← Back
Single or multiple dwelling with stores or offices
952 4 AVENUE
BROOKLYN · BIN 3010269
💬 Discuss this project
1970Year Built
3Stories
S9Building Class
M1-2DZoning
4,227 sfGross Floor Area
4Units
1 Open Violation ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 952 FOURTH AVENUE LLC · 1,654 sf lot · 2.56 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 12p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROUNDABOUT502 RESTAURANT807/08/2026
REJAS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H G LEE ARCHITECT PC102/19/2026
NEVILLE ENGINEERING GROUP303/10/2022
LUKE LICALZI, P.E., P.C.109/04/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SCARANO ARCHITECT603/21/2026
R MANETTA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOE PARZIALE PLUMBING COPlumbing307/08/2026
RED HOOK SIGN ELECTScaffold207/08/2026
P.S.I. MECHANICALPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HG LEE ARCHITECT PC2554102/19/2026
Building Lifecycle
All (26)Filed (5)Permit Issued (3)Violation (8)Inspection (10)
02/19/2026
Filed — Alteration
B01355709-I1
03/04/2025
Violation issued (ECB, closed)
Construction
06/07/2023
Violation issued (ECB, open)
Construction
12/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2022
Filed — Alteration
Proposed alteration to existing plumbing fixtures within the 1st floor only of the existing Eating and Drinking Establishment. No change to use, occupancy or egress under this application.
B00634866-P2
03/01/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/19/2022
Filed — Alteration
Proposed alteration to existing plumbing fixtures within the 1st floor only of the existing Eating and Drinking Establishment. No change to use, occupancy or egress under this application.
B00634866-P1
02/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/31/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/11/2022
Permit issued — Plumbing
B00634866-I1-PL
12/09/2021
Filed — Alteration
Proposed alteration to existing plumbing fixtures within the 1st floor only of the existing Eating and Drinking Establishment. No change to use, occupancy or egress under this application.
B00634866-I1
09/04/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/13/2019
Violation issued (ECB, closed)
Construction
12/18/2018
Permit issued — Sign
B00073366-I1-SG
10/01/2018
Permit issued — Sign
B00073366-I1-SG
09/04/2018
Filed — Alteration
B00073366-I1
08/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/24/2005
Violation issued (ECB, closed)
Construction
09/24/2005
Violation issued (ECB, closed)
Public Assembly
07/08/1991
Violation issued (FDNY_ORDER, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOE PARZIALE PLUMBING CO01/11/2022
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT12/18/2018
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT10/01/2018
1 job · most recent 03/10/2022
Gas
FiledStatusContractorScope
03/10/2022Permit IssuedJOE PARZIALE PLUMBING COGas
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/16/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/02/2026B00073366-I1Request digital key ↗
08/31/2026B00634866-I1Request digital key ↗
08/31/2026B00634866-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
04/30/2019302033207Open ↗
04/15/2019302033207Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026B00073366-I1Open ↗
08/31/2026B00634866-P1Open ↗
08/31/2026B00634866-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026B00073366-I1Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM2
04/30/2019302033207Open ↗
04/15/2019302033207Open ↗