← Back
Parsonage, rectory
Epiphany Roman Catholic Church
96 SOUTH 9 STREET · Name © OpenStreetMap contributors · BIN 3059665
💬 Discuss this project
1920Year Built
3Stories
M3Building Class
R6Zoning
3,375 sfGross Floor Area
1Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Parsonage, rectory · Owner of record: 96 S 9 LLC · 2,500 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 39p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
Basement8p · 1 filing · 20 docs
1 job · most recent 02/26/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2024Signed-offSPEARHEAD CONTRACTING LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NAHZ2 22,000 BTU · Heat Pump Outdoor ×3
MXZ-3C30NAHZ2 28,400 BTU · Heat Pump Outdoor ×2
MXZ-SM36NAMHZ-U1 36,000 BTU · Heat Pump Outdoor ×2
MXZ-2C20NAHZ2 18,000 BTU · Heat Pump Outdoor ×1
MXZ-3C30NAHZ3-U1 28,400 BTU · Heat Pump Outdoor ×4
MXZ-2C20NAHZ4-U1 18,000 BTU · Heat Pump Outdoor ×2
MXZ-3C24NAHZ3-U1. 22,000 BTU · Heat Pump Outdoor ×1
MXZ-SM42NAMHZ-U1 42,000 BTU · Heat Pump Outdoor ×1
MXZ-SM48NAMHZ-U1 48,000 BTU · Heat Pump Outdoor ×1
Ventilation
Renewaire EV-90 300 CFM · Erv ×2
1 job · most recent 02/16/2023
General Wiring
FiledStatusContractorScope
02/16/2023CompleteB.P. ELECTRIC CORPGeneral Wiring
1 job · most recent 02/26/2024
FiledStatusContractorScope
02/26/2024Signed-offSPEARHEAD CONTRACTING LLC2 scope_items
Building Lifecycle
All (108)Filed (11)Permit Issued (10)Signed Off (8)Violation (33)Inspection (11)Objection (14)Special Inspection (21)
05/05/2026
Violation issued (HPD, open)
A
03/26/2026
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2024
Violation issued (HPD, closed)
A
03/05/2024
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S5
03/01/2024
Permit issued — Mechanical Systems
B08030130-S5-MS
02/26/2024
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S5
12/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Signed off — Alteration
B08010012-I1
12/14/2023
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S1
12/13/2023
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S3
12/11/2023
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S2
12/11/2023
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S4
12/06/2023
Signed off — Alteration
DEMOLITION OF NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHES. NO STRUCTURAL WORK OR ALTERATION OF BUILDING BULK IS PROPOSED. REPOINTING / REPAIR OF THE BRICK FACADE AND PARAPET IS PROPOSED.
B08002901-I1
11/24/2023
Permit issued — General Construction
B08030130-I1-GC
11/24/2023
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
11/24/2023
Special inspection requirement — Final
FAHAD FATEH
09/29/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2023
Permit issued — General Construction
B08002901-I1-GC
09/20/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/20/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/06/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
09/05/2023
Signed off — Alteration
INSTALLAION OF CONSTRUCTION FENCE AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY
B07997408-I1
08/31/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/29/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/28/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/24/2023
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-P1
08/14/2023
Special inspection requirement — Final
FAHAD FATEH
08/14/2023
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/23/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/17/2023
Permit issued — Mechanical Systems
B08030130-S2-MS
05/17/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/16/2023
Permit issued — Sprinklers
B08030130-S1-EW-SP
05/11/2023
Permit issued — Plumbing
B08030130-S3-PL
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2023
Objection raised — Other
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Energy
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Scope
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Admin
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Other
04/21/2023
Objection resolved — Addressed
04/19/2023
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S1
04/19/2023
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S3
04/19/2023
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S2
04/18/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
Latest 60 of 108 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPEARHEAD CONTRACTING3707/08/2026
RELIABLE ENTERPRISES503/22/2026
100 S 9203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/17/2025$6.1M—— → —$1,807/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIDAMARI ENGINEERING SERVICES, P.C.402/26/2024
LEONID KRUPNIK, P.E.208/24/2023
DANIEL C. RUZEU311/02/2022
ENTHINK ENGINEERS LLC110/03/2022
SOCOTEC, INC.109/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES703/21/2026
SILVIA BOSCOLO403/21/2026
BAY RIDGE BUILDINGS CONSU103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPEARHEAD CONTRACTING LLCGeneral Contractor1307/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor303/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616702/26/2024
DR ARCHITECTURE & DESIGN,8111209/22/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSPEARHEAD CONTRACTING LLC03/01/2024
DOB NOWGeneral ConstructionPermit IssuedSPEARHEAD CONTRACTING LLC11/24/2023
DOB NOWGeneral ConstructionSigned-offSPEARHEAD CONTRACTING LLC09/25/2023
DOB NOWMechanical SystemsSigned-offSPEARHEAD CONTRACTING LLC05/17/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/16/2023
DOB NOWPlumbingSigned-offYG SERVICES INC05/11/2023
DOB NOWStructuralSigned-offSPEARHEAD CONTRACTING LLC02/16/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC10/04/2022
DOB NOWGeneral ConstructionSigned-offSPEARHEAD CONTRACTING LLC09/23/2022
DOB NOWConstruction FenceSigned-offSPEARHEAD CONTRACTING LLC09/08/2022
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/26/2026Pass-Final Construction Permit WithdrawalPassView ↗
12/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/31/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/28/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/24/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/23/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/17/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
11/24/2023Structural Cold-Formed SteelFAHAD FATEHspecial
11/24/2023FinalFAHAD FATEHprogress
09/20/2023Fenestration air leakageFAHAD FATEHenergy_progress
09/20/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/20/2023Fenestration areasFAHAD FATEHenergy_progress
08/14/2023FinalFAHAD FATEHprogress
08/14/2023Structural Cold-Formed SteelFAHAD FATEHspecial
04/18/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
04/18/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/18/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
04/18/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/18/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/18/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/18/2023Maintenance informationFAHAD FATEHenergy_progress
11/02/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/01/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/01/2022Lighting in dwelling unitsFAHAD FATEHenergy_progress
09/21/2022Fire-Resistant Penetrations and JointsDANIEL RUZEUspecial
09/21/2022FinalDANIEL RUZEUprogress
09/21/2022Fire-Resistance Rated ConstructionDANIEL RUZEUprogress
09/21/2022Energy Code Compliance InspectionsDANIEL RUZEUprogress
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B07997408-I1Request digital key ↗
08/28/2026B08002901-I1Request digital key ↗
08/28/2026B08002901-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/15/2023301027877Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08030130-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B07997408-I1Open ↗
08/28/2026B08002901-P1Open ↗
08/28/2026B08002901-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/26/2026B08030130-S3Open ↗
09/26/2026B08030130-S3Open ↗
09/02/2026B08002901-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/26/2026B08030130-S3Open ↗
09/02/2026B08002901-P1Open ↗
08/30/2026B08030130-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B08030130-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B08002901-P1Open ↗
08/28/2026B08002901-I1Open ↗
08/13/2026B08030130-I1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B08030130-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08030130-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B08030130-I1Open ↗