← Back
Predominantly retail with other uses
96-27 ATLANTIC AVENUE
QUEENS · Woodhaven · BIN 4186609
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
C8-1Zoning
5,600 sfGross Floor Area
7Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 9627 LLC · 7,500 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Floor 11p · 1 filing · 7 docs
Cellar1p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
9627 LLC603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLUSHING ENGINEERING SERVICE PC107/29/2024
JSPCLLC203/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M2 DESIGN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K & BH PLUMBING & HTG INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373307/29/2024
Building Lifecycle
All (68)Filed (3)Permit Issued (3)Signed Off (3)Violation (29)Inspection (6)Objection (18)Special Inspection (6)
12/11/2024
Signed off — Alteration
INSTALL& REMOVE ONE GAS CEILING HEATER IN THE REAR OF 1ST FL TO DISMISS VIOLATION #35198626X. CAP & REMOVE ONE ILLEGAL GAS BOILER IN CEL. TO DISMISS VIOALATION# 39093517L. ALL THE BOILER WORK FILE UNDER BL#Q00938950,NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01080710-I1
11/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/29/2024
Permit issued — Plumbing
Q01080710-I1-PL
08/23/2024
Objection resolved — Addressed
08/06/2024
Objection raised — Other
07/29/2024
Filed — Alteration
INSTALL& REMOVE ONE GAS CEILING HEATER IN THE REAR OF 1ST FL TO DISMISS VIOLATION #35198626X. CAP & REMOVE ONE ILLEGAL GAS BOILER IN CEL. TO DISMISS VIOALATION# 39093517L. ALL THE BOILER WORK FILE UNDER BL#Q00938950,NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01080710-I1
07/17/2024
Signed off — Alteration
CAP& REMOVE PEERLESS BOILER (FOR THE STORE) MODEL ML-03 OUTPUT 58,000BTU TO DISMISS VIOLATION#39093517L AND REPLACE 1 GAS BOILER FOR EXISTING 2ND FLOOR APT. NO CHANGE IN USE, (CO#400381136:),OCCUPANCY OR EGRESS.
Q00938950-S1
07/17/2024
Signed off — Alteration
CAP& REMOVE PEERLESS BOILER (FOR THE STORE) MODEL ML-03 OUTPUT 58,000BTU TO DISMISS VIOLATION#39093517L AND REPLACE 1 GAS BOILER FOR EXISTING 2ND FLOOR APT. NO CHANGE IN USE, (CO#400381136:),OCCUPANCY OR EGRESS.
Q00938950-I1
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
07/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
07/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
07/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
07/15/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/11/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/08/2024
Permit issued — Boiler Equipment
Q00938950-S1-BE
03/18/2024
Objection raised — Other
03/18/2024
Objection resolved — Addressed
03/18/2024
Objection raised — Other
03/18/2024
Objection resolved — Addressed
03/09/2024
Filed — Alteration
CAP& REMOVE PEERLESS BOILER (FOR THE STORE) MODEL ML-03 OUTPUT 58,000BTU TO DISMISS VIOLATION#39093517L AND REPLACE 1 GAS BOILER FOR EXISTING 2ND FLOOR APT. NO CHANGE IN USE, (CO#400381136:),OCCUPANCY OR EGRESS.
Q00938950-S1
02/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
KY FU
11/24/2023
Permit issued — Boiler Equipment
Q00938950-I1-BE
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/10/2023
Objection raised — Other
10/10/2023
Objection raised — Other
10/10/2023
Objection raised — Structural
10/10/2023
Objection raised — Scope
10/10/2023
Objection raised — Fire_Protection
10/10/2023
Objection raised — Other
09/27/2023
Filed — Alteration
CAP& REMOVE PEERLESS BOILER (FOR THE STORE) MODEL ML-03 OUTPUT 58,000BTU TO DISMISS VIOLATION#39093517L AND REPLACE 1 GAS BOILER FOR EXISTING 2ND FLOOR APT. NO CHANGE IN USE, (CO#400381136:),OCCUPANCY OR EGRESS.
Q00938950-I1
09/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
KY FU
08/28/2023
Violation issued (ECB, closed)
Construction
08/28/2023
Violation issued (ECB, closed)
Boilers
08/28/2023
Violation issued (ECB, closed)
Boilers
08/28/2023
Violation issued (ECB, closed)
Boilers
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/17/2022
Violation issued (HPD, closed)
I
11/27/2016
Violation issued (ECB, closed)
Construction
10/19/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/02/2016
Violation issued (ECB, closed)
Construction
10/02/2016
Violation issued (ECB, closed)
Construction
09/21/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2016
Violation issued (ECB, closed)
Construction
07/22/2016
Violation issued (ECB, closed)
Construction
06/22/2016
Violation issued (ECB, closed)
Construction
02/08/2012
Violation issued (HPD, closed)
I
01/10/2012
Violation issued (HPD, closed)
B
01/10/2012
Violation issued (HPD, closed)
B
01/10/2012
Violation issued (HPD, closed)
B
01/10/2012
Violation issued (HPD, closed)
B
01/10/2012
Violation issued (HPD, closed)
B
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offK & BH PLUMBING & HTG INC09/29/2024
DOB NOWBoiler EquipmentSigned-offK & BH PLUMBING & HTG INC07/08/2024
DOB NOWBoiler EquipmentSigned-offK & BH PLUMBING & HTG INC11/24/2023
BISSPISSUEDJD MASTERS PLBG & HTG05/25/1995
BISPLISSUEDJD MASTERS PLBG & HTG05/25/1995
BISOTISSUEDULITMATE LAUNDRY CORP05/16/1995
BISPLISSUEDC.A.A. MECH.LTD04/18/1995
BISFPISSUEDIDEAL FIRE CONTROL01/31/1995
BISOTISSUEDTECHNO CONST. CO11/15/1994
BIS—ISSUEDPAL MASONRY INC09/30/1994
BISPLISSUEDC.A.A. MECH.LTD06/21/1994
BIS—ISSUEDPAL MASONRY INC03/01/1994
BISEQISSUEDPAL MASONARY INC02/15/1994
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2024Pass-Final Boiler Equipment InspectionPassView ↗
07/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/17/2024Fire-Resistant Penetrations and JointsKY FUspecial
07/17/2024HVAC-R and service water heating equipmentKY FUenergy_progress
07/17/2024HVAC-R and service water heating system controlsKY FUenergy_progress
07/17/2024HVAC-R and service water piping design and insulationKY FUenergy_progress
02/22/2024Tenant Protection Plan ComplianceKY FUspecial
09/27/2023Tenant Protection Plan ComplianceKY FUspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026Q00938950-I1Request digital key ↗
08/24/2026Q00938950-S1Request digital key ↗
08/21/2026Q01080710-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01080710-I1Open ↗
08/13/2026Q00938950-I1Open ↗
08/13/2026Q00938950-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/22/2026Q01080710-I1Open ↗
09/22/2026Q01080710-I1Open ↗
09/22/2026Q01080710-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026Q00938950-S1Open ↗
09/22/2026Q01080710-I1Open ↗
09/17/2026Q00938950-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q01080710-I1Open ↗
08/13/2026Q00938950-I1Open ↗
08/13/2026Q00938950-S1Open ↗