Elevator cooperative
955 LEXINGTON AVENUE
MANHATTAN · BIN 1042508
💬 Discuss this project
1924Year Built
12Stories
D4Building Class
R9XZoning
54,719 sfGross Floor Area
29Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 957 LEXINGTON AVE CORP · 6,353 sf lot · 8.61 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 81p · 1 filing · 20 docs
Floor 77p · 2 filings · 20 docs
Floor 61p · 1 filing · 15 docs
Floor 53p · 1 filing · 15 docs
Floor 4
Floor 3
Floor 2
Floor 1
8 jobs · most recent 08/14/2026
General Wiring
FiledStatusContractorScope
08/14/2026Permit IssuedRIGID ELECTRIC, INC.General Wiring
10/29/2025CompleteT. MCCAFFREY-T. MCGOVERNGeneral Wiring
03/18/2025CompleteA & S MASTER ELEC'L CORPGeneral Wiring
07/14/2023CompleteBOROWIDE ELECT'L CONTR'S—
05/16/2023CompleteGLENDALE ELECTL CONTNG IN—
04/28/2021CompleteGLENDALE ELECTL CONTNG IN—
06/17/2020CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
06/01/2019Permit IssuedAPOLLO ELECTRIC INC.General Wiring
1 job · most recent 04/23/2025
Scaffold
FiledStatusContractorScope
04/23/2025Permit IssuedCS BRIDGE CORPScaffold
Building Lifecycle
All (158)Filed (21)Permit Issued (19)Signed Off (13)Facade (FISP) (15)Violation (33)Inspection (9)Objection (22)Special Inspection (26)
03/21/2026
Cycle 10 facade report signed — SAFE
03/20/2026
Signed off — Alteration
RENOVATIONS TO APT 5C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01190431-I1
03/19/2026
Signed off — Alteration
RENOVATIONS TO APT 5C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01190431-S2
03/18/2026
Cycle 10 facade inspection completed
03/12/2026
Signed off — Alteration
RENOVATIONS TO APT 5C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01190431-S3
02/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/22/2026
Cycle 10 facade report submitted
12/12/2025
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT 8C.
M01115114-I1
12/11/2025
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT 8C.
M01115114-S2
12/02/2025
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT 8C.
M01115114-S1
10/27/2025
Permit issued — Plumbing
M01190431-S3-PL
10/20/2025
Permit issued — Mechanical Systems
M01190431-S2-MS
10/17/2025
Permit issued — General Construction
M01190431-I1-GC
10/02/2025
Objection raised — Admin
10/02/2025
Objection resolved — Addressed
10/01/2025
Signed off — Alteration
M08054995-I1
09/29/2025
Filed — Alteration
RENOVATIONS TO APT 5C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01190431-S2
09/29/2025
Filed — Alteration
RENOVATIONS TO APT 5C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01190431-S3
09/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2025
Filed — Alteration
RENOVATIONS TO APT 5C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01190431-I1
09/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2025
Signed off — Alteration
installation of suspended scaffold for facade work or inspection. Amend #2, added scaffold drops and outrigger detail
M01007462-I1
04/23/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01214037-I1
04/23/2025
Permit issued — Supported Scaffold
M01214037-I1-SF
04/07/2025
Permit issued — Plumbing
M01115114-S1-PL
04/04/2025
Permit issued — General Construction
M01115114-S2-GC
03/31/2025
Permit issued — General Construction
M01115114-I1-GC
03/27/2025
Objection resolved — Addressed
03/27/2025
Objection resolved — Addressed
03/20/2025
Objection raised — Scope
03/20/2025
Objection raised — Other
03/20/2025
Objection resolved — Addressed
03/20/2025
Objection resolved — Addressed
03/20/2025
Objection resolved — Addressed
03/19/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00901270-I1
03/18/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT 8C.
M01115114-S2
03/12/2025
Objection raised — Scope
03/12/2025
Objection raised — Scope
03/12/2025
Objection raised — Inspections
03/05/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT 8C.
M01115114-S1
03/05/2025
Special inspection requirement — Final
MARISA HARTE
03/05/2025
Special inspection requirement — Mechanical Systems
MARISA HARTE
03/04/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT 8C.
M01115114-I1
02/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
William Ryan
02/28/2025
Special inspection requirement — Air barrier - visual inspection
William Ryan
02/28/2025
Special inspection requirement — Fenestration areas
William Ryan
02/28/2025
Special inspection requirement — Maintenance information
William Ryan
02/28/2025
Special inspection requirement — Fenestration air leakage
William Ryan
02/28/2025
Special inspection requirement — Lighting in dwelling units
William Ryan
01/24/2025
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
01/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/24/2025
Special inspection requirement — Post-installed Anchors
William Ryan
01/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
09/20/2024
Special inspection requirement — Final
William Ryan
07/10/2024
Permit issued — Sidewalk Shed
M00901270-I1-SH
05/23/2024
Permit issued — Suspended Scaffold
M01007462-P2-SC
05/23/2024
Objection resolved — Addressed
05/23/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
Latest 60 of 158 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROWN HARRIS STEVENS1003/22/2026
957 LEXINGTON AVENUE5303/22/2026
BHS MANAGEMENT103/22/2026
955 LEXINGTON203/21/2026
957 LEXINGTON AVE COR203/21/2026
SHAREHOLDER103/21/2026
955 LEXINGTON AVE203/21/2026
957 LEX AVE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KIT MIDDLETON ARCHITECT P C603/21/2026
AE DESIGN SOLUTION603/21/2026
GREEN STUDIO203/21/2026
THE GREEN STUDIO203/21/2026
DOMANI CONSULTING503/21/2026
CONVERSANO ASSOCIATES, INC.603/21/2026
CODE403/21/2026
MILLENNIUM DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARTISTIC CONTRACTINGGeneral Contractor404/09/2026
INTERIOR FINISHES INCGeneral Contractor303/21/2026
SCHNELLBACHER-SENDON GRO*General Contractor207/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor207/08/2026
MCCORMACK CONTRACTING INC.General Contractor204/09/2026
RICHARD GRIMAElectrical103/21/2026
CS BRIDGE CORPGeneral Contractor104/09/2026
DARTOM CONSTRUCTION LLCGeneral Contractor107/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
J&M PLUMBING OF WESTCHESTERPlumbing107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
S. TIEGER PLBG. CO., INCPlumbing107/08/2026
EAST COAST MECHANICALElectrical103/21/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
LEONARD KRITZElectrical103/21/2026
MISTRETTA, EElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983209/29/2025
RYAN SPECIAL ENGINEERING2018203/18/2025
LEO Y LEE ASSOCIATES2481305/10/2024
SAG ENGINEERING & CONSULT608103/28/2023
SETH P ROYE ARCHITECT PC8554103/28/2023
KIMBERLY PECK ARCHITECT,6812203/08/2023
QUALITY TESTING, LLC7344110/08/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS. TIEGER PLBG. CO., INC10/27/2025
DOB NOWMechanical SystemsSigned-offARTISTIC CONTRACTING10/20/2025
DOB NOWGeneral ConstructionSigned-offARTISTIC CONTRACTING10/17/2025
DOB NOWSupported ScaffoldPermit IssuedCS BRIDGE CORP04/23/2025
DOB NOWPlumbingSigned-offJ&M PLUMBING OF WESTCHEST04/07/2025
DOB NOWGeneral ConstructionSigned-offMCCORMACK CONTRACTING INC04/04/2025
DOB NOWGeneral ConstructionSigned-offMCCORMACK CONTRACTING INC03/31/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC07/10/2024
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU05/23/2024
DOB NOWSuspended ScaffoldSigned-offSCHNELLBACHER-SENDON GROU05/21/2024
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*05/20/2024
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU04/17/2024
DOB NOWSuspended ScaffoldSigned-offSCHNELLBACHER-SENDON GROU03/06/2024
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*08/31/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC07/13/2023
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC05/17/2023
DOB NOWGeneral ConstructionSigned-offINTERIOR FINISHES INC05/16/2023
DOB NOWMechanical SystemsSigned-offDARTOM CONSTRUCTION LLC11/02/2020
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I06/16/2020
BISMHISSUEDINTERIOR FINISHES INC02/06/2022
BISOTISSUEDINTERIOR FINISHES INC02/06/2022
BISPLISSUEDGREGG NY PLUMBING, INC04/26/2021
BISMHISSUEDINTERIOR FINISHES INC04/22/2021
BISOTISSUEDINTERIOR FINISHES INC04/19/2021
BISOTISSUEDDARTOM CONSTRUCTION LLC02/18/2021
BISOTISSUEDINTERIOR FINISHES INC06/27/2020
BISMHISSUEDINTERIOR FINISHES INC06/27/2020
BISOTISSUEDDARTOM CONSTRUCTION LLC06/08/2020
BISOTISSUEDINTERIOR FINISHES INC06/10/2019
BISPLISSUEDGREGG NY PLUMBING, INC06/03/2019
BISOTISSUEDINTERIOR FINISHES INC04/30/2019
BISOTISSUEDZEN RESTORATION INC11/05/2018
BISMHISSUEDZEN RESTORATION INC11/05/2018
BISOTISSUEDN/A07/24/2018
BISPLISSUEDPRIMO PLBG & HVAC CORP07/22/2018
BISOTISSUEDZEN RESTORATION INC11/13/2017
BISMHISSUEDZEN RESTORATION INC11/13/2017
BISPLISSUEDPRIMO PLBG & HVAC CORP04/17/2017
BISMHISSUEDZEN RESTORATION INC04/05/2017
BISOTISSUEDZEN RESTORATION INC04/05/2017
+ 29 more permits on file
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
03/05/2025FinalMARISA HARTEprogress
03/05/2025Mechanical SystemsMARISA HARTEspecial
02/28/2025Fenestration and door U-factor and product ratingsWilliam Ryanenergy_progress
02/28/2025Air barrier - visual inspectionWilliam Ryanenergy_progress
02/28/2025Fenestration areasWilliam Ryanenergy_progress
02/28/2025Maintenance informationWilliam Ryanenergy_progress
02/28/2025Fenestration air leakageWilliam Ryanenergy_progress
02/28/2025Lighting in dwelling unitsWilliam Ryanenergy_progress
01/24/2025Energy Code Compliance InspectionsWilliam Ryanprogress
01/24/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/24/2025Post-installed AnchorsWilliam Ryanspecial
01/24/2025Fire-Resistance Rated ConstructionWilliam Ryanprogress
09/20/2024FinalWilliam Ryanprogress
05/23/2024Post-installed AnchorsLeo Leespecial
05/23/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
05/10/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
05/10/2024Post-installed AnchorsLeo Leespecial
03/29/2024Post-installed AnchorsLeo Leespecial
03/29/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
02/13/2023Fire-Resistant Penetrations and Jointskimberly peckspecial
02/13/2023Finalkimberly peckprogress
12/14/2022Energy Code Compliance InspectionsSeth Royeprogress
12/14/2022FinalSeth Royeprogress
12/14/2022Tenant Protection Plan ComplianceChester Kowalskispecial
12/14/2022MasonrySeth Royespecial
Latest 25 of 26.
▾Documents — 487 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
09/02/2026M00718468-P2Request digital key ↗
09/02/2026M00718468-P1Request digital key ↗
09/02/2026M00718431-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026M00301297-I1Request digital key ↗
▸Applications & Permits108
▸BISWORK PERMIT APPLICATION48
02/18/2021123857576Open ↗
02/10/2021123857576Open ↗
10/08/2019123733282Open ↗
Showing 3 of 48 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION46
04/15/2022123869448Open ↗
04/11/2022123869448Open ↗
02/23/2022122962909Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWLPC Approval/Permit13
09/02/2026M00718468-P1Open ↗
08/15/2026M00718431-I1Open ↗
08/14/2026M00718468-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications109
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION49
02/07/2020123857576Open ↗
02/07/2020123857576Open ↗
07/22/2019122962909Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/02/2026M00718468-P1Open ↗
09/02/2026M00718468-I1Open ↗
09/02/2026M00718431-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026M01190431-S2Open ↗
09/01/2026M01007462-P2Open ↗
09/01/2026M01007462-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M01190431-S2Open ↗
08/31/2026M08054995-I1Open ↗
08/31/2026M08054995-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/15/2016122757702Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
04/15/2016122757702Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment35
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING9
04/11/2022123869448Open ↗
03/01/2021123869448Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
04/12/2019123869448Open ↗
12/06/2018122962909Open ↗
04/04/2017122678094Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS4
01/16/2018122678094Open ↗
12/18/2017122678094Open ↗
04/18/2016122224495Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
01/08/2018122678094Open ↗
04/18/2016122224495Open ↗
04/11/2016122224495Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes10
02/07/2020123857576Open ↗
06/06/2019123733282Open ↗
04/22/2019123733282Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00301297-I1Open ↗
08/13/2026M00385533-I1Open ↗
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/02/2026M00718468-P1Open ↗
08/31/2026M08054995-I1Open ↗
08/24/2026M01115114-S2Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
02/07/2020123857576Open ↗
04/12/2019123869448Open ↗
11/29/2017122962909Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/20/2019123733282Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
04/23/2018122757702Open ↗
01/08/2018122678094Open ↗
11/03/2016122678094Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/23/2018122757702Open ↗
01/08/2018122678094Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
05/25/2018123147111Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/03/2022123869448Open ↗
05/03/2022123869448Open ↗
01/24/2022103368204Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs48
▸BISLANDMARKS APPROVAL23
02/07/2020123857576Open ↗
02/07/2020123857576Open ↗
10/07/2019123733282Open ↗
Showing 3 of 23 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
05/04/2022123869448Open ↗
01/25/2022103368204Open ↗
07/02/2021103500098Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/18/2021123857576Open ↗
04/18/2016122224495Open ↗
▸BISLANDMARKS SIGNOFF2
05/03/2022123869448Open ↗
03/17/2021123857576Open ↗
▸BISSHED LETTER1
06/14/2016140362541Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M00385533-I1Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT37
05/03/2022123869448Open ↗
05/03/2022123869448Open ↗
11/11/2021103368204Open ↗
Showing 3 of 37 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms45
▸BISADDITIONAL INFORMATION19
05/04/2021123733282Open ↗
03/15/2021123869448Open ↗
01/08/2021123857576Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET16
02/07/2020123857576Open ↗
04/22/2019123733282Open ↗
04/12/2019123869448Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM7
07/22/2019122962909Open ↗
06/11/2019101296508Open ↗
12/06/2018122962909Open ↗
Showing 3 of 7 on file for this type
▸BISeFiling Job Application Cover Sheet3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents15
▸DOB NOWProof of Historic Building6
09/02/2026M00718468-P1Open ↗
08/15/2026M00718431-I1Open ↗
08/14/2026M00718468-I1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
03/15/2021123869448Open ↗
06/06/2019123733282Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
08/27/2026M01007462-I1Open ↗
08/13/2026M01007462-P2Open ↗
08/13/2026M01007462-P1Open ↗
▸DOB NOWCalculations3
08/27/2026M01007462-I1Open ↗
08/13/2026M01007462-P1Open ↗
08/13/2026M01007462-P2Open ↗