ECB06/24/2026Atoi observed at exp 1 4 rolldown metal gates attached to overhang structure. Based on public records gates installed betwen 2018 and 2020. New gates relocated apx 4 feet in front of the building onto public siNothing owed — awaiting certificate of correction
Predominantly retail with other uses · Owner of record: AJ Richard & Sons · 0.98 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (3)Violation (3)
06/24/2026
Atoi observed at exp 1 4 rolldown metal gates attached to overhang structure. Based on public records gates installed betwen 2018 and 2020. New…
ECB violation · open
08/11/2025
FES-25-01: Failed to provide and/or maintain at premises a record for inspection, testing, and maintenance of special hazard fire extinguishing…
FDNY_ORDER violation · closed
08/11/2025
FES-05-01: Failed to install special hazard fire extinguishing system conforming with the Fire Department-approved design and installation…