← Back
Two family frame
96 HOOKER PLACE
STATEN ISLAND · BIN 5175724
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
2,402 sfGross Floor Area
2Units
8 Open Violations ▸FDNY Report ↗
Two family frame · 3,948 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 215p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
1 job · most recent 06/01/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/01/2023Signed-offZAIM CONTRACTOR CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Ameristar M4AC3024D1000AA 24,000 BTU · Condensing Unit ×2
M4AC3048D1000AA 42,000 BTU · Condensing Unit ×2
Heating
Ameristar A801X060BM4SAC/A801X100BM4SAC 60,000 BTU · Furnace ×4
Ventilation
Renewaire N/A 75 CFM · Erv ×4
1 job · most recent 06/01/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/01/2023Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
1 job · most recent 12/15/2022
General Wiring
FiledStatusContractorScope
12/15/2022CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 job · most recent 06/01/2023
Wood
FiledStatusContractorScope
06/01/2023Signed-offZAIM CONTRACTOR CORPWood
Building Lifecycle
All (77)Filed (7)Permit Issued (7)Signed Off (3)Violation (10)Inspection (12)Objection (8)Special Inspection (30)
08/12/2026
Violation issued (HPD, open)
B
08/12/2026
Violation issued (HPD, open)
B
08/12/2026
Violation issued (HPD, open)
B
08/12/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, closed)
I
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, open)
B
02/24/2026
Violation issued (HPD, open)
B
02/24/2026
Violation issued (HPD, open)
B
02/24/2026
Violation issued (HPD, open)
B
07/07/2023
Signed off — New Building
Plumbing work filed in conjunction with NB application.
S00706660-S2
07/05/2023
Signed off — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S00792571-I1
06/22/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Metering
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
06/22/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
06/21/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2023
Objection resolved — Addressed
06/16/2023
Objection resolved — Addressed
06/15/2023
Objection raised — Other
06/15/2023
Objection raised — Other
06/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2023
Permit issued — Sprinklers
S00792571-I1-PL
06/01/2023
Filed — New Building
Plumbing work filed in conjunction with NB application.
S00706660-P3
05/25/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/22/2023
Signed off — New Building
Plumbing work filed in conjunction with NB application.
S00706660-S1
05/04/2023
Filed — New Building
Plumbing work filed in conjunction with NB application.
S00706660-P1
05/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Heating Systems
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
05/04/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
03/31/2023
Permit issued — Mechanical Systems
S00706660-S1-MS
03/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/20/2023
Filed — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S00792571-P1
Latest 60 of 77 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SI NORTHSHOER ENTERPRISES1507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.306/01/2023
C&P DESIGN CONSULTANTS205/04/2023
WILLIAM MONTAGUE ENGINEER203/20/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAIM CONTRACTOR CORPGeneral Contractor403/21/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection207/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677706/01/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFLOW-RIGHT PLBG & HTG COR06/12/2023
DOB NOWMechanical SystemsSigned-offSUFFOLK CONSTRUCT CO. INC03/31/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP03/14/2023
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP10/25/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR10/24/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC10/19/2022
DOB NOWFoundationPermit IssuedSUFFOLK CONSTRUCT CO. INC09/07/2022
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
06/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/16/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/25/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/02/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/28/2022Pass-Final PL - UndergroundPassView ↗
10/24/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
06/22/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
06/22/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
06/22/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
06/22/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
06/22/2023Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
06/22/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
06/22/2023Excavations - Sheeting, Shoring, and BracingWILLIAM MONTAGUEspecial
06/22/2023Footing and FoundationWILLIAM MONTAGUEprogress
06/22/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
06/22/2023Structural Wood FrameWILLIAM MONTAGUEprogress
06/22/2023FinalWILLIAM MONTAGUEprogress
06/22/2023MeteringWILLIAM MONTAGUEenergy_progress
06/22/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
06/22/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
06/22/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
06/22/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
06/22/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
06/22/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
06/22/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
06/22/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
06/22/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
06/22/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
05/04/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
05/04/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
05/04/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
Latest 25 of 50.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026S00706660-P3Request digital key ↗
08/24/2026S00706660-P1Request digital key ↗
08/24/2026S00706660-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00706660-P3Open ↗
08/13/2026S00706660-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00706660-I1Open ↗
08/13/2026S00706660-P3Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S00706660-P3Open ↗
08/13/2026S00706660-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00706660-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWSpecial Inspector Seal & Signature10
09/20/2026S00706660-S2Open ↗
09/20/2026S00706660-S2Open ↗
09/20/2026S00706660-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/20/2026S00706660-S2Open ↗
08/28/2026S00706660-I1Open ↗
08/28/2026S00706660-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026S00706660-P3Open ↗
08/24/2026S00706660-P1Open ↗
08/24/2026S00706660-S2Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00706660-I1Open ↗
08/13/2026S00706660-P3Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00706660-P3Open ↗
08/13/2026S00706660-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00706660-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00706660-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00706660-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00706660-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S00706660-I1Open ↗
08/13/2026S00706660-P3Open ↗
08/13/2026S00706660-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00706660-S2Open ↗
08/13/2026S00706660-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00706660-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00706660-I1Open ↗
08/13/2026S00706660-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00706660-P3Open ↗
08/13/2026S00706660-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026S00706660-P3Open ↗
08/15/2026S00706660-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00706660-I1Open ↗