← Back
One family attached or semi-detached
96 LENEVAR AVENUE
STATEN ISLAND · BIN 5175481
💬 Discuss this project
2023Year Built
2Stories
A5Building Class
R3-1Zoning
1,498 sfGross Floor Area
1Units
One family attached or semi-detached · 2,644 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PINA DEVELOPMENT1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANNA & LOCCISANO ARCHITECTS, PC612/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NELLO HOMES, INCGeneral Contractor303/21/2026
FINE MECHANICAL CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738612/01/2023
Building Lifecycle
All (58)Filed (6)Permit Issued (3)Signed Off (1)Inspection (10)Objection (8)Special Inspection (30)
03/01/2024
Signed off — Alteration
PLUMBING APPLICATION IN CONJUNCTION WITH NB#S00645643
S00646153-I1
02/01/2024
Objection raised — Other
02/01/2024
Objection resolved — Addressed
02/01/2024
Objection resolved — Addressed
02/01/2024
Objection resolved — Addressed
02/01/2024
Objection resolved — Addressed
12/13/2023
Objection raised — Other
12/13/2023
Objection raised — Other
12/13/2023
Objection raised — Other
12/01/2023
Filed — New Building
NEW BUILDING APPLICATION FOR TWO-STORY, SINGLE FAMILY, SEMI-DETACHED RESIDENCE W/ (2) 8'-6"x18'-0" PARKING PADS. CURB CUT FILED UNDER 94 LENEVAR AVENUE, JOB # S00645852.
S00645643-P2
11/28/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
11/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
11/28/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/28/2023
Special inspection requirement — Mechanical Systems
anthony santoro
11/28/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
11/28/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
11/28/2023
Special inspection requirement — Final
anthony santoro
11/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
11/28/2023
Special inspection requirement — Footing and Foundation
anthony santoro
11/28/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
11/28/2023
Special inspection requirement — Permanent certificate
anthony santoro
11/28/2023
Special inspection requirement — Ventilation and air distribution system
anthony santoro
11/28/2023
Special inspection requirement — Metering
anthony santoro
11/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
11/28/2023
Special inspection requirement — Fenestration areas
anthony santoro
11/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
11/28/2023
Special inspection requirement — Interior lighting power
anthony santoro
11/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
11/28/2023
Special inspection requirement — Air barrier — testing
anthony santoro
11/28/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
11/28/2023
Special inspection requirement — Maintenance information
anthony santoro
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
11/28/2023
Special inspection requirement — Fireplaces
anthony santoro
11/28/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
11/28/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
11/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2023
Filed — Alteration
PLUMBING APPLICATION IN CONJUNCTION WITH NB#S00645643
S00646153-P2
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/20/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/13/2023
Filed — New Building
NEW BUILDING APPLICATION FOR TWO-STORY, SINGLE FAMILY, SEMI-DETACHED RESIDENCE W/ (2) 8'-6"x18'-0" PARKING PADS. CURB CUT FILED UNDER 94 LENEVAR AVENUE, JOB # S00645852.
S00645643-P1
10/13/2023
Filed — Alteration
PLUMBING APPLICATION IN CONJUNCTION WITH NB#S00645643
S00646153-P1
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
07/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2023
Permit issued — Plumbing
S00646153-I1-PL
12/30/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/10/2022
Permit issued — Plumbing
S00646153-I1-PL
12/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/30/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/23/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/26/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/10/2022
Permit issued — Structural
S00645643-I1-GC-CX
09/14/2022
Filed — Alteration
PLUMBING APPLICATION IN CONJUNCTION WITH NB#S00645643
S00646153-I1
01/21/2022
Filed — New Building
NEW BUILDING APPLICATION FOR TWO-STORY, SINGLE FAMILY, SEMI-DETACHED RESIDENCE W/ (2) 8'-6"x18'-0" PARKING PADS. CURB CUT FILED UNDER 94 LENEVAR AVENUE, JOB # S00645852.
S00645643-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP02/24/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP12/10/2022
DOB NOWStructuralPermit IssuedNELLO HOMES, INC10/10/2022
1 project · most recent 12/01/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/01/2023Permit IssuedNELLO HOMES, INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Rheem RA13N260AJ1NA 5 tons · Condensing Unit ×1
RCFZ6024STANMC 2 tons · Fan Coil Indoor ×1
Heating
A.O. Smith AT1-540H100 199,000 BTU · Water Heater ×1
Rheem R801CA125524MSA 125,000 BTU · Furnace ×1
Ventilation
Aprilaire 8126X 110 CFM · Exhaust Fan ×1
1 project · most recent 11/21/2023
General Wiring
FiledStatusContractorScope
11/21/2023CompleteLASER LITE ELECT'L INC.General Wiring
1 project · most recent 12/01/2023
Wood
FiledStatusContractorScope
12/01/2023Permit IssuedNELLO HOMES, INCWood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/26/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/28/2023Fenestration air leakageanthony santoroenergy_progress
11/28/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
11/28/2023Concrete - Cast-In-Placeanthony santorospecial
11/28/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
11/28/2023Mechanical Systemsanthony santorospecial
11/28/2023Subgrade Inspectionsanthony santorospecial
11/28/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/28/2023Energy Code Compliance Inspectionsanthony santoroprogress
11/28/2023Finalanthony santoroprogress
11/28/2023Fire-Resistance Rated Constructionanthony santoroprogress
11/28/2023Footing and Foundationanthony santoroprogress
11/28/2023Structural Wood Frameanthony santoroprogress
11/28/2023Permanent certificateanthony santoroenergy_progress
11/28/2023Ventilation and air distribution systemanthony santoroenergy_progress
11/28/2023Meteringanthony santoroenergy_progress
11/28/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
11/28/2023Fenestration areasanthony santoroenergy_progress
11/28/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/28/2023Interior lighting poweranthony santoroenergy_progress
11/28/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
11/28/2023Air barrier — testing anthony santoroenergy_progress
11/28/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
11/28/2023Maintenance informationanthony santoroenergy_progress
11/28/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
11/28/2023Fireplacesanthony santoroenergy_progress
Latest 25 of 31.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/22/2026S00646153-P2Request digital key ↗
08/22/2026S00646153-I1Request digital key ↗
08/22/2026S00646153-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00645643-P1Open ↗
08/13/2026S00645643-P2Open ↗
08/13/2026S00645643-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00645643-I1Open ↗
08/13/2026S00645643-P2Open ↗
08/13/2026S00645643-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00645643-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026S00646153-P1Open ↗
08/22/2026S00646153-I1Open ↗
08/22/2026S00645643-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026S00646153-P1Open ↗
09/01/2026S00646153-P2Open ↗
08/29/2026S00645643-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026S00646153-P1Open ↗
09/01/2026S00646153-P2Open ↗
08/29/2026S00645643-P2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00645643-I1Open ↗
08/13/2026S00645643-P1Open ↗
08/13/2026S00645643-P2Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00645643-P1Open ↗
08/13/2026S00645643-I1Open ↗
08/13/2026S00645643-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00645643-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00645643-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00645643-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00645643-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026S00645643-I1Open ↗
08/13/2026S00645643-P2Open ↗
08/13/2026S00645643-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00645643-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026S00645643-P2Open ↗
08/13/2026S00645643-I1Open ↗
08/13/2026S00645643-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00645643-P2Open ↗
08/13/2026S00645643-I1Open ↗
08/13/2026S00645643-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026S00645643-P1Open ↗
08/22/2026S00645643-I1Open ↗
08/15/2026S00645643-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00645643-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00645643-I1Open ↗