← Back
Two stories - detached, small or mid-size
96-15 72 ROAD
QUEENS · BIN 4095488
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
1,236 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two stories - detached, small or mid-size · 3,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BNM HOLDINGS1207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/30/2023$900K—Private party → Private party$728/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOYUN KIM; RA203/25/2024
JBA101/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor407/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415203/25/2024
Building Lifecycle
All (67)Filed (3)Permit Issued (3)Signed Off (3)Violation (2)Inspection (5)Objection (30)Special Inspection (21)
01/16/2026
Violation issued (ECB, closed)
Construction
01/16/2026
Violation issued (ECB, open)
Construction
12/24/2024
Signed off — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NEW ENLARGEMENT AT FRONT. NO CHANGE IN USE, OCCUPANCY OR EGRESS TO EXISTING 2.5 STORY 1 FAMILY DWELLING
Q00982164-I1
08/14/2024
Signed off — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NEW ENLARGEMENT AT FRONT. NO CHANGE IN USE, OCCUPANCY OR EGRESS TO EXISTING 2.5 STORY 1 FAMILY DWELLING
Q00982164-S1
07/31/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/23/2024
Signed off — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NEW ENLARGEMENT AT FRONT. NO CHANGE IN USE, OCCUPANCY OR EGRESS TO EXISTING 2.5 STORY 1 FAMILY DWELLING
Q00982164-S2
07/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/04/2024
Permit issued — Plumbing
Q00982164-S1-PL
04/01/2024
Permit issued — Foundation
Q00982164-I1-GC-CX
03/25/2024
Filed — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NEW ENLARGEMENT AT FRONT. NO CHANGE IN USE, OCCUPANCY OR EGRESS TO EXISTING 2.5 STORY 1 FAMILY DWELLING
Q00982164-S1
03/22/2024
Permit issued — Construction Fence
Q00982164-S2-FN
03/14/2024
Objection resolved — Addressed
03/13/2024
Objection raised — Other
03/13/2024
Objection resolved — Addressed
03/13/2024
Objection resolved — Addressed
03/08/2024
Objection resolved — Addressed
03/07/2024
Objection raised — Other
03/07/2024
Objection raised — Scope
03/04/2024
Filed — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NEW ENLARGEMENT AT FRONT. NO CHANGE IN USE, OCCUPANCY OR EGRESS TO EXISTING 2.5 STORY 1 FAMILY DWELLING
Q00982164-S2
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
03/01/2024
Objection raised — Structural
03/01/2024
Objection raised — Other
03/01/2024
Objection resolved — Addressed
03/01/2024
Objection raised — Structural
03/01/2024
Objection raised — Structural
03/01/2024
Objection raised — Structural
03/01/2024
Objection resolved — Addressed
03/01/2024
Objection resolved — Addressed
02/16/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
02/02/2024
Objection raised — Other
01/18/2024
Filed — Alteration
HEREWITH TO PROPOSE TO RELAMINATE EXISTING WALLS, NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NEW ENLARGEMENT AT FRONT. NO CHANGE IN USE, OCCUPANCY OR EGRESS TO EXISTING 2.5 STORY 1 FAMILY DWELLING
Q00982164-I1
01/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JEFFREY BELL
01/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DOYUN KIM
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
01/12/2024
Special inspection requirement — Structural Cold-Formed Steel
DOYUN KIM
01/12/2024
Special inspection requirement — Permanent certificate
JEFFREY BELL
01/12/2024
Special inspection requirement — Lighting controls
JEFFREY BELL
01/12/2024
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
01/12/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
01/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
01/12/2024
Special inspection requirement — Fenestration areas
JEFFREY BELL
01/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
01/12/2024
Special inspection requirement — Lighting in dwelling units
JEFFREY BELL
01/12/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
01/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC04/04/2024
DOB NOWFoundationSigned-offNYC BUILDING SOLUTIONS CO04/01/2024
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO03/22/2024
1 project · most recent 04/24/2024
General Wiring
FiledStatusContractorScope
04/24/2024CompleteK.A.B. ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/12/2024Fenestration and door U-factor and product ratingsJEFFREY BELLenergy_progress
01/12/2024Excavations - Sheeting, Shoring, and BracingDOYUN KIMspecial
01/12/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
01/12/2024Structural Cold-Formed SteelDOYUN KIMspecial
01/12/2024Permanent certificateJEFFREY BELLenergy_progress
01/12/2024Lighting controlsJEFFREY BELLenergy_progress
01/12/2024Concrete - Cast-In-PlaceDOYUN KIMspecial
01/12/2024Energy Code Compliance InspectionsDOYUN KIMprogress
01/12/2024Fire-Resistance Rated ConstructionDOYUN KIMprogress
01/12/2024Fenestration areasJEFFREY BELLenergy_progress
01/12/2024HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
01/12/2024Lighting in dwelling unitsJEFFREY BELLenergy_progress
01/12/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
01/12/2024HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
01/12/2024Interior lighting powerJEFFREY BELLenergy_progress
01/12/2024Maintenance informationJEFFREY BELLenergy_progress
01/12/2024HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
01/12/2024Fenestration air leakageJEFFREY BELLenergy_progress
01/11/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
12/26/2023FinalJEFFREY BELLprogress
12/26/2023Footing and FoundationDOYUN KIMprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00982164-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q00982164-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00982164-S2Open ↗
08/13/2026Q00982164-S1Open ↗
08/13/2026Q00982164-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q00982164-I1Open ↗
08/23/2026Q00982164-I1Open ↗
08/23/2026Q00982164-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q00982164-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00982164-I1Open ↗
08/13/2026Q00982164-S1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00982164-I1Open ↗
▸Other Documents5
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00982164-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q00982164-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00982164-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026Q00982164-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00982164-I1Open ↗