← Back
One family attached or semi-detached
952 ROCKLAND AVENUE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5175369
💬 Discuss this project
2022Year Built
2Stories
A5Building Class
R3-1Zoning
1,426 sfGross Floor Area
1Units
One family attached or semi-detached · 2,364 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Floor 25p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION1007/08/2026
ISLAND ENGINEERING ASSOCIATES203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT402/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor507/08/2026
A. J. CARUSO ELECTRICAL IElectrical203/22/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264102/04/2022
Building Lifecycle
All (49)Filed (4)Permit Issued (5)Signed Off (2)Inspection (8)Objection (2)Special Inspection (28)
04/30/2024
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
06/29/2023
Signed off — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00633741-S2
06/28/2023
Signed off — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00633741-S1
06/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2023
Permit issued — Plumbing
S00633741-S2-PL
06/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/13/2023
Permit issued — Mechanical Systems
S00633741-I1-GC-CX
03/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2023
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00633741-P1
08/22/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/27/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/08/2022
Permit issued — Plumbing
S00633741-S2-PL
06/06/2022
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00633741-S2
04/25/2022
Permit issued — Curb Cut
S00633741-S1-CC
04/08/2022
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00633741-S1
03/16/2022
Permit issued — Earth Work
S00633741-I1-GC-CX
03/13/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
03/03/2022
Objection raised — Scope
03/03/2022
Objection resolved — Addressed
02/04/2022
Filed — New Building
INSTALLATION OF NEW 8.5 FOOT WIDE CURB CUT TO BE COMBINED WITH ADJACENT CURB CUT TOTALLING 17 FEET.
S00633741-I1
02/04/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
02/04/2022
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
11/18/2021
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
11/18/2021
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
11/18/2021
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/20/2023
DOB NOWMechanical SystemsPermit IssuedWALLACE AVENUE CONSTR LLC03/13/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/08/2022
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC04/25/2022
DOB NOWEarth WorkPermit IssuedWALLACE AVENUE CONSTR LLC03/16/2022
1 project · most recent 02/09/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/09/2023Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 04/03/2023
General Wiring
FiledStatusContractorScope
04/03/2023CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 02/09/2023
Concrete Wood
FiledStatusContractorScope
02/09/2023Signed-offFLOW-RIGHT PLBG & HTG CORConcrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/30/2024Pass-Final Construction Permit WithdrawalPassView ↗
06/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2022Pass-Final PL - UndergroundPassView ↗
06/27/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/13/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
02/04/2022Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
02/04/2022Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
02/04/2022Exterior Insulation and Finish Systems (EIFS)WILLIAM DURDEN, P.E.special
02/04/2022Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
02/04/2022Subgrade InspectionsWILLIAM DURDEN, P.E.special
02/04/2022Fenestration areasWILLIAM DURDEN, P.E.energy_progress
02/04/2022Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
02/04/2022HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
02/04/2022Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
02/04/2022Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
02/04/2022Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
02/04/2022Structural Wood FrameWILLIAM DURDEN, P.E.progress
02/04/2022HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
02/04/2022Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
02/04/2022HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
02/04/2022Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
02/04/2022Maintenance informationWILLIAM DURDEN, P.E.energy_progress
02/04/2022Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
02/04/2022Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
02/04/2022Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
02/04/2022Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
02/04/2022Permanent certificateWILLIAM DURDEN, P.E.energy_progress
02/04/2022Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
02/04/2022Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 28.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00633741-P1Request digital key ↗
08/23/2026S00633741-S2Request digital key ↗
08/23/2026S00633741-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00633741-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00633741-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00633741-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00633741-I1Open ↗
08/23/2026S00633741-P1Open ↗
08/23/2026S00633741-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026S00633741-I1Open ↗
08/28/2026S00633741-I1Open ↗
08/28/2026S00633741-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026S00633741-I1Open ↗
08/28/2026S00633741-I1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00633741-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00633741-I1—
▸Safety & Tenant Protection4
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00633741-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00633741-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00633741-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00633741-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00633741-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00633741-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00633741-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00633741-I1Open ↗
▸Other Documents4
▸DOB NOWFinal Survey1
08/13/2026S00633741-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00633741-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00633741-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026S00633741-I1Open ↗