💬 Discuss this project
1920Year Built
2.5Stories
C2Building Class
R5BZoning
1,512 sfGross Floor Area
6Units
Rent Stabilized21 Active Violations 14 unresolved · 7 paperwork only 1 old, status unconfirmed ▸
Five to six families · Owner of record: Chartered Holdings · 5,387 sf lot · 0.28 FAR built · Flood zone AE
Locations of Work
StructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Alteration of existing dwelling1 filing · 4 docs
Floor 2Alteration of existing dwelling1 filing · 4 docs
Floor 1Alteration of existing dwelling1 filing · 4 docs
CellarAlteration of existing dwelling1 filing · 4 docs
Filed — no permit issued21p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chartered Properties803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M.S. Savani Architect106/24/2025
Nyron Hall Engineering307/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arcastle203/21/2026
MJB Consultants603/21/2026
Building Lifecycle
All (138)Filed (4)Violation (60)Objection (52)Special Inspection (22)
05/07/2026
Violation issued (HPD, closed)
A
03/27/2026
Objection resolved — Resolved
12/29/2025
Objection raised — Fire_Protection
12/02/2025
Objection resolved — Resolved
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
07/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/22/2025
Objection raised — Zoning
07/14/2025
Objection raised — Structural
07/14/2025
Objection raised — Structural
07/14/2025
Objection raised — Other
07/14/2025
Objection raised — Structural
07/14/2025
Objection raised — Scope
06/24/2025
Filed — Alteration
PROPOSED ALTERATION OF EXISTING 2-1/2 STY BUILDING WITH CELLAR
Q01233794-I1
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/17/2025
Special inspection requirement — Final
06/17/2025
Special inspection requirement — Energy Code Compliance Inspections
06/17/2025
Special inspection requirement — Masonry
06/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/17/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/12/2025
Violation issued (HPD, closed)
A
06/04/2025
Special inspection requirement — Maintenance information
06/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/04/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
06/04/2025
Special inspection requirement — Lowest Floor Elevation
06/04/2025
Special inspection requirement — Protection of exposed foundation insulation
06/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/04/2025
Special inspection requirement — Insulation placement and R values
06/04/2025
Special inspection requirement — Interior lighting power
06/04/2025
Special inspection requirement — Air barrier - visual inspection
06/04/2025
Special inspection requirement — Metering
06/04/2025
Special inspection requirement — Fenestration air leakage
06/04/2025
Special inspection requirement — Permanent certificate
06/04/2025
Special inspection requirement — Fenestration areas
05/07/2024
Objection resolved — Resolved
05/03/2024
Objection raised — Other
04/19/2024
Objection resolved — Resolved
04/19/2024
Objection resolved — Resolved
04/19/2024
Objection resolved — Resolved
04/16/2024
Violation issued (HPD, closed)
A
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
03/22/2024
Objection resolved — Resolved
11/27/2023
Violation issued (HPD, closed)
I
07/19/2023
Objection raised — Accessibility
07/19/2023
Objection raised — Structural
07/19/2023
Objection raised — Structural
07/19/2023
Objection raised — Structural
07/19/2023
Objection raised — Fire_Protection
07/19/2023
Objection raised — Admin
07/19/2023
Objection raised — Mechanical
07/19/2023
Objection raised — Fire_Protection
07/19/2023
Objection raised — Structural
Latest 60 of 138 events.
Nothing on file for this building.
1 project · most recent 05/28/2025
General Wiring
FiledStatusContractorScope
05/28/2025Permit IssuedDennison ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/23/2025Tenant Protection Plan Compliance—special
06/17/2025Fire-Resistant Penetrations and Joints—special
06/17/2025Final—progress
06/17/2025Energy Code Compliance Inspections—progress
06/17/2025Masonry—special
06/17/2025Fire-Resistance Rated Construction—progress
06/17/2025Exterior Insulation and Finish Systems (EIFS)—special
06/04/2025Maintenance information—energy_progress
06/04/2025Structural Stability – Alterations of existing buildings—special
06/04/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
06/04/2025Lowest Floor Elevation—progress
06/04/2025Protection of exposed foundation insulation—energy_progress
06/04/2025Fenestration and door U-factor and product ratings—energy_progress
06/04/2025Insulation placement and R values—energy_progress
06/04/2025Interior lighting power—energy_progress
06/04/2025Air barrier - visual inspection—energy_progress
06/04/2025Metering—energy_progress
06/04/2025Fenestration air leakage—energy_progress
06/04/2025Permanent certificate—energy_progress
06/04/2025Fenestration areas—energy_progress
03/22/2023Demolition—special
03/22/2023Construction Operations Influencing Adjacent Structures—special
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026Q01233794-I1Request digital key ↗
08/15/2026Q00848104-S1Request digital key ↗
08/15/2026Q00848104-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION9
10/20/2020421698354Open ↗
01/06/2020421938023Open ↗
03/07/2019421698354Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
01/06/2020421938023Open ↗
▸DOB NOWFlood Zone Design Certification1
08/14/2026Q00101943-I1Open ↗
▸DOB NOWFlood Zone Compliance1
08/14/2026Q00101943-I1Open ↗
▸Seals & Professional Certifications9
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
01/06/2020421938023Open ↗
01/06/2020421938023Open ↗
01/06/2020421938023Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00101943-I1Open ↗
08/19/2026Q01233794-I1Open ↗
08/13/2026Q00848104-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
07/08/2009410211293Open ↗
07/08/2009410211284Open ↗
▸Safety & Tenant Protection4
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist3
08/13/2026Q01233794-I1Open ↗
08/13/2026Q00848104-I1Open ↗
08/13/2026Q00848104-S1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/19/2014421061914Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/08/2009410211293Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00848104-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01233794-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/06/2020421938023Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/06/2020421938023Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
12/19/2014421061914Open ↗
06/19/2009410211284Open ↗
06/17/2009410211293Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/20/2020421698354Open ↗
01/06/2020421938023Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
01/06/2020421938023Open ↗
11/26/2018421698354Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/08/2009410211293Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
01/06/2020421938023Open ↗
11/26/2018421698354Open ↗
12/19/2014421061914Open ↗
▸BISBOROUGH INTAKE FORM2
04/23/2018421061914Open ↗
03/09/2018421061914Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM2
01/06/2020421938023Open ↗
11/26/2018421698354Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
01/06/2020421938023Open ↗
▸BISSupporting Document: Fee Deferment1
08/25/2016402612151Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00848104-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00848104-I1Open ↗