1910Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,952 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 21p · 1 filing · 3 docs
Floor 1
Cellar5p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP408/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor407/08/2026
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371208/18/2025
NIC DESIGN INC9758308/18/2025
Building Lifecycle
All (30)Filed (4)Permit Issued (4)Signed Off (2)Inspection (5)Special Inspection (15)
09/23/2025
Signed off — Alteration
INSTALL BOILER, H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01116142-S1
09/03/2025
Signed off — Alteration
INSTALL BOILER, H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01116142-I1
08/18/2025
Filed — Alteration
INSTALL BOILER, H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01116142-P1
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
08/18/2025
Special inspection requirement — Mechanical Systems
Eric Sun
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
08/18/2025
Special inspection requirement — Final
Eric Sun
08/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
08/18/2025
Special inspection requirement — Fenestration areas
Eric Sun
08/18/2025
Special inspection requirement — Interior lighting power
Eric Sun
08/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
08/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
08/18/2025
Special inspection requirement — Maintenance information
Eric Sun
08/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
08/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
08/18/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
08/18/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
08/18/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
07/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2025
Filed — Alteration
INSTALL BOILER, H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01116142-P2
06/05/2025
Permit issued — Plumbing
S01116142-S1-PL
04/03/2025
Permit issued — General Construction
S01116142-I1-GC-CX
01/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2024
Permit issued — Plumbing
S01116142-S1-PL
10/30/2024
Filed — Alteration
INSTALL BOILER, H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01116142-S1
10/01/2024
Permit issued — General Construction
S01116142-I1-GC-CX
09/27/2024
Filed — Alteration
INSTALL BOILER, H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S01116142-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/05/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY04/03/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/31/2024
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY10/01/2024
BISOTISSUEDSUNRUN INSTALLATION SVC08/01/2018
1 project · most recent 08/06/2018
FiledStatusContractorScope
08/06/2018CompleteSUNRUN SOLAR ELECTL CORP—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/18/2025Fire-Resistant Penetrations and JointsEric Sunspecial
08/18/2025Mechanical SystemsEric Sunspecial
08/18/2025Energy Code Compliance InspectionsEric Sunprogress
08/18/2025FinalEric Sunprogress
08/18/2025Fire-Resistance Rated ConstructionEric Sunprogress
08/18/2025Fenestration areasEric Sunenergy_progress
08/18/2025Interior lighting powerEric Sunenergy_progress
08/18/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
08/18/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
08/18/2025Maintenance informationEric Sunenergy_progress
08/18/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
08/18/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
08/18/2025Insulation placement and R valuesEric Sunenergy_progress
08/18/2025Fenestration air leakageEric Sunenergy_progress
08/18/2025Air barrier - visual inspectionEric Sunenergy_progress
▾Documents — 26 on file (BIS + DOB NOW)
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/31/2018540151841Open ↗
▸BISWORK PERMIT APPLICATION1
07/31/2018540151841Open ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S01116142-I1Open ↗
09/01/2026S01116142-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/31/2018540151841Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/31/2018540151841Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/31/2018540151841Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S01116142-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
07/31/2018540151841Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/31/2018540151841Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/14/2018540151841Open ↗
07/31/2018540151841Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/14/2018540151841Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
09/14/2018540151841Open ↗
▸BISNYCECC ANALYSIS1
07/31/2018540151841Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/31/2018540151841Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/31/2018540151841Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/14/2018540151841Open ↗
07/31/2018540151841Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/14/2018540151841Open ↗
07/31/2018540151841Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
09/14/2018540151841Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/14/2018540151841Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/14/2018540151841Open ↗
07/31/2018540151841Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/31/2018540151841Open ↗