← Back
One family attached or semi-detached
96 SOUTH 2 STREET
BROOKLYN · BIN 3063072
💬 Discuss this project
1910Year Built
3Stories
A5Building Class
R6Zoning
3,104 sfGross Floor Area
1Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
One family attached or semi-detached · Owner of record: PLAYA HONEY BEE LLC · 1,440 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Floor 319p · 1 filing · 20 docs
Floor 221p · 2 filings · 20 docs
Floor 120p · 2 filings · 20 docs
Cellar20p · 2 filings · 20 docs
Basement20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
575 LAFAYETTE GARDENS4007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/26/2025$5.7M—— → —$1,842/sf building
04/11/2022$2.5M—— → —$822/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC207/14/2024
J.K.DESIGN706/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING603/21/2026
RCGA ARCHITECTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN BUILDERS GROUPGeneral Contractor1607/08/2026
NYC BUILDERS & RENOVATIONGeneral Contractor303/21/2026
WATERMARK PLUMBING CORPPlumbing207/08/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616707/14/2024
Building Lifecycle
All (109)Filed (9)Permit Issued (11)Signed Off (3)Violation (9)Inspection (13)Objection (34)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
07/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
11/22/2024
Signed off — Alteration
Installation of new gas fired equipment and plumbing fixtures ,for the interior renovation and conversion of this 4 family dwellings,into a one family dwelling unit. Filed in conjunction with ALT I app # B00702149-I1
B00800978-I1
10/30/2024
Signed off — Alteration
Installation of temporary construction fence in conjunction with ALT Co application #B00702149.
B00765615-I1
10/29/2024
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR THE EXISTING CEL+BSMT+3 STORY BUILDING IN CONJUCTION WITH ONGOING RENOVAITON WORK FILED SEPRATELY.PLUMBING WORK IS LIMITED TO THE INSTALLATION OF BACKFLOW PREVENTOR SYSTEM.
B00739866-I1
10/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/16/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/15/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/15/2024
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
08/15/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/15/2024
Special inspection requirement — Final
FAHAD FATEH
08/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/15/2024
Special inspection requirement — Structural Steel - Welding
FAHAD FATEH
08/15/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/15/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
08/15/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
08/15/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/15/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/15/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/15/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
08/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/06/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/23/2024
Objection raised — Scope
07/23/2024
Objection raised — Scope
07/23/2024
Objection raised — Scope
07/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/14/2024
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR THE EXISTING CEL+BSMT+3 STORY BUILDING IN CONJUCTION WITH ONGOING RENOVAITON WORK FILED SEPRATELY.PLUMBING WORK IS LIMITED TO THE INSTALLATION OF BACKFLOW PREVENTOR SYSTEM.
B00739866-P1
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/28/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/10/2024
Permit issued — Sprinklers
B00739866-I1-PL
06/10/2024
Permit issued — Plumbing
B00739866-I1-EW-SP
06/05/2024
Filed — Alteration CO
Existing four family dwellings to be renovated and converted into a one family dwelling. New drywall partitions and plumbing fixtures as per plans.
B00702149-P3
05/17/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/10/2024
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures ,for the interior renovation and conversion of this 4 family dwellings,into a one family dwelling unit. Filed in conjunction with ALT I app # B00702149-I1
B00800978-P1
05/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/10/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/03/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/11/2024
Violation issued (HPD, open)
A
04/04/2024
Permit issued — Plumbing
B00800978-I1-PL
12/06/2023
Permit issued — General Construction
B00702149-I1-GC-CX
11/22/2023
Violation issued (HPD, open)
I
11/01/2023
Permit issued — Mechanical Systems
B00702149-I1-GC-CX
11/01/2023
Permit issued — Construction Fence
B00765615-I1-FN
03/24/2023
Violation issued (HPD, open)
A
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC06/10/2024
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC06/10/2024
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP04/04/2024
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDERS & RENOVATION12/06/2023
DOB NOWMechanical SystemsPermit IssuedAMERICAN BUILDERS GROUP11/01/2023
DOB NOWConstruction FenceSigned-offAMERICAN BUILDERS GROUP11/01/2023
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP02/24/2023
DOB NOWStructuralPermit IssuedAMERICAN BUILDERS GROUP12/06/2022
DOB NOWConstruction FenceSigned-offAMERICAN BUILDERS GROUP12/06/2022
DOB NOWGeneral ConstructionPermit IssuedAMERICAN BUILDERS GROUP09/23/2022
DOB NOWConstruction FenceSigned-offAMERICAN BUILDERS GROUP09/19/2022
1 project · most recent 06/05/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2024Permit IssuedNYC BUILDERS & RENOVATIONAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric Mitsubishi #MXZ-SM36NAMHZ 48,000 BTU · Heat Pump Outdoor ×2
Heating
Mitsubishi Electric Mitsubishi #MXZ-SM48NAMHZ 54,000 BTU · Vrf Outdoor ×2
2 projects · most recent 07/16/2024
General Wiring
FiledStatusContractorScope
07/16/2024CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
01/17/2024CompleteAMERICAN POWER ELECT CONSGeneral Wiring
1 project · most recent 06/05/2024
Steel
FiledStatusContractorScope
06/05/2024Permit IssuedNYC BUILDERS & RENOVATIONSteel
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/03/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
08/15/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/15/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/15/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/15/2024Fenestration air leakageFAHAD FATEHenergy_progress
08/15/2024Shutoff dampersFAHAD FATEHenergy_progress
08/15/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
08/15/2024Structural Steel - DetailsFAHAD FATEHspecial
08/15/2024Fenestration areasFAHAD FATEHenergy_progress
08/15/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/15/2024Interior lighting powerFAHAD FATEHenergy_progress
08/15/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/15/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/15/2024Permanent certificateFAHAD FATEHenergy_progress
08/15/2024Structural Steel - WeldingFAHAD FATEHspecial
08/15/2024Mechanical SystemsFAHAD FATEHspecial
08/15/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/15/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/15/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/15/2024FinalFAHAD FATEHprogress
08/06/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/06/2024Sprinkler SystemsFAHAD FATEHspecial
06/28/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/28/2024Sprinkler SystemsFAHAD FATEHspecial
05/10/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/10/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 63.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026B00765615-I1Request digital key ↗
08/28/2026B00800978-I1Request digital key ↗
08/28/2026B00800978-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026B00739866-I1Open ↗
08/28/2026B00765615-I1Open ↗
08/28/2026B00800978-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B00702149-P2Open ↗
09/23/2026B00702149-P2Open ↗
08/28/2026B00800978-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B00702149-P2Open ↗
09/23/2026B00702149-P2Open ↗
08/28/2026B00800978-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/13/2026B00702149-I1Open ↗
08/13/2026B00702149-P2Open ↗
08/13/2026B00702149-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist2
08/13/2026B00800978-P1Open ↗
08/13/2026B00800978-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00702149-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00702149-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B00800978-P1Open ↗
08/28/2026B00800978-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/14/2026B00702149-I1Open ↗
08/13/2026B00739866-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00702149-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/24/2026B00702149-P3Open ↗
08/24/2026B00702149-P2Open ↗
08/15/2026B00702149-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00702149-I1Open ↗