← Back
Two family frame
952 POST AVENUE
STATEN ISLAND · Port Richmond · BIN 5024123
💬 Discuss this project
1940Year Built
2.5Stories
B2Building Class
R3AZoning
2,139 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family frame · Owner of record: SEVEN JW LLC · 2,500 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC208/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272208/08/2025
Building Lifecycle
All (24)Filed (2)Permit Issued (1)Signed Off (1)Violation (10)Special Inspection (10)
12/16/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01247211-I1
08/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/11/2025
Special inspection requirement — Final
Walid Abdulla
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/11/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/08/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01247211-P1
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/06/2025
Special inspection requirement — Final
Walid Abdulla
08/06/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/07/2025
Permit issued — Solar
S01247211-I1-SL
06/27/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01247211-I1
12/05/2024
Violation issued (HPD, closed)
I
11/30/2023
Violation issued (HPD, closed)
I
11/21/2022
Violation issued (HPD, closed)
I
03/18/2022
Violation issued (HPD, closed)
I
04/22/2021
Violation issued (HPD, closed)
I
10/02/2020
Violation issued (HPD, open)
B
10/02/2020
Violation issued (HPD, closed)
B
10/02/2020
Violation issued (HPD, closed)
B
10/02/2020
Violation issued (HPD, closed)
B
10/02/2020
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/07/2025
2 projects · most recent 02/24/2026
FiledStatusContractorScope
02/24/2026CompleteVOLTRON ELECTRIC LLC2 meters, 2 new_meters
06/27/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/11/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/11/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/11/2025FinalWalid Abdullaprogress
08/11/2025Energy Code Compliance InspectionsWalid Abdullaprogress
08/11/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
08/06/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/06/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/06/2025Energy Code Compliance InspectionsWalid Abdullaprogress
08/06/2025FinalWalid Abdullaprogress
08/06/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01247211-I1Request digital key ↗
08/19/2026S01247211-P1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/25/2026S01247211-P1Open ↗
08/25/2026S01247211-P1Open ↗
08/25/2026S01247211-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026S01247211-P1Open ↗
08/25/2026S01247211-P1Open ↗
08/24/2026S01247211-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026S01247211-I1Open ↗
08/13/2026S01247211-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026S01247211-I1Open ↗
08/13/2026S01247211-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01247211-I1Open ↗