ECB09/09/2024During the inspection, it was noted that electrical work associated with the motorized roll-up gate at exposure one was performed without the necessary permits., obtain all permitsNothing owed β awaiting certificate of correction
ECB09/01/2008Work w/o a permit.noted: @ 1ST fl commercial space a gut reno of interior w/ removal of suspended ceiling and partitions,new ceiling installed w/o a permit,electrical & plumbing w/o permit @ time of inspectionNothing owed β awaiting certificate of correction
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
12/17/2025
Boiler inspection report filed
Subsequent Β· no defects Β· Accepted
11/07/2025
Boiler inspection report filed
Initial Β· defects found Β· Accepted
11/01/2024
Boiler inspection report filed
Initial Β· no defects Β· Accepted
09/09/2024
During the inspection, it was noted that electrical work associated with the motorized roll-up gate at exposure one was performed without theβ¦
ECB violation Β· open
12/15/2023
Boiler inspection report filed
Subsequent Β· no defects Β· Accepted
35 history events on file for this building. Sign in free to see the full history. Sign in Β· Create account