTISSUEDXINOS CONSTRUCTION CORP03/01/2012
BISEQISSUEDXINOS CONSTRUCTION CORP11/29/2011
BISOTISSUEDXINOS CONSTRUCTION CORP11/29/2011
BISFSISSUEDM. DEL PERCIO & CO INC04/23/2007
BISOTISSUEDMANHATTAN CONTRACTING CORP04/26/2004
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT04/26/2004
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT04/14/2003
BISEQISSUEDACE SACFFOLD CO INC03/17/1998
3 projects · most recent 07/24/2024
General Wiring
FiledStatusContractorScope
07/24/2024Permit IssuedSTAR ELEC'L CONTRACTORS C—
03/11/2021Permit IssuedGLENDALE ELECTL CONTNG INGeneral Wiring
01/31/2019CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
1 project · most recent 03/30/2026
FiledStatusContractorScope
03/30/2026Permit IssuedFUTURA BUILDERS GROUP INC1 scope_items
1 project · most recent 08/11/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/11/2026Permit IssuedFUTURA BUILDERS GROUP,INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
03/30/2026MasonryHamidreza Sagharispecial
03/26/2026Tenant Protection Plan ComplianceHamidreza Sagharispecial
03/26/2026Structural Stability – Alterations of existing buildingsHamidreza Sagharispecial
03/26/2026Air barrier - visual inspectionHamidreza Sagharienergy_progress
03/26/2026FinalHakan Westergrenprogress
04/04/2025Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
04/04/2025Energy Code Compliance InspectionsXIAO ZHENGprogress
03/28/2025Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
03/28/2025Energy Code Compliance InspectionsXIAO ZHENGprogress
03/28/2025Fire-Resistance Rated ConstructionXIAO ZHENGprogress
03/28/2025FinalXIAO ZHENGprogress
03/28/2025Lighting in dwelling unitsXIAO ZHENGenergy_progress
03/27/2025Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
03/27/2025Energy Code Compliance InspectionsXIAO ZHENGprogress
03/27/2025FinalXIAO ZHENGprogress
03/27/2025Fire-Resistance Rated ConstructionXIAO ZHENGprogress
03/27/2025Lighting in dwelling unitsXIAO ZHENGenergy_progress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026M00906303-I1Request digital key ↗
08/28/2026M00974002-P2Request digital key ↗
08/28/2026M00974002-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
03/08/2012120815216Open ↗
03/06/2012120909151Open ↗
11/29/2011120909151Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
08/28/2012120815216Open ↗
11/30/2011120909151Open ↗
09/19/2011120815216Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026M00906303-I1Open ↗
08/28/2026M00974002-P2Open ↗
08/28/2026M00974002-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M01378869-I1Open ↗
08/28/2026M00974002-I1Open ↗
08/28/2026M00974002-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01378869-I1Open ↗
08/28/2026M00974002-I1Open ↗
08/23/2026M00974002-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/14/2017120909151Open ↗
11/30/2011120909151Open ↗
09/19/2011120815216Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/30/2011120909151Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/30/2011120909151Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026M00906303-I1Open ↗
08/28/2026M00974002-P1Open ↗
08/28/2026M00974002-P2Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
11/30/2011120909151Open ↗
09/19/2011120815216Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/06/2012120909151Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/14/2017120909151Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/28/2012120815216Open ↗
09/19/2011120815216Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
11/30/2011120909151Open ↗
09/19/2011120815216Open ↗
▸BISBOROUGH INTAKE FORM1
12/14/2017120909151Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/16/2026M01443953-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01443953-I1Open ↗