← Back
QUEENS
96-11 ALBERT ROAD
QUEENS · BIN 4816264
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHAABAN ENGINEERING, LLC210/28/2021
AKRF ENGINEERING, P.C.206/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R MANETTA203/21/2026
SMB CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GALVIN BROTHERS INCGeneral Contractor603/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKRF, INC.4728106/10/2021
UNIVERSAL TESTING AND INS400206/10/2021
Building Lifecycle
All (22)Filed (4)Permit Issued (3)Signed Off (3)Inspection (3)Objection (5)Special Inspection (4)
03/31/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT AT CENTREVILLE PLAYGROUND AS INDICATED ON PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY
Q00615175-I1
03/11/2022
Signed off — Alteration
PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE RETENTION) PER DEP ON-SITE PUBLIC PROPERTY GREEN INFRASTRUCTURE RETROFIT CONTACT, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00509976-I1
03/11/2022
Signed off — Alteration
INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE RETENTION) PER DEP ON-SITE PUBLIC PROPERTY GREEN INFRASTRUCTURE RETROFIT CONTRACT, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00509972-I1
12/08/2021
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/03/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/03/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/03/2021
Permit issued — Construction Fence
Q00615175-I1-FN
10/28/2021
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT AT CENTREVILLE PLAYGROUND AS INDICATED ON PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY
Q00615175-I1
10/19/2021
Special inspection requirement — Final
AHMED SHAABAN
10/12/2021
Permit issued — Plumbing
Q00509976-I1-PL
10/07/2021
Objection raised — Structural
10/07/2021
Objection raised — Scope
10/07/2021
Objection raised — Inspections
10/07/2021
Objection raised — Fire_Protection
10/07/2021
Objection raised — Inspections
10/06/2021
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT, FENCE, AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00586042-I1
09/29/2021
Permit issued — General Construction
Q00509972-I1-GC
06/10/2021
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE RETENTION) PER DEP ON-SITE PUBLIC PROPERTY GREEN INFRASTRUCTURE RETROFIT CONTACT, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00509976-I1
06/10/2021
Filed — Alteration
INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE RETENTION) PER DEP ON-SITE PUBLIC PROPERTY GREEN INFRASTRUCTURE RETROFIT CONTRACT, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00509972-I1
04/28/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
GARY MARCUS
04/25/2021
Special inspection requirement — Subgrade Inspections
KATHLEEN HAND
04/25/2021
Special inspection requirement — Final
WENDY HO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offGALVIN BROTHERS INC11/03/2021
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC10/12/2021
DOB NOWGeneral ConstructionSigned-offGALVIN BROTHERS INC09/29/2021
1 project · most recent 10/06/2021
Fence
FiledStatusContractorScope
10/06/2021——Fence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/08/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/03/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/03/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/19/2021FinalAHMED SHAABANprogress
04/28/2021Subsurface Investigations (Borings/Test Pits)GARY MARCUSspecial
04/25/2021Subgrade InspectionsKATHLEEN HANDspecial
04/25/2021FinalWENDY HOprogress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00509972-I1Request digital key ↗
08/27/2026Q00509976-I1Request digital key ↗
08/27/2026Q00615175-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00509972-I1Open ↗
08/13/2026Q00586042-I1Open ↗
08/13/2026Q00615175-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q00509972-I1Open ↗
08/23/2026Q00615175-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00509972-I1Open ↗
08/25/2026Q00509972-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00509972-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00509972-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00509972-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026Q00509972-I1Open ↗
08/13/2026Q00509976-I1Open ↗
08/13/2026Q00586042-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026Q00509976-I1Open ↗
08/13/2026Q00509972-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026Q00509972-I1Open ↗
08/13/2026Q00509976-I1Open ↗