Auto body / collision or auto repair
96-18 NORTHERN BOULEVARD
QUEENS · BIN 4437211
💬 Discuss this project
1930Year Built
3Stories
G2Building Class
R6AZoning
9,540 sfGross Floor Area
2Units
Rent Stabilized38 Open Violations 37 unresolved · 1 paperwork only ▸FDNY Report ↗
Auto body / collision or auto repair · Owner of record: BRUNA REALTY CO INC · 4,600 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivil
Roof10p · 4 filings · 20 docs
Floor 34p · 2 filings · 20 docs
Floor 25p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
1 job · most recent 10/31/2022
FiledStatusContractorScope
10/31/2022Permit IssuedRICHARD NEU—
2 jobs · most recent 07/11/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/11/2023Permit IssuedALPHA SCAFFOLDING INCScaffold
06/07/2021Permit IssuedALPHA SCAFFOLDING INCSidewalk Shed
Building Lifecycle
All (75)Filed (14)Permit Issued (16)Signed Off (4)Violation (7)Objection (4)Special Inspection (30)
10/24/2025
Signed off — Alteration
Provide temporary fence with orange safety netting at roof and Provide structural straping of existing brick facade at 2nd floor and roof.
Q00758375-I1
10/24/2025
Signed off — Alteration
Provide temporary fence with orange safety netting at roof and Provide structural straping of existing brick facade at 2nd floor and roof.
Q00758375-S1
10/24/2025
Signed off — Alteration
GENERAL CONSTRUCTION WORK FILED IN CONJUNCTION WITH STRUCTURAL ALTERATION FILED UNDER DOCUMENT I1.
Q01122063-I1
10/22/2025
Signed off — Alteration
GENERAL CONSTRUCTION WORK FILED IN CONJUNCTION WITH STRUCTURAL ALTERATION FILED UNDER DOCUMENT I1.
Q01122063-S1
10/21/2025
Permit issued — Structural
Q00758375-S1-GC-CX
08/14/2025
Permit issued — General Construction
Q01122063-S1-GC
08/11/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK FILED IN CONJUNCTION WITH STRUCTURAL ALTERATION FILED UNDER DOCUMENT I1.
Q01122063-S1
07/22/2025
Special inspection requirement — Demolition
John Natoli
07/22/2025
Special inspection requirement — Final
John Natoli
07/22/2025
Special inspection requirement — Masonry
John Natoli
07/22/2025
Special inspection requirement — Post-installed Anchors
John Natoli
07/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
07/11/2025
Filed — Alteration
Provide temporary fence with orange safety netting at roof and Provide structural straping of existing brick facade at 2nd floor and roof.
Q00758375-P4
07/11/2025
Special inspection requirement — Final
John Natoli
07/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
07/10/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK FILED IN CONJUNCTION WITH STRUCTURAL ALTERATION FILED UNDER DOCUMENT I1.
Q01122063-P2
07/09/2025
Special inspection requirement — Post-installed Anchors
John Natoli
07/09/2025
Special inspection requirement — Final
John Natoli
07/09/2025
Special inspection requirement — Demolition
John Natoli
07/09/2025
Special inspection requirement — Masonry
John Natoli
07/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
03/24/2025
Permit issued — Sidewalk Shed
Q00526938-I1-SH
02/11/2025
Objection resolved — Addressed
01/31/2025
Objection raised — Other
01/28/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK FILED IN CONJUNCTION WITH STRUCTURAL ALTERATION FILED UNDER DOCUMENT I1.
Q01122063-P1
01/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
01/22/2025
Special inspection requirement — Final
John Natoli
01/22/2025
Special inspection requirement — Masonry
John Natoli
01/22/2025
Special inspection requirement — Post-installed Anchors
John Natoli
01/13/2025
Violation issued (ECB, closed)
Construction
11/14/2024
Permit issued — Structural
Q01122063-I1-ST
11/13/2024
Permit issued — Supported Scaffold
Q00900484-I1-SF
11/06/2024
Permit issued — Supported Scaffold
Q00900484-I1-SF
11/06/2024
Permit issued — Structural
Q00758375-S1-GC-CX
10/08/2024
Filed — Alteration
GENERAL CONSTRUCTION WORK FILED IN CONJUNCTION WITH STRUCTURAL ALTERATION FILED UNDER DOCUMENT I1.
Q01122063-I1
10/02/2024
Filed — Alteration
Provide temporary fence with orange safety netting at roof and Provide structural straping of existing brick facade at 2nd floor and roof.
Q00758375-P3
10/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
10/01/2024
Special inspection requirement — Final
John Natoli
09/04/2024
Permit issued — Sidewalk Shed
Q00526938-I1-SH
07/08/2024
Permit issued — Protection and Mechanical Methods
Q00900862-I1-PMM
09/28/2023
Permit issued — General Construction
Q00758375-S1-GC-CX
09/11/2023
Objection resolved — Addressed
09/09/2023
Objection raised — Admin
09/06/2023
Filed — Alteration
Provide temporary fence with orange safety netting at roof and Provide structural straping of existing brick facade at 2nd floor and roof.
Q00758375-P2
09/05/2023
Special inspection requirement — Final
John Natoli
09/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
08/28/2023
Filed — Alteration
Provide temporary fence with orange safety netting at roof and Provide structural straping of existing brick facade at 2nd floor and roof.
Q00758375-P1
08/28/2023
Special inspection requirement — Structural Steel - Details
John Natoli
08/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
08/28/2023
Special inspection requirement — Final
John Natoli
08/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/11/2023
Filed — Alteration
Provide temporary fence with orange safety netting at roof and Provide structural straping of existing brick facade at 2nd floor and roof.
Q00758375-S1
07/13/2023
Permit issued — Supported Scaffold
Q00900484-I1-SF
07/11/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00900484-I1
07/11/2023
Permit issued — Protection and Mechanical Methods
Q00900862-I1-PMM
07/08/2023
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
Q00900862-I1
07/03/2023
Permit issued — General Construction
Q00758375-I1-GC-CX
05/24/2023
Permit issued — Sidewalk Shed
Q00526938-I1-SH
Latest 60 of 75 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIERA CONTRACTING2707/08/2026
CONTRACTING SERVICES RSJ103/22/2026
BRUNA REALTY CO INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSULTING ENGINEER108/11/2025
M JUST ARCHITECTURE PC607/11/2025
STRUCTURAL ENGINEERING INTEGRATED507/10/2025
ENTHINK ENGINEERS LLC207/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY WIDE EXPEDITING1003/21/2026
KX CONSULTING603/21/2026
JUST ARCHITECTURE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIERA CONTRACTING INCGeneral Contractor2007/08/2026
RSJ CONTRACTING SERVICESGeneral Contractor707/08/2026
ALPHA SCAFFOLDING INCGeneral Contractor407/08/2026
RICHARD NEUElectrical103/22/2026
LT PRO CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSULTING ENGINEER50931008/11/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offRSJ CONTRACTING SERVICES10/21/2025
DOB NOWGeneral ConstructionSigned-offRSJ CONTRACTING SERVICES08/14/2025
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC03/24/2025
DOB NOWStructuralSigned-offRSJ CONTRACTING SERVICES11/14/2024
DOB NOWSupported ScaffoldPermit IssuedALPHA SCAFFOLDING INC11/13/2024
DOB NOWSupported ScaffoldPermit IssuedTRIERA CONTRACTING INC11/06/2024
DOB NOWStructuralSigned-offRSJ CONTRACTING SERVICES11/06/2024
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC09/04/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedTRIERA CONTRACTING INC07/08/2024
DOB NOWGeneral ConstructionSigned-offRSJ CONTRACTING SERVICES09/28/2023
DOB NOWSupported ScaffoldPermit IssuedTRIERA CONTRACTING INC07/13/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedTRIERA CONTRACTING INC07/11/2023
DOB NOWGeneral ConstructionSigned-offLT PRO CONSTRUCTION INC07/03/2023
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC05/24/2023
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC05/25/2022
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC05/26/2021
BISOTISSUEDFOUR SEASON AWNING CORP10/27/2003
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/22/2025DemolitionJohn Natolispecial
07/22/2025FinalJohn Natoliprogress
07/22/2025MasonryJohn Natolispecial
07/22/2025Post-installed AnchorsJohn Natolispecial
07/22/2025Structural Stability – Alterations of existing buildingsJohn Natolispecial
07/11/2025FinalJohn Natoliprogress
07/11/2025Structural Stability – Alterations of existing buildingsJohn Natolispecial
07/09/2025Post-installed AnchorsJohn Natolispecial
07/09/2025FinalJohn Natoliprogress
07/09/2025DemolitionJohn Natolispecial
07/09/2025MasonryJohn Natolispecial
07/09/2025Structural Stability – Alterations of existing buildingsJohn Natolispecial
01/22/2025Structural Stability – Alterations of existing buildingsJohn Natolispecial
01/22/2025FinalJohn Natoliprogress
01/22/2025MasonryJohn Natolispecial
01/22/2025Post-installed AnchorsJohn Natolispecial
10/01/2024Structural Stability – Alterations of existing buildingsJohn Natolispecial
10/01/2024FinalJohn Natoliprogress
09/05/2023FinalJohn Natoliprogress
09/05/2023Structural Stability – Alterations of existing buildingsJohn Natolispecial
08/28/2023Structural Steel - DetailsJohn Natolispecial
08/28/2023Structural Stability – Alterations of existing buildingsJohn Natolispecial
08/28/2023FinalJohn Natoliprogress
06/15/2022Fenestration areasJohn Natolienergy_progress
06/15/2022Insulation placement and R valuesJohn Natolienergy_progress
Latest 25 of 34.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026Q00526938-I1Request digital key ↗
08/27/2026Q00526938-P1Request digital key ↗
08/24/2026Q00900862-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026Q00526938-I1Open ↗
08/27/2026Q00526938-P1Open ↗
08/24/2026Q00900862-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/25/2026Q00758375-I1Open ↗
09/02/2026Q01122063-P1Open ↗
09/01/2026Q00758375-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/25/2026Q00758375-I1Open ↗
09/25/2026Q00758375-I1Open ↗
09/02/2026Q01122063-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/24/2026Q00758375-P3Open ↗
08/24/2026Q00758375-P1Open ↗
08/24/2026Q00758375-S1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q01122063-I1Open ↗