← Back
One story - permanent living quarter
95 WINDSOR ROAD
STATEN ISLAND · BIN 5017487
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R2Zoning
880 sfGross Floor Area
1Units
0 Open Violations
One story - permanent living quarter · 9,061 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WORLD DESIGN ARCHITECTURE,PLLC109/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EBC CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KC EXPEDITING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323109/25/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
12/13/2024
Signed off — Alteration
S01117180-I1
10/31/2024
Permit issued — Solar
S01117180-I1-SL
09/25/2024
Filed — Alteration
S01117180-I1
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
09/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
09/25/2024
Special inspection requirement — Final
JEFFREY BELL
09/25/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
09/11/2003
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKC EXPEDITING INC10/31/2024
1 project · most recent 09/18/2024
FiledStatusContractorScope
09/18/2024CompleteVILLAGE ELECTL CONTRS INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/25/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
09/25/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
09/25/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
09/25/2024FinalJEFFREY BELLprogress
09/25/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01117180-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026S01117180-I1Open ↗
08/23/2026S01117180-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026S01117180-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026S01117180-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026S01117180-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01117180-I1Open ↗