← Back
BuildNYC
Elevator apt, semi-fireproof without stores
955 WALTON AVENUE
BRONX · BIN 2002916
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R8Zoning
107,500 sfGross Floor Area
68Units
LL97 CoveredRent Stabilized110 Active Violations 108 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: DBPB Holding · 25,090 sf lot · 4.28 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Unit 6A, Unit 6B
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarSkyc Management4p · 2 filings · 14 docs
Filed — no permit issued1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DBPB Holding1803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company210/10/2022
Rise Architecture105/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates203/21/2026
New York & Company403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Big Apple Fire SprinklerFire Protection103/21/2026
BR RestorationGeneral Contractor103/21/2026
Colgate Scaffolding EquipmentGeneral Contractor103/21/2026
Odyssia Global CommunicationGeneral Contractor103/21/2026
Bauer MechancialPlumbing107/08/2026
Alan E. RosenbergPlumbing112/13/2011
Big Apple CompactorGeneral Contractor102/28/2008
Certified ContractingGeneral Contractor205/14/2003
Northcoast PCS CommunicationsGeneral Contractor112/24/2001
Senid Plumbing and HeatingPlumbing105/28/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851110/10/2022
Sia Inspections7306105/11/2021
Building Lifecycle
10/08/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/02/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INNER GLASS PANE AT UPPER WINDOW SASH AT 1ST WINDOW FROM SOUTH AT WEST IN THE…
HPD violation · open
09/02/2026
§ 27-2005 HMC: REFIT LOWER WINDOW FRAME AT 2ND WINDOW FROM SOUTH AT WEST IN THE 1st ROOM FROM NORTH LOCATED AT APT 6I UPPER LEVEL, 6th STORY, 2nd…
HPD violation · open
09/02/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
08/13/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM…
HPD violation · open
228 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMidwood-Raftery Plumbing & Heating06/19/2023
DOB NOWBoiler EquipmentSigned-offG. Bauer10/26/2022
BISOTISSUEDBR Restoration04/09/2018
BISPLISSUEDAlan E. Rosenberg12/13/2011
BISPLISSUEDSenid PL & Heating05/28/2008
BISOTISSUEDBig Apple Compactor02/28/2008
BISSPISSUEDBig Apple Fire Sprinkler Co I02/15/2008
BISOTISSUEDOdyssia Global Commercial01/20/2004
BISOTISSUEDCertified Contracting05/14/2003
BISEQRE-ISSUEDColgate Scaffolding & Equipment04/22/2003
BISOTISSUEDCertified Contracting11/08/2002
BISOTISSUEDNorthcoast PCS Communications12/24/2001
1 project · most recent 10/10/2022
Gas
FiledStatusContractorScope
10/10/2022Permit IssuedBauer MechancialGas
2 projects · most recent 09/12/2022
Boiler Controls
FiledStatusContractorScope
09/12/2022Permit IssuedCounty Electrical Contractor IBoiler Controls
01/31/2020Permit IssuedR.C.M. Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/27/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/10/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/10/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/10/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/10/2022Maintenance informationLOUIS ARENAenergy_progress
09/12/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
09/12/2022Heating SystemsLOUIS ARENAspecial
09/12/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
05/10/2021Interior lighting powerJEFF AKERMANenergy_progress
05/03/2021Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
05/03/2021Lighting in dwelling unitsJEFF AKERMANenergy_progress
05/03/2021Electrical motors and elevatorsJEFF AKERMANenergy_progress
05/03/2021Fire-Resistance Rated ConstructionJEFF AKERMANprogress
05/03/2021Energy Code Compliance InspectionsJEFF AKERMANprogress
05/03/2021Post-installed AnchorsSOFIA KAPELYANspecial
05/03/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
87 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account