1920Year Built
4Stories
C1Building Class
R7AZoning
17,000 sfGross Floor Area
16Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: WOODRUFF 79 LLC · 5,079 sf lot · 3.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneralOther
Roof1 filing · 20 docs
Floor 41 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS407/08/2026
BG REAL ESTATE707/08/2026
WOODRUFF 79203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RISE ARCHITECTURE207/19/2021
HAIDER ENGINEERING, P.E.107/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA ASSOCIATES403/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUEROCK DEVELOPMENT & COGeneral Contractor507/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
INNOVATIVE HEATING SOLUTIPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIA INSPECTIONS LLC7306207/19/2021
Building Lifecycle
All (75)Filed (3)Permit Issued (5)Signed Off (1)Violation (49)Inspection (3)Special Inspection (14)
02/04/2026
Violation issued (HPD, closed)
C
02/04/2026
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
A
10/14/2025
Violation issued (HPD, closed)
B
10/14/2025
Violation issued (HPD, closed)
B
10/14/2025
Violation issued (HPD, closed)
C
10/14/2025
Violation issued (HPD, closed)
B
10/14/2025
Violation issued (HPD, closed)
A
10/14/2025
Violation issued (HPD, closed)
A
03/01/2025
Violation issued (HPD, closed)
B
03/01/2025
Violation issued (HPD, closed)
B
11/21/2023
Violation issued (HPD, closed)
I
09/18/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/23/2023
Permit issued — General Construction
B00483337-I1-GC
05/10/2023
Violation issued (HPD, closed)
C
05/10/2023
Violation issued (HPD, closed)
C
05/10/2023
Violation issued (HPD, closed)
B
05/04/2023
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
05/03/2023
Violation issued (HPD, closed)
B
05/03/2023
Violation issued (HPD, closed)
B
05/03/2023
Violation issued (HPD, closed)
B
01/30/2023
Permit issued — General Construction
B00483337-I1-GC
07/20/2022
Signed off — Alteration
B00062488-I1
04/06/2022
Violation issued (HPD, open)
B
04/06/2022
Violation issued (HPD, open)
B
04/06/2022
Violation issued (HPD, closed)
A
04/06/2022
Violation issued (HPD, open)
C
04/06/2022
Violation issued (HPD, open)
B
04/06/2022
Violation issued (HPD, closed)
A
08/17/2021
Permit issued — Plumbing
B00483337-S1-PL
07/19/2021
Filed — Alteration CO
B00483337-S1
07/08/2021
Permit issued — General Construction
B00483337-I1-GC
07/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
07/02/2021
Special inspection requirement — Energy Code Compliance Inspections
JEFF AKERMAN
05/21/2021
Filed — Alteration CO
B00483337-I1
05/19/2021
Special inspection requirement — Interior lighting power
SHIMON GREENEBAUM
05/14/2021
Special inspection requirement — Fenestration air leakage
JEFF AKERMAN
04/13/2021
Violation issued (HPD, closed)
A
03/09/2021
Special inspection requirement — Fenestration areas
JEFF AKERMAN
03/09/2021
Special inspection requirement — Lighting in dwelling units
SHIMON GREENEBAUM
03/09/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOFIA KAPELYAN
03/09/2021
Special inspection requirement — Insulation placement and R values
SHIMON GREENEBAUM
03/09/2021
Special inspection requirement — Air barrier - visual inspection
JEFF AKERMAN
03/09/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
JEFF AKERMAN
03/09/2021
Special inspection requirement — Electrical motors and elevators
JEFF AKERMAN
03/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
03/09/2021
Special inspection requirement — Energy Code Compliance Inspections
JEFF AKERMAN
03/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
JEFF AKERMAN
01/22/2020
Violation issued (HPD, closed)
A
01/22/2020
Violation issued (HPD, closed)
A
01/22/2020
Violation issued (HPD, closed)
A
02/20/2019
Violation issued (HPD, closed)
A
02/20/2019
Violation issued (HPD, closed)
A
02/20/2019
Violation issued (HPD, closed)
A
01/30/2019
Violation issued (HPD, closed)
C
09/16/2018
Violation issued (HPD, closed)
B
09/16/2018
Violation issued (HPD, closed)
B
09/16/2018
Violation issued (HPD, closed)
B
07/19/2018
Filed — Alteration
B00062488-I1
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBLUEROCK DEVELOPMENT & CO08/23/2023
DOB NOWGeneral ConstructionPermit IssuedBLUEROCK DEVELOPMENT & CO01/30/2023
DOB NOWPlumbingPermit IssuedMITIE PLUMBING & HTG CORP08/17/2021
DOB NOWGeneral ConstructionPermit IssuedBLUEROCK DEVELOPMENT & CO07/08/2021
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS07/19/2018
1 project · most recent 07/18/2018
FiledStatusContractorScope
07/18/2018CompleteWCK ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/18/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/04/2023Pass-Final Construction Permit WithdrawalPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/02/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
07/02/2021Energy Code Compliance InspectionsJEFF AKERMANprogress
05/19/2021Interior lighting powerSHIMON GREENEBAUMenergy_progress
05/14/2021Fenestration air leakageJEFF AKERMANenergy_progress
03/09/2021Fenestration areasJEFF AKERMANenergy_progress
03/09/2021Lighting in dwelling unitsSHIMON GREENEBAUMenergy_progress
03/09/2021Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
03/09/2021Insulation placement and R valuesSHIMON GREENEBAUMenergy_progress
03/09/2021Air barrier - visual inspectionJEFF AKERMANenergy_progress
03/09/2021Fenestration and door U-factor and product ratingsJEFF AKERMANenergy_progress
03/09/2021Electrical motors and elevatorsJEFF AKERMANenergy_progress
03/09/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
03/09/2021Energy Code Compliance InspectionsJEFF AKERMANprogress
03/09/2021Fire-Resistance Rated ConstructionJEFF AKERMANprogress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026B00062488-I1Request digital key ↗
09/01/2026B00483337-S1Request digital key ↗
09/01/2026B00483337-I1Request digital key ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026B00483337-S1Open ↗
08/27/2026B00483337-I1Open ↗
08/27/2026B00483337-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/03/2026B00062488-I1Open ↗
09/01/2026B00483337-S1Open ↗
09/01/2026B00483337-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B00483337-S1Open ↗
08/27/2026B00483337-I1Open ↗
08/27/2026B00483337-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
09/01/2026B00483337-I1Open ↗
▸DOB NOWStreet Tree Checklist1
09/01/2026B00483337-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00483337-S1Open ↗
09/01/2026B00483337-I1Open ↗
▸Other Documents2
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00062488-I1Open ↗
▸DOB NOWDHCR Document1
09/01/2026B00483337-I1Open ↗