← Back
Elevator cooperative
950 5 AVENUE
MANHATTAN · BIN 1041785
💬 Discuss this project
1926Year Built
14Stories
D4Building Class
R10Zoning
44,351 sfGross Floor Area
10Units
LL97 CoveredRent Stabilized11 Open Violations 7 unresolved · 4 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 950 FIFTH AVE CORP · 3,259 sf lot · 13.61 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Permit Issued — active, not yet Signed-off
Roof5p · 1 filing · 4 docs
Floor 1Under Construction2p · 1 filing · 14 docs
BasementUnder Construction2p · 1 filing · 14 docs
Sub-BasementUnder Construction1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUMLEY HAFT1909/13/2026
KAJ NY CONSTRUCTION1107/08/2026
ACE GROUP NY707/08/2026
PHOENIX SUTTON STR INC703/22/2026
950 FIFTH AVENUE4903/22/2026
SIGMA CONSTRUCTION GROUP203/22/2026
950 FIFTH AVE CORP/GUMLEY403/22/2026
EURO CASTLE CONSTRUCTION203/22/2026
950 5TH AVENUE1103/21/2026
950 5RH AVE CORP C O GUMLEY HAFT603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
GREEN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIGMA CONSTRUCTION GROUPGeneral Contractor1007/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor607/08/2026
PHOENIX SUTTON STR INCGeneral Contractor403/21/2026
ACE GROUP NY CORPGeneral Contractor207/08/2026
PRECISION WORLDWIDEGeneral Contractor208/11/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
PAUL BOCCIAElectrical103/21/2026
BENJAMIN DREBINElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
RICHARD GRIMAElectrical103/21/2026
BERARDI, ONOFRIOElectrical103/21/2026
DOUGLAS LIMONGELLIElectrical103/21/2026
GERNDT, MATTHEWElectrical103/21/2026
JOSEPH SGROIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROJECT TACTICAL SOLUTION5859105/20/2026
SPECIAL TESTING & CONSULT1688105/05/2021
Building Lifecycle
All (123)Filed (8)Permit Issued (14)Signed Off (1)Facade (FISP) (12)Violation (60)Objection (20)Special Inspection (8)
08/10/2026
Permit issued — Mechanical Systems
M01393235-S1-MS
08/05/2026
Permit issued — General Construction
M01393235-I1-GC
07/22/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/26/2026
Objection resolved — Resolved
06/26/2026
Objection resolved — Resolved
06/26/2026
Objection resolved — Resolved
06/26/2026
Objection resolved — Resolved
06/26/2026
Objection resolved — Resolved
06/26/2026
Objection resolved — Resolved
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
06/15/2026
Objection raised — Inspections
06/15/2026
Objection raised — Fire_Protection
06/15/2026
Objection raised — Admin
06/15/2026
Objection raised — Scope
06/15/2026
Objection raised — Admin
06/15/2026
Objection raised — Scope
06/15/2026
Objection raised — Scope
06/15/2026
Objection raised — Scope
06/15/2026
Objection raised — Inspections
06/15/2026
Objection raised — Scope
05/20/2026
Filed — Alteration
MECHANICAL DUCTWORK FOR DENTIST OFFICE RENOVATION
M01393235-S1
05/19/2026
Filed — Alteration
MECHANICAL DUCTWORK FOR DENTIST OFFICE RENOVATION
M01393235-I1
05/15/2026
Special inspection requirement — Interior lighting power
Bobir Botir
05/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
Bobir Botir
05/15/2026
Special inspection requirement — Lighting controls
Bobir Botir
05/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
04/27/2026
Special inspection requirement — Final
Bobir Botir
04/27/2026
Special inspection requirement — Mechanical Systems
Max Lee
04/27/2026
Special inspection requirement — Final
Bobir Botir
04/23/2024
Cycle 9 facade report signed — SWARMP
02/12/2024
Cycle 9 facade report submitted
01/23/2024
Cycle 9 facade inspection completed
10/13/2023
Permit issued — General Construction
M00488083-I1-GC
07/26/2023
Permit issued — General Construction
M00488083-I1-GC
07/24/2023
Filed — Alteration
M00811717-P1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2023
Violation issued (ECB, open)
Construction
01/13/2023
Filed — Alteration
M00811717-I1
01/13/2023
Permit issued — Sidewalk Shed
M00811717-I1-SF
01/13/2023
Permit issued — Supported Scaffold
M00811717-I1-SH
12/28/2022
Violation issued (ECB, closed)
Construction
12/28/2022
Violation issued (ECB, closed)
Construction
12/12/2022
Signed off — Alteration
M00271572-I1
10/11/2022
Permit issued — General Construction
M00488083-I1-GC
05/26/2022
Permit issued — Supported Scaffold
M00590570-I1-SF
05/26/2022
Permit issued — Sidewalk Shed
M00590569-I1-SH
02/15/2022
Violation issued (HPD, closed)
A
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2021
Violation issued (ECB, open)
Construction
09/21/2021
Permit issued — General Construction
M00488083-I1-GC
09/21/2021
Violation issued (ECB, open)
Construction
09/21/2021
Violation issued (ECB, closed)
Construction
09/21/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2021
Permit issued — Sidewalk Shed
M00590569-I1-SH
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPRECISION WORLDWIDE08/10/2026
DOB NOWGeneral ConstructionPermit IssuedPRECISION WORLDWIDE08/05/2026
DOB NOWGeneral ConstructionPermit IssuedSIGMA CONSTRUCTION GROUP10/13/2023
DOB NOWGeneral ConstructionPermit IssuedSIGMA CONSTRUCTION GROUP07/26/2023
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP01/13/2023
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP01/13/2023
DOB NOWGeneral ConstructionPermit IssuedSIGMA CONSTRUCTION GROUP10/11/2022
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC05/26/2022
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC05/26/2022
DOB NOWGeneral ConstructionPermit IssuedSIGMA CONSTRUCTION GROUP09/21/2021
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC09/13/2021
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC09/13/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/26/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/26/2019
BISMHISSUEDTACONIC BUILDERS INC01/13/2017
BISOTISSUEDTACONIC BUILDERS INC01/13/2017
BISOTISSUEDTACONIC BUILDERS INC01/12/2017
BISPLRE-ISSUEDDONATO PLUMBING GROUP INC05/06/2016
BISMHISSUEDTACONIC BUILDERS INC01/13/2016
BISOTISSUEDTACONIC BUILDERS INC01/13/2016
BISOTISSUEDTACONIC BUILDERS INC01/13/2016
BISEQISSUEDEVEREST SCAFFOLDING INC08/11/2015
BISEQISSUEDEVEREST SCAFFOLDING INC08/10/2015
BISPLISSUEDDONATO INC05/18/2015
BISOTISSUEDTACONIC BUILDERS INC05/14/2015
BISOTRE-ISSUEDTACONIC BUILDERS INC05/14/2015
BISMHISSUEDTACONIC BUILDERS INC05/14/2015
BISOTISSUEDEURO CASTLE CONSTRUCTION02/05/2015
BISEQISSUEDEVEREST SCAFFOLDING INC08/20/2014
BISEQISSUEDEVEREST SCAFFOLDING INC08/20/2014
BISPLISSUEDA STEINMAN PLG & HTG CORP07/30/2014
BISOTISSUEDEURO CASTLE CONSTRUCTION06/27/2014
BISOTISSUEDLICO CONTRACTING INC12/19/2013
BISOTISSUEDC.N. RENOVATION CO., INC09/18/2013
BISMHISSUEDLICO CONTRACTING INC08/14/2013
BISMHISSUEDC.N. RENOVATION CO., INC08/12/2013
BISPLISSUEDA STEINMAN PLG & HTG CORP07/08/2013
BISMHISSUEDPAUL RYAN ASSOCIATES06/27/2013
BISOTISSUEDPAUL RYAN ASSOCIATES06/27/2013
BISPLISSUEDA STEINMAN PLG & HTG CORP05/01/2013
+ 24 more permits on file
2 projects · most recent 09/13/2021
FiledStatusContractorScope
09/13/2021Permit IssuedRICHARD NEU—
11/18/2019Permit IssuedELPO ELECTRICAL CONTG INC—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/22/2026Fire-Resistant Penetrations and JointsMax Leespecial
05/15/2026Interior lighting powerBobir Botirenergy_progress
05/15/2026Duct leakage testing, insulation and designBobir Botirenergy_progress
05/15/2026Lighting controlsBobir Botirenergy_progress
05/07/2026Tenant Protection Plan ComplianceMax Leespecial
04/27/2026FinalBobir Botirprogress
04/27/2026Mechanical SystemsMax Leespecial
04/27/2026FinalBobir Botirprogress
▾Documents — 351 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
09/03/2026M00488083-I1Request digital key ↗
09/03/2026M00590570-I1Request digital key ↗
09/03/2026M00590569-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00271572-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00271572-I1Request digital key ↗
▸Applications & Permits104
▸BISWORK PERMIT APPLICATION59
01/26/2017122203356Open ↗
01/26/2017122203356Open ↗
01/26/2017122203356Open ↗
Showing 3 of 59 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION41
08/16/2018123364215Open ↗
12/11/2017103210204Open ↗
12/01/2015122203356Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWLPC Approval/Permit3
08/14/2026M01393235-S1Open ↗
08/14/2026M01393235-I1Open ↗
08/13/2026M00488083-I1Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/06/2012110337387Open ↗
▸Seals & Professional Certifications57
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
07/12/2019123364215Open ↗
08/24/2018140243010Open ↗
08/24/2018140243029Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/05/2026M00271572-I1Open ↗
09/03/2026M00488083-I1Open ↗
09/03/2026M00590569-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026M01393235-S1Open ↗
08/25/2026M01393235-S1Open ↗
08/25/2026M01393235-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/01/2013121445935Open ↗
11/29/2012121445935Open ↗
07/12/2012121144555Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/29/2012121445935Open ↗
07/12/2012121144555Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/19/2014140243029Open ↗
08/19/2014140243010Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/19/2014140243029Open ↗
08/19/2014140243010Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/19/2014140243029Open ↗
08/19/2014140243010Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M01393235-S1Open ↗
▸Trade Schedules & Equipment37
▸BISSELF-CERT PLUMBING NOTICE20
08/16/2014120747353Open ↗
12/30/2013121445935Open ↗
09/19/2013121445935Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING15
06/27/2013120884258Open ↗
06/11/2013121445935Open ↗
06/03/2013120884258Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/01/2015122203356Open ↗
01/29/2015122203356Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes1
08/16/2018123364215Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/15/2015122203356Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00271572-I1Open ↗
▸Environmental & Asbestos20
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/27/2018123364215Open ↗
08/19/2014140243029Open ↗
04/09/2014121969986Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
01/22/2013121499280Open ↗
01/22/2013121499280Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026M01393235-S1Open ↗
08/14/2026M01393235-I1Open ↗
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00488083-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/16/2018123364215Open ↗
04/09/2014121969986Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
01/22/2013121499280Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/19/2014140243010Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/19/2014140243029Open ↗
08/19/2014140243010Open ↗
▸Approvals, Objections & Sign-offs40
▸BISLANDMARKS APPROVAL19
12/12/2017100651288Open ↗
01/29/2015122203356Open ↗
08/19/2014140243029Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
05/31/2013121634972Open ↗
01/22/2013121499280Open ↗
11/29/2012121445935Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/24/2018140243010Open ↗
08/24/2018140243029Open ↗
12/12/2017100651288Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
08/26/2015140243010Open ↗
05/08/2013110377618Open ↗
12/06/2012110337387Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
05/10/2016122203356Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
08/16/2018123364215Open ↗
08/16/2018123364215Open ↗
02/09/2015121969986Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms47
▸BISADDITIONAL INFORMATION21
09/27/2018123364215Open ↗
09/27/2018123364215Open ↗
12/16/2015122203356Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET17
08/16/2018123364215Open ↗
01/29/2015122203356Open ↗
01/29/2015122203356Open ↗
Showing 3 of 17 on file for this type
▸BISeFiling Job Application Cover Sheet5
01/22/2013121499280Open ↗
08/19/2014140243029Open ↗
08/19/2014140243010Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
08/24/2018140243010Open ↗
08/24/2018140243029Open ↗
12/12/2017100651288Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/29/2015122203356Open ↗
Showing 1 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
02/06/2013121445935Open ↗