← Back
Predominantly retail with other uses
952A FLATBUSH AVENUE
BROOKLYN · BIN 3117174
💬 Discuss this project
1910Year Built
3Stories
K4Building Class
C4-4AZoning
4,300 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: SHELSAN REALTY CORP. · 2,260 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof4p · 1 filing · 8 docs
Floor 35p · 2 filings · 11 docs
Floor 23p · 2 filings · 11 docs
Floor 15p · 2 filings · 11 docs
Cellar7p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 954 FLATBUSH AVE103/22/2026
PSA REALTY103/22/2026
SHELSAN REALTY CORP.103/22/2026
CAD SIGNS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECHNEMOTION DESIGN311/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HESCOTT, CARDINALElectrical203/21/2026
RAMSARRAN, RAMESHElectrical203/21/2026
Building Lifecycle
All (32)Filed (3)Violation (15)Objection (8)Special Inspection (6)
11/24/2025
Violation issued (FDNY_NOV, closed)
11/24/2025
Violation issued (FDNY_NOV, closed)
06/09/2025
Violation issued (FDNY_NOV, closed)
11/29/2023
Filed — Alteration CO
INTERIOR RENOVATION THROUGHOUT CELLAR, COMMERCIAL SPACE ON FIRST FLOOR AND RESIDENTIAL UNITS ON SECOND AND THIRD FLOORS
B00482479-P1
10/04/2023
Filed — Alteration
B00904464-I1
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/22/2023
Special inspection requirement — Energy Code Compliance Inspections
06/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
06/22/2023
Special inspection requirement — Interior lighting power
06/22/2023
Special inspection requirement — Lighting in dwelling units
07/14/2021
Objection resolved — Addressed
07/14/2021
Objection resolved — Addressed
07/14/2021
Objection resolved — Addressed
07/14/2021
Objection resolved — Addressed
06/16/2021
Objection raised — Accessibility
06/16/2021
Objection raised — Other
06/16/2021
Objection raised — Other
06/16/2021
Objection raised — Structural
05/14/2021
Filed — Alteration CO
INTERIOR RENOVATION THROUGHOUT CELLAR, COMMERCIAL SPACE ON FIRST FLOOR AND RESIDENTIAL UNITS ON SECOND AND THIRD FLOORS
B00482479-I1
04/12/2000
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
04/12/2000
Violation issued (ECB, closed)
Construction
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/1989
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
11/14/1989
Violation issued (ECB, closed)
Boilers
05/18/1989
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/22/2023Fire-Resistant Penetrations and Joints—special
06/22/2023Structural Stability – Alterations of existing buildings—special
06/22/2023Energy Code Compliance Inspections—progress
06/22/2023Fire-Resistance Rated Construction—progress
06/22/2023Interior lighting power—energy_progress
06/22/2023Lighting in dwelling units—energy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00482479-P1Request digital key ↗
08/26/2026B00904464-I1Request digital key ↗
08/15/2026B00482479-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00482479-I1Open ↗
09/01/2026B00482479-P1Open ↗
08/26/2026B00904464-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
09/01/2026B00482479-P1Open ↗
08/15/2026B00482479-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00482479-P1Open ↗
08/26/2026B00904464-I1Open ↗
08/15/2026B00482479-I1Open ↗