Two family frame
957 IONIA AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5084877
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
2,189 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,200 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WOODROW PLAZA LLC 21307/08/2026
PINA DEVELOPMENT703/22/2026
BLOCK 69191003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANNA & LOCCISANO ARCHITECTS, PC809/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PINA DEVELOPEMENT LLCGeneral Contractor1207/08/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738609/08/2022
ROGERS CALVANICO GROUP PL1324107/26/2021
Building Lifecycle
All (58)Filed (8)Permit Issued (7)Signed Off (3)Violation (1)Inspection (9)Special Inspection (30)
03/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/14/2022
Signed off — Alteration
INSTALLATION OF AN 8'-0" HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE INSIDE PROPERTY LINE
S00444434-I1
09/08/2022
Filed — New Building
NEW BUILDING APPLICATION FOR THREE-STORY, TWO FAMILY DETACHED RESIDENCE W/ATTACHED ONE CAR GARAGE AND (2)8'-6"x18'-0" PARKING PADS. POST APPROVAL AMENDMENT FILED TO SHOW REVISED PLANS AND SCHEDULE A.
S00504025-P2
09/01/2022
Signed off — Alteration
INSTALLATION OF A NEW 18'-0" CURB CUT INCLUDING (2)18" SPLAYS
S00453521-I1
08/31/2022
Signed off — Alteration
S00503365-I1
08/31/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/31/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/16/2022
Filed — New Building
NEW BUILDING APPLICATION FOR THREE-STORY, TWO FAMILY DETACHED RESIDENCE W/ATTACHED ONE CAR GARAGE AND (2)8'-6"x18'-0" PARKING PADS. POST APPROVAL AMENDMENT FILED TO SHOW REVISED PLANS AND SCHEDULE A.
S00504025-P1
08/05/2022
Filed — Alteration
S00503365-P2
08/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
08/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
08/04/2022
Special inspection requirement — Maintenance information
anthony santoro
08/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
08/04/2022
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
08/04/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
08/04/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
06/08/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/20/2022
Permit issued — Foundation
S00504025-I1-GC-CX
05/20/2022
Permit issued — Construction Fence
S00444434-I1-FN
05/20/2022
Permit issued — Curb Cut
S00453521-I1-CC
03/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/22/2022
Special inspection requirement — Metering
anthony santoro
03/22/2022
Special inspection requirement — Fenestration areas
anthony santoro
03/22/2022
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
03/22/2022
Special inspection requirement — Insulation placement and R values
anthony santoro
03/22/2022
Special inspection requirement — Permanent certificate
anthony santoro
03/22/2022
Special inspection requirement — Fireplaces
anthony santoro
03/22/2022
Special inspection requirement — Interior lighting power
anthony santoro
03/22/2022
Special inspection requirement — Fenestration air leakage
anthony santoro
03/22/2022
Special inspection requirement — Ventilation and air distribution system
anthony santoro
03/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/22/2022
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
03/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/22/2022
Special inspection requirement — Mechanical Systems
anthony santoro
03/22/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
03/22/2022
Special inspection requirement — Structural Steel - Details
anthony santoro
03/22/2022
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
03/22/2022
Special inspection requirement — Subgrade Inspections
anthony santoro
03/22/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/22/2022
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/22/2022
Special inspection requirement — Final
anthony santoro
03/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
03/22/2022
Special inspection requirement — Footing and Foundation
anthony santoro
03/18/2022
Filed — Alteration
S00503365-P1
03/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2022
Violation issued (ECB, closed)
Construction
12/20/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/15/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/28/2021
Permit issued — Plumbing
S00503365-I1-PL
07/26/2021
Filed — Alteration
S00503365-I1
07/02/2021
Permit issued — Foundation
S00504025-I1-GC-CX
06/14/2021
Filed — Alteration
INSTALLATION OF A NEW 18'-0" CURB CUT INCLUDING (2)18" SPLAYS
S00453521-I1
05/03/2021
Permit issued — Construction Fence
S00444434-I1-FN
04/23/2021
Filed — New Building
NEW BUILDING APPLICATION FOR THREE-STORY, TWO FAMILY DETACHED RESIDENCE W/ATTACHED ONE CAR GARAGE AND (2)8'-6"x18'-0" PARKING PADS. POST APPROVAL AMENDMENT FILED TO SHOW REVISED PLANS AND SCHEDULE A.
S00504025-I1
03/31/2021
Permit issued — Construction Fence
S00444434-I1-FN
01/18/2021
Filed — Alteration
INSTALLATION OF AN 8'-0" HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE INSIDE PROPERTY LINE
S00444434-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedPINA DEVELOPEMENT LLC05/20/2022
DOB NOWConstruction FenceSigned-offPINA DEVELOPEMENT LLC05/20/2022
DOB NOWCurb CutSigned-offPINA DEVELOPEMENT LLC05/20/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/28/2021
DOB NOWFoundationPermit IssuedPINA DEVELOPEMENT LLC07/02/2021
DOB NOWConstruction FenceSigned-offPINA DEVELOPEMENT LLC05/03/2021
DOB NOWConstruction FenceSigned-offPINA DEVELOPEMENT LLC03/31/2021
BIS—ISSUEDSKEN SERVICES CORP04/14/2021
BIS—ISSUEDSKEN SERVICES CORP04/14/2021
1 project · most recent 09/08/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2022Permit IssuedPINA DEVELOPEMENT LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Rheem B150E75NT 30,000 BTU ×2
RA20 Series 36,000 BTU ×2
Heating
Berko HBB Series 6,000 BTU · Electric Heater ×3
Navien NCB-H 150,000 BTU · Condensing Unit ×1
Ventilation
Broan B150E75NT 150 CFM · Erv ×1
2 projects · most recent 08/09/2022
General Wiring
FiledStatusContractorScope
08/09/2022CompleteLASER LITE ELECT'L INC.General Wiring
04/19/2021CompleteLASER LITE ELECT'L INC.1 meters, 1 new_meters
1 project · most recent 09/08/2022
Steel Wood
FiledStatusContractorScope
09/08/2022Permit IssuedPINA DEVELOPEMENT LLCSteel, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/31/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/31/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/08/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2021Pass-Final PL - UndergroundPassView ↗
11/15/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
08/04/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
08/04/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/04/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/04/2022Maintenance informationanthony santoroenergy_progress
08/04/2022HVAC-R and service water heating equipmentanthony santoroenergy_progress
08/04/2022Energy Code Compliance Inspectionsanthony santoroprogress
08/04/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
08/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
03/22/2022Meteringanthony santoroenergy_progress
03/22/2022Fenestration areasanthony santoroenergy_progress
03/22/2022Duct leakage testing, insulation and designanthony santoroenergy_progress
03/22/2022Insulation placement and R valuesanthony santoroenergy_progress
03/22/2022Permanent certificateanthony santoroenergy_progress
03/22/2022Fireplacesanthony santoroenergy_progress
03/22/2022Interior lighting poweranthony santoroenergy_progress
03/22/2022Fenestration air leakageanthony santoroenergy_progress
03/22/2022Ventilation and air distribution systemanthony santoroenergy_progress
03/22/2022HVAC-R and service water heating equipmentanthony santoroenergy_progress
03/22/2022Concrete - Cast-In-Placeanthony santorospecial
03/22/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
03/22/2022Mechanical Systemsanthony santorospecial
03/22/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
03/22/2022Structural Steel - Detailsanthony santorospecial
03/22/2022Structural Steel - High Strength Boltinganthony santorospecial
03/22/2022Subgrade Inspectionsanthony santorospecial
Latest 25 of 46.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/24/2026S00503365-P1Request digital key ↗
08/24/2026S00503365-I1Request digital key ↗
08/24/2026S00503365-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026S00444434-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/25/2026S00453521-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION8
03/09/2021520461713Open ↗
12/21/2020520460787Open ↗
12/21/2020520460867Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION2
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/07/2020520332248Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00504025-I1Open ↗
08/13/2026S00504025-P1Open ↗
08/13/2026S00504025-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00504025-I1Open ↗
08/13/2026S00504025-P2Open ↗
08/13/2026S00504025-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/25/2020520460787Open ↗
06/26/2020520332248Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00504025-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026S00504025-P1Open ↗
09/02/2026S00504025-P1Open ↗
09/02/2026S00504025-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00453521-I1Open ↗
08/24/2026S00503365-P1Open ↗
08/24/2026S00503365-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026S00504025-P1Open ↗
09/02/2026S00504025-P1Open ↗
09/02/2026S00504025-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment11
▸BISELECTRIC CUT-OFF3
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
04/14/2021520460867Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00504025-I1Open ↗
08/13/2026S00504025-P1Open ↗
08/13/2026S00504025-P2Open ↗
▸BISGAS CUT-OFF2
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
04/14/2021520460867Open ↗
▸BISSEWER CUT-OFF1
04/14/2021520461713Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00504025-I1—
▸Safety & Tenant Protection12
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
04/14/2021520461713Open ↗
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist3
08/13/2026S00504025-I1Open ↗
08/13/2026S00504025-P1Open ↗
08/13/2026S00504025-P2Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
03/09/2021520461713Open ↗
12/21/2020520460867Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00504025-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00504025-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00504025-I1Open ↗
▸Environmental & Asbestos3
▸BISRODENT CONTROL2
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/21/2020520460867Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00504025-I1Open ↗
08/13/2026S00503365-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00504025-I1Open ↗
08/13/2026S00504025-P1Open ↗
08/13/2026S00504025-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00504025-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00504025-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/14/2021520461713Open ↗
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
▸BISLANDMARKS APPROVAL2
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/21/2020520460867Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM5
04/14/2021520461713Open ↗
04/14/2021520460867Open ↗
03/09/2021520461713Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
03/09/2021520461713Open ↗
12/21/2020520460867Open ↗
11/19/2020520460787Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00504025-P2Open ↗
08/13/2026S00504025-I1Open ↗
08/13/2026S00504025-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/07/2020520332248Open ↗
▸BISPLOT DIAGRAM1
11/25/2020520460787Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00504025-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00504025-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00504025-I1Open ↗