← Back
BuildNYC
Two family converted from one family
96-05 LIBERTY AVENUE
QUEENS · Ozone Park · BIN 4189623
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R4-1Zoning
1,346 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · 2,500 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 15p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edward C. Hicks RA109/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ace-NYC Zoning and Code Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M. Bonilla Landscapingspecialty_contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Edward C. Hicks RA1403109/26/2024
Building Lifecycle
12/31/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q01115096-I1-GC
05/30/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/27/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/16/2025
Permit issued — General Construction
Q01115096-I1-GC
09/26/2024
Filed — Alteration
New Non-Bearing Partition, New Ceiling Finishes, and New Flood Finishes. Existing Mechanical Roll down gate. Removal of ECB Violations 391-24202X, 391-212-63X, 391-241-96Z. No Change in Egress Occupancy or use.
Q01115096-I1
32 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedM. Bonilla Landscaping05/16/2025
BISBLISSUEDJack Piccini10/16/2003
3 projects · most recent 09/23/2024
General Wiring
FiledStatusContractorScope
09/23/2024CompleteHV ElectricGeneral Wiring
09/23/2024CompleteHV ElectricGeneral Wiring
01/31/2018CompleteElectrotec of NY Electrical—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/30/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/27/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/24/2024Fire-Resistant Penetrations and JointsEDWARD HICKSspecial
09/24/2024Energy Code Compliance InspectionsEDWARD HICKSprogress
09/24/2024Fire-Resistance Rated ConstructionEDWARD HICKSprogress
5 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account