← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Ebenezer Plaza Condominium
96 NEW LOTS AVENUE · Brownsville · BIN 3327047
💬 Discuss this project
2018Year Built
11Stories
RMBuilding Class
R7DZoning
272,047 sfGross Floor Area
472Units
LL97 CoveredRent Stabilized15 Active Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: HP Ebenezer Plaza HDFC · 55,065 sf lot · 4.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsSidewalk shed installation1 filing
RoofChurch of God of East Flatbush, Ebenezer Church of God of Ea5p · 4 filings · 17 docs
Floor 1Youth Design Center, Church of God of East Flatbush +113p · 11 filings · 20 docs
CellarChurch of God of East Flatbush, Ebenezer Church of God of Ea3p · 3 filings · 18 docs
Site & exteriorSidewalk shed installation1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ebenezer Plaza Owner LLC C/O Pro3403/21/2026
Church of God of East Flatbush1507/08/2026
Procida Development Group1407/08/2026
Artel Co203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Wells Engineering412/29/2024
Perkins Eastman310/02/2024
McNamara Salvia207/02/2024
David Stanton Rockwell111/13/2023
Morozov507/21/2023
Howard I Shapiro & Associates303/23/2021
Asif Jamil, RA407/20/2020
Paul Perdek, Prof. Engineering106/15/2020
AKRF103/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1903/21/2026
Howard I Shapiro Associates603/21/2026
AE Design Solution203/21/2026
Noel Building Consulting1003/21/2026
Green Studio803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brisa BuildersGeneral Contractor903/21/2026
Procida ConstructionGeneral Contractor707/08/2026
Procida ConstructionScaffold607/08/2026
AKRFGeneral Contractor403/22/2026
Bulls Eye ContractorGeneral Contractor407/08/2026
Platinum Services NYScaffold407/08/2026
Rock Group NYScaffold207/08/2026
Miller Plumbing & HeatingPlumbing207/08/2026
4Matic ConstructionScaffold107/08/2026
Miller Plumbing & HeatingFire Protection107/08/2026
Rigid Plumbing ContractorsFire Protection107/08/2026
Rka Piping and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Wells Design & Consulting7750312/29/2024
MJ Engineering & Design5546910/02/2024
Ryan Special Engineering2018407/25/2024
Building Lifecycle
All (221)Filed (24)Permit Issued (21)Signed Off (14)Violation (60)Inspection (12)Objection (60)Special Inspection (30)
07/29/2026
Violation issued (HPD, open)
C
05/04/2026
Violation issued (HPD, open)
B
05/04/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (FDNY_ORDER, closed)
03/31/2026
Violation issued (FDNY_ORDER, closed)
03/31/2026
Violation issued (FDNY_ORDER, closed)
01/27/2026
Violation issued (HPD, open)
C
01/27/2026
Violation issued (HPD, closed)
B
01/27/2026
Violation issued (HPD, closed)
B
01/18/2026
Violation issued (HPD, closed)
B
01/18/2026
Violation issued (HPD, closed)
C
01/18/2026
Violation issued (HPD, closed)
B
12/14/2025
Violation issued (HPD, closed)
C
11/29/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
C
07/10/2025
Violation issued (HPD, closed)
C
07/07/2025
Violation issued (HPD, closed)
C
07/07/2025
Violation issued (HPD, closed)
C
07/05/2025
Violation issued (HPD, closed)
B
07/05/2025
Violation issued (HPD, closed)
C
07/05/2025
Violation issued (HPD, closed)
C
07/05/2025
Violation issued (HPD, closed)
C
07/02/2025
Violation issued (HPD, closed)
C
06/29/2025
Violation issued (HPD, closed)
C
06/29/2025
Violation issued (HPD, closed)
C
03/05/2025
Signed off — Alteration
Installation of Sprinkler fixtures. No change of use, egress or occupancy under this application.
B00941221-S1
02/25/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/10/2025
Violation issued (FDNY_NOV, closed)
02/04/2025
Signed off — Alteration
Installation of new mechanical system for retail store. No change of use, egress or occupancy under this application. Note: Constr. Work related to Tenant build out related to NB#321384140
B00941230-I1
01/22/2025
Violation issued (HPD, closed)
C
01/22/2025
Violation issued (HPD, closed)
C
01/22/2025
Violation issued (HPD, closed)
C
01/22/2025
Violation issued (HPD, closed)
C
01/06/2025
Special inspection requirement — Maintenance information
Tyrone Wells
01/06/2025
Special inspection requirement — Final
Tyrone Wells
01/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tyrone Wells
01/06/2025
Special inspection requirement — Duct leakage testing, insulation and design
Tyrone Wells
01/06/2025
Special inspection requirement — Mechanical Systems
Tyrone Wells
01/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
01/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tyrone Wells
01/06/2025
Special inspection requirement — Ventilation and air distribution system
Tyrone Wells
01/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tyrone Wells
12/29/2024
Filed — Alteration
Installation of new mechanical system for retail store. No change of use, egress or occupancy under this application. Note: Constr. Work related to Tenant build out related to NB#321384140
B00941230-P1
12/10/2024
Signed off — Alteration
Structural work in relation to interior renovation of existing community facility at first floor. No change to use, egress or occupancy.
B00456697-I1
12/05/2024
Permit issued — Sprinklers
B00941221-S1-EW-SP
11/21/2024
Signed off — Alteration
Interior renovation and fit out of existing community facility space at first floor as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #321384140.
B00456135-I1
11/18/2024
Special inspection requirement — Mechanical Systems
Tyrone Wells
11/18/2024
Special inspection requirement — Duct leakage testing, insulation and design
Tyrone Wells
11/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Tyrone Wells
11/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
Tyrone Wells
11/18/2024
Special inspection requirement — Ventilation and air distribution system
Tyrone Wells
11/18/2024
Special inspection requirement — Maintenance information
Tyrone Wells
11/18/2024
Special inspection requirement — Final
Tyrone Wells
11/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
Tyrone Wells
11/14/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/11/2024
Signed off — Alteration
Removal & storage of (1) Entry vestibule. Addition of (2) enclosed spaces. Replacement of light fixtures & new ductwork. No change of use, egress or occupancy under this applic..; Note: Constr. Work related to Tenant build out related to NB#321384140
B00943609-I1
11/06/2024
Signed off — Alteration
Installation of Sprinkler fixtures. No change of use, egress or occupancy under this application.
B00941221-I1
Latest 60 of 221 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offRigid Plumbing Contractors12/05/2024
DOB NOWGeneral ConstructionSigned-offBulls Eye Contractor06/17/2024
DOB NOWMechanical SystemsSigned-offBulls Eye Contractor06/17/2024
DOB NOWPlumbingSigned-offRka Piping and Heating06/12/2024
DOB NOWPlumbingSigned-offMiller Plumbing & Heating02/21/2024
DOB NOWSprinklersSigned-offMiller Plumbing & Heating03/13/2023
DOB NOWPlumbingSigned-offMiller Plumbing & Heating07/20/2022
DOB NOWStructuralSigned-offBrisa Builders12/16/2021
DOB NOWGeneral ConstructionSigned-offBrisa Builders12/15/2021
DOB NOWMechanical SystemsSigned-offBrisa Builders12/15/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/14/2021
DOB NOWConstruction FenceSigned-offProcida Construction05/20/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/01/2020
DOB NOWSupported ScaffoldSigned-off4Matic Construction06/16/2020
DOB NOWCurb CutSigned-offProcida Construction03/19/2020
DOB NOWConstruction FenceSigned-offProcida Construction03/19/2020
DOB NOWConstruction FenceSigned-offProcida Construction03/19/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/10/2019
DOB NOWSidewalk ShedSigned-offRock Group NY01/29/2019
DOB NOWConstruction FenceSigned-offProcida Construction01/28/2019
DOB NOWConstruction FenceSigned-offProcida Construction01/28/2019
BISPLISSUEDBent Mechanical02/09/2022
BIS—ISSUEDProcida Construction12/28/2021
BIS—ISSUEDProcida Construction12/14/2020
BIS—ISSUEDProcida Construction12/14/2020
BISPLISSUEDBent Mechanical12/10/2020
BISBLISSUEDBradford Mechanical Contracting10/23/2020
BISBLISSUEDBradford Mechanical Contracting10/22/2020
BIS—ISSUEDProcida Construction06/17/2020
BIS—ISSUEDProcida Construction06/17/2020
BISEQISSUEDRock Group NY06/05/2020
BISSPISSUEDBent Mechanical05/29/2020
BISEQISSUEDRock Group NY01/20/2020
BISEQISSUEDRock Group NY06/14/2019
BISSDISSUEDTTM Group04/26/2019
BISEQISSUEDRock Group NY02/02/2019
BIS—ISSUEDProcida Construction08/11/2017
BISEQISSUEDProcida Construction08/11/2017
BIS—ISSUEDA.M.A. Holdings02/12/2013
BISOTISSUEDA.M.A. Holdings02/12/2013
+ 8 more permits on file
6 projects · most recent 06/23/2022
General Wiring
FiledStatusContractorScope
06/23/2022CompleteRainbow Electric CoGeneral Wiring
06/04/2020CompleteRainbow Electric Co—
02/17/2020CompleteIlluminous Electric—
09/26/2019CancelledRainbow Electric CoGeneral Wiring
01/24/2019CompleteTop Shelf Electric—
01/09/2019CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/14/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/03/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/19/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
01/06/2025Maintenance informationTyrone Wellsenergy_progress
01/06/2025HVAC-R and service water heating equipmentTyrone Wellsenergy_progress
01/06/2025HVAC-R and service water piping design and insulationTyrone Wellsenergy_progress
01/06/2025HVAC-R and service water heating system controlsTyrone Wellsenergy_progress
01/06/2025Duct leakage testing, insulation and designTyrone Wellsenergy_progress
01/06/2025Ventilation and air distribution systemTyrone Wellsenergy_progress
01/06/2025FinalTyrone Wellsprogress
01/06/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
01/06/2025Mechanical SystemsTyrone Wellsspecial
11/18/2024Mechanical SystemsTyrone Wellsspecial
11/18/2024Ventilation and air distribution systemTyrone Wellsenergy_progress
11/18/2024HVAC-R and service water piping design and insulationTyrone Wellsenergy_progress
11/18/2024Maintenance informationTyrone Wellsenergy_progress
11/18/2024HVAC-R and service water heating equipmentTyrone Wellsenergy_progress
11/18/2024Duct leakage testing, insulation and designTyrone Wellsenergy_progress
11/18/2024HVAC-R and service water heating system controlsTyrone Wellsenergy_progress
11/18/2024FinalTyrone Wellsprogress
11/18/2024Tenant Protection Plan Compliance—special
10/31/2024FinalMagdy Youssefprogress
10/31/2024Structural Steel - DetailsMagdy Youssefspecial
10/31/2024Structural Steel - High Strength BoltingMagdy Youssefspecial
10/31/2024Post-installed AnchorsMagdy Youssefspecial
10/31/2024Structural Steel - WeldingMagdy Youssefspecial
10/31/2024Concrete - Cast-In-PlaceMagdy Youssefspecial
10/31/2024Structural Cold-Formed SteelMagdy Youssefspecial
Latest 25 of 68.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Youth Design CenterEducationFloor 1
Project B00941221 Alteration · LOC Issued · 11/13/2023
Project B00941230 Alteration · LOC Issued · 11/13/2023
Project B00943609 Alteration · LOC Issued · 11/13/2023
Church of God of East FlatbushReligiousCellar, Floor 1, Roof
Project B00456709 Alteration · LOC Issued · 04/22/2021
Project B00456735 Alteration · LOC Issued · 04/22/2021
Project B00456749 Alteration · LOC Issued · 04/22/2021
Project B00456135 Alteration · LOC Issued · 04/15/2021
Ebenezer Church of God of East FlatbushReligiousCellar, Floor 1, Roof
Project B00456697 Alteration · LOC Issued · 04/21/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 498 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch7
09/03/2026B00010987-I1Request digital key ↗
09/01/2026B00490767-I1Request digital key ↗
08/26/2026B00943609-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/02/2026B00123318-P2Request digital key ↗
09/02/2026B00123318-I1Request digital key ↗
08/15/2026B00123318-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00456135-P1Request digital key ↗
08/14/2026B00456135-I1Request digital key ↗
08/14/2026B00456135-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00456735-I1Request digital key ↗
08/15/2026B00456735-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00456709-I1Request digital key ↗
08/15/2026B00456709-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00112104-I1Request digital key ↗
09/02/2026B00112092-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/14/2026B00456697-I1Request digital key ↗
08/14/2026B00456697-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/01/2026B00456749-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00356156-I1Request digital key ↗
▸Applications & Permits78
▸BISPLAN / WORK APPROVAL APPLICATION54
09/05/2024321384140Open ↗
06/03/2024340626022Open ↗
01/25/2023321384140Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION19
01/03/2022321384140Open ↗
05/07/2021321384140Open ↗
04/28/2021321384140Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
06/23/2025321384140Open ↗
08/25/2021340626004Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/20/2021321384140Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026B00456135-I1Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING APPEAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications123
▸DOB NOWSpecial Inspector Seal & Signature31
09/01/2026B00456135-P1Open ↗
09/01/2026B00456135-P1Open ↗
09/01/2026B00456135-P1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
03/20/2020321384140Open ↗
03/20/2020321384140Open ↗
03/11/2020340626022Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/01/2026B00456135-P1Open ↗
09/01/2026B00456135-P1Open ↗
09/01/2026B00456135-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/03/2026B00010987-I1Open ↗
09/02/2026B00112104-I1Open ↗
09/02/2026B00112092-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/12/2019340681836Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/12/2019340681836Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/12/2019340681836Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING7
08/25/2021340626004Open ↗
08/19/2021340626004Open ↗
08/09/2021321384140Open ↗
Showing 3 of 7 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
07/12/2021321384140Open ↗
07/12/2021321384140Open ↗
07/12/2021321384140Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
04/22/2021340655240Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER2
04/10/2024340626022Open ↗
Showing 1 of 2 on file for this type
▸BISSTANDPIPE SYSTEMS1
09/02/2021340626004Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
06/27/2024340626022Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/09/2021340655240Open ↗
▸BISGAS CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
01/28/2022340636100Open ↗
10/09/2019340636100Open ↗
Showing 2 of 3 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos42
▸DOB NOWOER: Notice to Proceed20
08/13/2026B00456709-I1Open ↗
08/13/2026B00456749-I1Open ↗
08/13/2026B00456735-P1Open ↗
Showing 3 of 20 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION7
04/09/2025340636100Open ↗
05/14/2024340626022Open ↗
12/22/2021340654606Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026B00456735-I1Open ↗
08/13/2026B00456135-I1Open ↗
08/13/2026B00456709-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
06/12/2019340681836Open ↗
05/16/2019340655240Open ↗
Showing 2 of 4 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
11/23/2021321384140Open ↗
11/23/2021321384140Open ↗
10/27/2021321384140Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/11/2020340655240Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00456135-I1Open ↗
08/13/2026B00456735-I1Open ↗
08/13/2026B00456709-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/27/2021321384140Open ↗
10/13/2021340655240Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
11/03/2021321384140Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY29
11/23/2021321384140Open ↗
11/23/2021321384140Open ↗
11/23/2021321384140Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/12/2021321384140Open ↗
06/10/2019321384140Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/10/2019321384140Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
12/29/2021340654606Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE7
09/05/2024321384140Open ↗
01/25/2023321384140Open ↗
01/18/2023321384140Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
07/25/2024340626022Open ↗
12/29/2021340654606Open ↗
12/23/2021340681836Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/18/2019340626004Open ↗
Showing 1 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL2
12/29/2021340654606Open ↗
12/28/2021340654606Open ↗
▸BISSUPERSEDING LETTER1
05/07/2021321384140Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
05/14/2024340626022Open ↗
10/14/2021321823880Open ↗
10/13/2021340655240Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
01/03/2022321384140Open ↗
06/10/2019321384140Open ↗
Showing 2 of 3 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms67
▸BISADDITIONAL INFORMATION37
06/11/2025321384140Open ↗
10/11/2022340626022Open ↗
09/07/2022321384140Open ↗
Showing 3 of 37 on file for this type
▸BISEFILING COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISBOROUGH INTAKE FORM10
01/03/2022321384140Open ↗
05/07/2021321384140Open ↗
04/28/2021321384140Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
06/12/2019340681836Open ↗
Showing 1 of 6 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
08/20/2019340636100Open ↗
Showing 1 of 4 on file for this type
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT2
04/10/2024340626022Open ↗
04/10/2024340626022Open ↗
▸BISSupporting Document: Fee Exempt2
07/08/2019340626022Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
08/20/2019340636100Open ↗
07/18/2019340636100Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1