← Back
BuildNYC
Predominantly retail with other uses
955 2ND AVENUE
MANHATTAN · BIN 1038443
💬 Discuss this project
1910Year Built
4Stories
K4Building Class
C1-9Zoning
3,450 sfGross Floor Area
1Units
Rent Stabilized0 Active Violations
Predominantly retail with other uses · Owner of record: 955 Second Ave Owners · 1,600 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDidyma Realty1p · 1 filing · 11 docs
Floor 2Didyma Realty9p · 5 filings · 20 docs
Floor 1Didyma Realty10p · 5 filings · 20 docs
CellarDidyma Realty12p · 3 filings · 20 docs
Filed — no permit issuedDidyma Realty10p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Didyma Realty1307/08/2026
955 End Ave Realty703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Harris Architecture & Design404/15/2026
Levin Engineering201/14/2025
Allen Shinfeld, P.E304/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Project Entry303/21/2026
Levin Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GN Home ImprovementGeneral Contractor407/08/2026
Flint MechanicalPlumbing407/08/2026
KJK ElectricElectrical103/22/2026
H & K RenovationGeneral Contractor107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355201/14/2025
Allen Shinfeld, P.E1305304/18/2023
Building Lifecycle
All (79)Filed (9)Permit Issued (8)Signed Off (4)Violation (19)Inspection (7)Objection (2)Special Inspection (30)
04/30/2026
Objection raised — Scope
04/30/2026
Objection resolved — Open
04/15/2026
Filed — Alteration CO
Altering existing storefront entrance and 1st floor public restroom for ADA compliance, removing winder tread on 1st floor stairway and upgrading fire rating of corridor partition.
M01341275-I1
04/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/20/2025
Signed off — Alteration
INSTALLATION NEW BOILER IN CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00954614-I1
01/29/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
ABDALLAH ELCHERBINI
01/23/2025
Special inspection requirement — Maintenance information
ABDALLAH ELCHERBINI
01/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
ABDALLAH ELCHERBINI
01/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ABDALLAH ELCHERBINI
01/23/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
01/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
01/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
01/14/2025
Filed — Alteration
INSTALLATION NEW BOILER IN CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00954614-P1
01/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/06/2025
Permit issued — Boiler Equipment
M00954614-I1-BE
01/06/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
01/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
01/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dmitry Levin
01/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dmitry Levin
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
01/06/2025
Special inspection requirement — Maintenance information
Dmitry Levin
01/03/2025
Permit issued — Boiler Equipment
M00954614-I1-BE
05/10/2024
Permit issued — Boiler Equipment
M00954614-I1-BE
02/21/2024
Filed — Alteration
INSTALLATION NEW BOILER IN CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00954614-I1
08/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/18/2023
Filed — Alteration
New plumbing fixture as per plan. No change of use, egress or occupancy under this application.
M00820630-P1
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLEN SHINFELD
04/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
02/21/2023
Permit issued — Plumbing
M00820630-I1-PL
02/13/2023
Permit issued — Mechanical Systems
M00820613-I1-GC-CX
02/05/2023
Filed — Alteration
New plumbing fixture as per plan. No change of use, egress or occupancy under this application.
M00820630-I1
02/02/2023
Filed — Alteration
Interior Renovation of existing restaurant as per plan, new finishes, painting and new flooring. New kitchen hood with exhaust and make-up air. New split system. No change of use, occupancy or egress.
M00820613-I1
02/02/2023
Special inspection requirement — Lighting controls
ALLEN SHINFELD
02/02/2023
Special inspection requirement — Interior lighting power
ALLEN SHINFELD
02/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
ALLEN SHINFELD
02/02/2023
Special inspection requirement — Ventilation and air distribution system
ALLEN SHINFELD
02/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALLEN SHINFELD
02/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALLEN SHINFELD
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLEN SHINFELD
02/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALLEN SHINFELD
01/30/2023
Special inspection requirement — Mechanical Systems
ALLEN SHINFELD
01/30/2023
Special inspection requirement — Final
ALLEN SHINFELD
11/22/2022
Signed off — Alteration
Providing floor opening between the first floor and second floor to accommodate a new convenient stairway, and construction of new toilet rooms on the first floor and second floor.
M00727263-I1
10/19/2022
Signed off — Alteration
M00780660-I1
10/19/2022
Signed off — Alteration
Installation of plumbing fixtures for two new restrooms and other plumbing fixtures needed for restaurant space on first and second floors.
M00741833-I1
10/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2022
Permit issued — Plumbing
M00741833-I1-PL
08/18/2022
Permit issued — General Construction
M00727263-I1-GC
08/16/2022
Permit issued — General Construction
M00780660-I1-GC
07/25/2022
Filed — Alteration
M00780660-I1
07/25/2022
Special inspection requirement — Final
Arthur Harris
07/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
Arthur Harris
05/25/2022
Filed — Alteration
Installation of plumbing fixtures for two new restrooms and other plumbing fixtures needed for restaurant space on first and second floors.
M00741833-I1
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFlint Mechanical01/06/2025
DOB NOWBoiler EquipmentSigned-offFlint Mechanical01/03/2025
DOB NOWBoiler EquipmentSigned-offFlint Mechanical05/10/2024
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp02/21/2023
DOB NOWMechanical SystemsPermit IssuedH & K Renovation02/13/2023
DOB NOWPlumbingSigned-offFlint Mechanical09/01/2022
DOB NOWGeneral ConstructionSigned-offGN Home Improvement08/18/2022
DOB NOWGeneral ConstructionSigned-offGN Home Improvement08/16/2022
BISPLISSUEDI.M.P. Plumbing & Heating11/06/2019
BISOTISSUEDI.M.P. PLG & Heating07/13/2017
BISPLISSUEDI.M.P. Plumbing & Heating03/29/2017
BISOTISSUEDI.M.P. PLG & Heating02/28/2017
BISPLISSUEDI.M.P. Plumbing & Heating02/28/2017
BISFPISSUEDIdeal Fire Safety Systems09/01/2009
BISPLISSUEDShor Plumbing & Heating10/26/2001
BISOTISSUEDJoel Renovations04/05/2001
1 project · most recent 02/02/2023
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/02/2023Permit IssuedH & K RenovationHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Fujitsu ASU18RLF 24,000 BTU · Fan Coil Indoor ×4
AOU36RLXFZ1 36,000 BTU · Condensing Unit ×2
Ventilation
N/A NA 1,500 CFM · Kitchen Exhaust ×1
2 projects · most recent 03/13/2024
General Wiring
FiledStatusContractorScope
03/13/2024CompleteKJK ElectricGeneral Wiring
06/13/2022Permit IssuedG. Poulakis Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/29/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/14/2026Tenant Protection Plan Compliance—special
01/23/2025HVAC-R and service water heating equipmentABDALLAH ELCHERBINIenergy_progress
01/23/2025Maintenance informationABDALLAH ELCHERBINIenergy_progress
01/23/2025HVAC-R and service water heating system controlsABDALLAH ELCHERBINIenergy_progress
01/23/2025HVAC-R and service water piping design and insulationABDALLAH ELCHERBINIenergy_progress
01/23/2025Heating SystemsABDALLAH ELCHERBINIspecial
01/23/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
01/23/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
01/08/2025Tenant Protection Plan Compliance—special
01/06/2025Heating SystemsABDALLAH ELCHERBINIspecial
01/06/2025HVAC-R and service water piping design and insulation—energy_progress
01/06/2025HVAC-R and service water heating system controlsDmitry Levinenergy_progress
01/06/2025HVAC-R and service water heating equipmentDmitry Levinenergy_progress
01/06/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
01/06/2025Maintenance informationDmitry Levinenergy_progress
04/18/2023Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
04/18/2023Tenant Protection Plan Compliance—special
02/02/2023Lighting controlsALLEN SHINFELDenergy_progress
02/02/2023Interior lighting powerALLEN SHINFELDenergy_progress
02/02/2023HVAC-R and service water heating system controlsALLEN SHINFELDenergy_progress
02/02/2023Ventilation and air distribution systemALLEN SHINFELDenergy_progress
02/02/2023HVAC-R and service water heating equipmentALLEN SHINFELDenergy_progress
02/02/2023Tenant Protection Plan ComplianceALLEN SHINFELDspecial
02/02/2023Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
02/02/2023HVAC-R and service water piping design and insulationALLEN SHINFELDenergy_progress
Latest 25 of 32.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/02/2026M00727263-I1Request digital key ↗
09/02/2026M00741833-I1Request digital key ↗
09/02/2026M00780660-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
02/19/2020123037141Open ↗
02/18/2020140609544Open ↗
02/14/2020123037141Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION10
11/07/2019140609544Open ↗
11/07/2019140609544Open ↗
11/07/2019123037141Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026M00954614-I1Open ↗
08/29/2026M00780660-I1Open ↗
08/29/2026M00780660-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M01341275-I1Open ↗
09/02/2026M00727263-I1Open ↗
09/02/2026M00780660-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00954614-I1Open ↗
09/23/2026M00954614-I1Open ↗
08/28/2026M00954614-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/13/2017123037141Open ↗
02/24/2017140609544Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/13/2017123037141Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/24/2017140609544Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/13/2017123037141Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/24/2017140609544Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
02/19/2020123037141Open ↗
02/18/2020140609544Open ↗
02/14/2020123037141Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/24/2017140609544Open ↗
▸BISSCHEDULE B - PLUMBING1
02/24/2017140609544Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
02/24/2017140609544Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/02/2026M00727263-I1Open ↗
09/02/2026M00780660-I1Open ↗
08/31/2026M00820613-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/24/2017140609544Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/24/2017140609544Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/13/2017123037141Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/24/2017140609544Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/24/2017140609544Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/31/2009120128281Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
03/13/2017123037141Open ↗
02/24/2017140609544Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
02/27/2017140609544Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
02/19/2020123037141Open ↗
10/27/2017140609544Open ↗
07/27/2017123037141Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
02/14/2020123037141Open ↗
02/14/2020140609544Open ↗
06/08/2018140609544Open ↗
▸BISEFILING COVER SHEET1
03/13/2017123037141Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/24/2017140609544Open ↗