← Back
BuildNYC
Two family frame
953 IONIA AVENUE
STATEN ISLAND · BIN 5174967
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
2,189 sfGross Floor Area
2Units
Two family frame · 4,200 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 2Red Arc plumbing and drywells16p · 2 filings · 20 docs
Floor 1Red Arc plumbing and drywells17p · 3 filings · 20 docs
Basement7p · 1 filing · 20 docs
Sub-BasementRed Arc plumbing and drywells9p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Woodrow Plaza LLC 2907/08/2026
Pina Development603/21/2026
Block203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sanna & Loccisano Architects709/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sanna Loccisano Architects P1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pina DevelopementGeneral Contractor707/08/2026
Duo Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738709/09/2022
Rogers Calvanico Group PL1324107/26/2021
Building Lifecycle
05/19/2023
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
S00504031-I1-GC-CX
09/09/2022
Filed — New Building
NEW BUILDING APPLICATION FOR THREE-STORY, TWO FAMILY DETACHED RESIDENCE W/ATTACHED ONE CAR GARAGE AND (2)8'-6"x18'-0" PARKING PADS
S00504031-P2
09/09/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/09/2022
Special inspection requirement — Structural Steel - Details
09/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
47 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedPina Developement05/20/2022
DOB NOWCurb CutSigned-offPina Developement05/20/2022
DOB NOWPlumbingSigned-offDuo Plumbing & Heating10/26/2021
DOB NOWGeneral ConstructionPermit IssuedPina Developement07/02/2021
1 project · most recent 09/09/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
09/09/2022Permit IssuedPina DevelopementAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 09/01/2022
General Wiring
FiledStatusContractorScope
09/01/2022CompleteLaser Lite Elect'lGeneral Wiring
1 project · most recent 09/09/2022
Steel Wood
FiledStatusContractorScope
09/09/2022Permit IssuedPina DevelopementSteel, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/09/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/31/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
10/29/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
09/09/2022Structural Steel - Details—special
09/08/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/08/2022Subgrade Inspectionsanthony santorospecial
09/08/2022Structural Steel - High Strength Boltinganthony santorospecial
09/08/2022Mechanical Systemsanthony santorospecial
09/08/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
09/08/2022Concrete - Cast-In-Placeanthony santorospecial
09/08/2022Air barrier - visual inspectionanthony santoroenergy_progress
09/08/2022Air barrier — testing anthony santoroenergy_progress
09/08/2022Maintenance informationanthony santoroenergy_progress
09/08/2022Meteringanthony santoroenergy_progress
09/08/2022Fenestration air leakageanthony santoroenergy_progress
09/08/2022Fenestration areasanthony santoroenergy_progress
09/08/2022Ventilation and air distribution systemanthony santoroenergy_progress
09/08/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/08/2022Energy Code Compliance Inspectionsanthony santoroprogress
09/08/2022Insulation placement and R valuesanthony santoroenergy_progress
09/08/2022Fireplacesanthony santoroenergy_progress
09/08/2022Permanent certificateanthony santoroenergy_progress
09/08/2022Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
09/08/2022Structural Wood Frameanthony santoroprogress
09/08/2022Footing and Foundationanthony santoroprogress
09/08/2022Fire-Resistance Rated Constructionanthony santoroprogress
09/08/2022Finalanthony santoroprogress
09/08/2022Interior lighting poweranthony santoroenergy_progress
Latest 25 of 81.
79 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account