← Back
BuildNYC
Multi-story retail building (2+)
96 EAST 170TH STREET
BRONX · BIN 2008083
💬 Discuss this project
2001Year Built
3Stories
K2Building Class
R8AZoning
41,201 sfGross Floor Area
4Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only 2 likely answered 4 old, status unconfirmed ▸
Multi-story retail building (2+) · Owner of record: Saxony Realty Associates · 12,447 sf lot · 3.31 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSaxony Realty Assoc LLC8p · 1 filing · 13 docs
Floor 2Structural-Elevator shaft1 filing · 3 docs
Floor 1Saxony Realty Assoc LLC10p · 3 filings · 20 docs
CellarStructural-Elevator shaft1 filing · 3 docs
Site & exteriorSaxony Realty Assoc LLC2p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Saxony Realty Associates5009/22/2026
Kidstown1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJ Engineering & Design109/23/2026
Build Tech Architects109/16/2026
PKSB Architects108/21/2026
Merritt Engineering Consultants202/21/2023
Shaaban Engineering204/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kazam Consultants403/21/2026
Merritt Engineering Consultant403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
National MaintenanceSign hanger207/08/2026
E-J Electric Installation CoElectrical103/21/2026
E-J Electric Installation CoElectrical103/22/2026
Performance MechancialGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildtech Engineering6369109/16/2026
Merritt Engineering Consulting460202/21/2023
Building Lifecycle
All (68)Filed (7)Permit Issued (3)Signed Off (3)Violation (26)Objection (6)Special Inspection (23)
10/06/2026
Objection raised — Other
09/23/2026
Filed — Alteration CO
REPLACE TENANT 2 STOREFRONT AND CHANGE THIRD FLOOR USE FROM ACCESSORY STORAGE TO RETAIL STORE WITH INCREASED OCCUPANT LOAD.
X01445960-S2
09/17/2026
Special inspection requirement — Post-installed Anchors
09/17/2026
Special inspection requirement — Concrete - Cast-In-Place
09/17/2026
Special inspection requirement — Sprayed fire-resistant materials
09/17/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
09/17/2026
Special inspection requirement — Final
09/17/2026
Special inspection requirement — Structural Steel - Details
09/17/2026
Special inspection requirement — Masonry
09/17/2026
Special inspection requirement — Structural Steel - Welding
09/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
09/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/16/2026
Filed — Alteration
INSTALLATION OF MECHANICAL AIR HANDLER AND DUCTWORK FOR HEATING, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01392656-I1
09/04/2026
Objection raised — Other
09/04/2026
Objection raised — Other
09/04/2026
Objection raised — Other
09/04/2026
Objection raised — Other
09/04/2026
Objection raised — Other
08/21/2026
Filed — Alteration CO
REPLACE TENANT 2 STOREFRONT AND CHANGE THIRD FLOOR USE FROM ACCESSORY STORAGE TO RETAIL STORE WITH INCREASED OCCUPANT LOAD.
X01445960-I1
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/17/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
04/24/2026
Special inspection requirement — Mechanical Systems
Luis Pichardo
04/24/2026
Special inspection requirement — Final
Juan Ramos
03/02/2023
Signed off — Alteration
REPLACE SUPPLEMENTAL 3 TON SPLIT AC SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00761438-I1
02/21/2023
Filed — Alteration
REPLACE SUPPLEMENTAL 3 TON SPLIT AC SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00761438-P1
12/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Krepcio
12/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Krepcio
12/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Krepcio
12/27/2022
Special inspection requirement — Final
Christopher Krepcio
12/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Christopher Krepcio
12/27/2022
Special inspection requirement — Mechanical Systems
Christopher Krepcio
12/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Krepcio
12/07/2022
Permit issued — Mechanical Systems
X00761438-I1-MS
07/13/2022
Filed — Alteration
REPLACE SUPPLEMENTAL 3 TON SPLIT AC SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00761438-I1
08/05/2021
Signed off — Alteration
Erect illuminated accessory business wall sign copy reading "Chase with Logo"
X00501116-I1
08/05/2021
Signed off — Alteration
X00501126-I1
04/28/2021
Permit issued — Sign
X00501126-I1-SG
04/28/2021
Permit issued — Sign
X00501116-I1-SG
04/27/2021
Filed — Alteration
Erect illuminated accessory business wall sign copy reading "Chase with Logo"
X00501116-I1
04/27/2021
Filed — Alteration
X00501126-I1
04/13/2021
Special inspection requirement — Final
AHMED SHAABAN
04/13/2021
Special inspection requirement — Final
AHMED SHAABAN
02/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2013
Violation issued (ECB, open)
Construction
04/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/19/2013
Violation issued (ECB, closed)
Elevators
11/30/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/01/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/19/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/17/2005
Violation issued (ECB, closed)
Construction
05/20/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/30/2004
Violation issued (ECB, closed)
Construction
08/10/2004
Violation issued (ECB, closed)
Construction
11/09/2001
Violation issued (ECB, closed)
Construction
06/07/2001
Violation issued (ECB, closed)
Construction
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPerformance Mechancial12/07/2022
DOB NOWSignSigned-offNational Maintenance04/28/2021
DOB NOWSignSigned-offNational Maintenance04/28/2021
BISSPISSUEDBranch Plumbing09/09/2013
BISEQISSUEDA.J.S. Project Management09/05/2013
BISOTISSUEDA.J.S. Project Management09/05/2013
BISMHISSUEDA.J.S. Project Management09/05/2013
BISPLISSUEDBranch Plumbing08/13/2013
BISEQISSUEDA.J.S. Project Management08/07/2013
BISMHISSUEDA.J.S. Project Management08/07/2013
BISOTISSUEDA.J.S. Project Management08/07/2013
BISOTISSUEDA.J.S. Project Management08/07/2013
BIS—ISSUEDUltimate Signs & Designs Co07/26/2013
BIS—ISSUEDUltimate Signs & Designs Co07/26/2013
BISOTISSUEDFocal PT Design & Construction02/15/2013
BISEQISSUEDFocal PT Design & Construction02/15/2013
BISSDISSUEDDPH Plumbing & Heating02/08/2006
BISPLISSUEDCam Energy Heating and Me06/29/2005
BISPLISSUEDZara Plumbing02/10/2003
BISMHISSUEDER Sherri Construction12/12/2002
BISOTISSUEDER Sherri Construction12/12/2002
BIS—ISSUEDUnitech Design12/06/2002
BISPLRE-ISSUEDDPH Plumbing & Heating09/25/2002
BISOTISSUEDUltimate Signs & Designs Co07/05/2002
BISOTISSUEDUltimate Signs & Designs Co07/05/2002
BIS—ISSUEDUltimate Signs & Designs Co07/03/2002
BISPLISSUEDWilliam F Ventura P&H07/01/2002
BISOTISSUEDBerger Sign Fabrication05/10/2002
BISOTISSUEDBerger Sign Fabrication05/10/2002
BIS—ISSUEDBerger Sign Fabrication05/10/2002
BISOTISSUEDBerger Sign Fabrication05/10/2002
BISSPISSUEDVip Fire Sprinkler04/30/2002
BISFPISSUEDActive Fire Control Inc./Active04/01/2002
BISOTISSUEDPacific Tech03/21/2002
BISPLISSUEDWilliam F Ventura P&H03/13/2002
BISPLISSUEDDPH Plumbing & Heating02/20/2002
BISOTISSUEDGasoline Installations02/19/2002
BIS—ISSUEDDesign Build of NY12/28/2001
BISEQISSUEDDesign Build of NY12/27/2001
BISEQISSUEDColgate Scaffolding & Equipment08/14/2001
+ 7 more permits on file
1 project · most recent 09/16/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/16/2026——Heating and Air Conditioning Systems
2 projects · most recent 06/08/2022
General Wiring
FiledStatusContractorScope
06/08/2022CompleteE-J Electric Installation CoGeneral Wiring
12/14/2021CompleteUnity Electric Co—
1 project · most recent 09/23/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/23/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/17/2026Post-installed Anchors—special
09/17/2026Concrete - Cast-In-Place—special
09/17/2026Sprayed fire-resistant materials—special
09/17/2026Mastic and Intumescent Fire-resistant Coatings—special
09/17/2026Final—progress
09/17/2026Structural Steel - Details—special
09/17/2026Masonry—special
09/17/2026Structural Steel - Welding—special
09/17/2026Structural Steel - High Strength Bolting—special
09/17/2026Structural Stability – Alterations of existing buildings—special
08/17/2026Fire-Resistant Penetrations and Joints—special
08/17/2026Wall Panels, Curtain Walls, and Veneers—special
04/24/2026Mechanical SystemsLuis Pichardospecial
04/24/2026FinalJuan Ramosprogress
12/27/2022HVAC-R and service water piping design and insulationChristopher Krepcioenergy_progress
12/27/2022HVAC-R and service water heating system controlsChristopher Krepcioenergy_progress
12/27/2022HVAC-R and service water heating equipmentChristopher Krepcioenergy_progress
12/27/2022FinalChristopher Krepcioprogress
12/27/2022Energy Code Compliance InspectionsChristopher Krepcioprogress
12/27/2022Mechanical SystemsChristopher Krepciospecial
12/27/2022Fire-Resistant Penetrations and JointsChristopher Krepciospecial
04/13/2021FinalAHMED SHAABANprogress
04/13/2021FinalAHMED SHAABANprogress
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/22/2026X01392656-I1Request digital key ↗
08/25/2026X00501116-I1Request digital key ↗
08/24/2026X00761438-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION15
07/19/2016220327894Open ↗
07/05/2016220327894Open ↗
05/04/2016220327894Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION12
09/13/2013220327849Open ↗
09/13/2013220327849Open ↗
09/13/2013220327849Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications40
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
06/30/2014220327830Open ↗
06/30/2014220327830Open ↗
05/15/2014220327830Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/04/2026X01445960-S2Open ↗
09/22/2026X01392656-I1Open ↗
08/24/2026X00761438-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
08/09/2013220327849Open ↗
08/07/2013220327830Open ↗
07/26/2013220326939Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
08/09/2013220327849Open ↗
08/07/2013220327830Open ↗
07/26/2013220326939Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026X01392656-I1Open ↗
08/25/2026X00761438-P1Open ↗
08/25/2026X00761438-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X01392656-I1Open ↗
08/25/2026X00761438-P1Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
10/19/2013220327849Open ↗
10/19/2013220327830Open ↗
10/19/2013220327849Open ↗
▸BISSCHEDULE B - PLUMBING2
08/09/2013220327849Open ↗
08/07/2013220327830Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/19/2013220327830Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
08/09/2013220327849Open ↗
08/06/2013220327830Open ↗
07/26/2013220326939Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026X00761438-I1Open ↗
08/13/2026X00501126-I1Open ↗
08/13/2026X00501116-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/22/2026X01392656-I1Open ↗
08/24/2026X00761438-I1Open ↗
08/13/2026X00761438-P1Open ↗
▸DOB NOWOER: Notice to Proceed3
08/13/2026X00761438-I1Open ↗
08/13/2026X00501126-I1Open ↗
08/13/2026X00501116-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/15/2013220327849Open ↗
08/09/2013220327849Open ↗
02/15/2013220250653Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/15/2013220327849Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00761438-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00761438-I1Open ↗
▸Approvals, Objections & Sign-offs14
▸BISLETTERS - SUPPORTING DOCUMENTATION7
11/15/2013220326939Open ↗
11/15/2013220326920Open ↗
11/15/2013220326920Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
06/30/2014220327830Open ↗
05/15/2014220327830Open ↗
03/18/2014220327849Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
02/15/2013220250653Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
05/15/2014220327830Open ↗
11/15/2013220327849Open ↗
11/15/2013220326920Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET8
08/09/2013220327849Open ↗
08/09/2013220327849Open ↗
08/08/2013220327894Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION4
05/04/2016220327894Open ↗
04/28/2016220327894Open ↗
12/06/2013220327830Open ↗
Showing 3 of 4 on file for this type