← Back
Two stories - detached, small or mid-size
96 FRANKLIN AVENUE
STATEN ISLAND · BIN 5001636
💬 Discuss this project
1879Year Built
2.5Stories
A1Building Class
R3XZoning
2,100 sfGross Floor Area
1Units
4 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 12,500 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHRIST CHURCH NEW BRIGHTON403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AARON MCDONALD ARCHITECT110/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AHEARN-HOLTZMAN, INCGeneral Contractor403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CESCA ENGINEERING PLLC3821110/15/2021
Building Lifecycle
All (12)Filed (1)Permit Issued (2)Signed Off (1)Violation (4)Special Inspection (4)
05/26/2022
Signed off — Alteration
S00607129-I1
04/05/2022
Permit issued — General Construction
S00607129-I1-GC
11/04/2021
Permit issued — General Construction
S00607129-I1-GC
10/15/2021
Filed — Alteration
S00607129-I1
10/06/2021
Special inspection requirement — Chimneys and vents
Lawrence Cesca
10/06/2021
Special inspection requirement — Masonry
Lawrence Cesca
10/06/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Lawrence Cesca
10/06/2021
Special inspection requirement — Final
Aaron McDonald
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/08/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAHEARN-HOLTZMAN, INC04/05/2022
DOB NOWGeneral ConstructionSigned-offAHEARN-HOLTZMAN, INC11/04/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/06/2021Chimneys and ventsLawrence Cescaspecial
10/06/2021MasonryLawrence Cescaspecial
10/06/2021Structural Stability – Alterations of existing buildingsLawrence Cescaspecial
10/06/2021FinalAaron McDonaldprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026S00607129-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026S00607129-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026S00607129-I1Open ↗
08/24/2026S00607129-I1Open ↗
08/24/2026S00607129-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S00607129-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026S00607129-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S00607129-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026S00607129-I1Open ↗