← Back
BuildNYC
Parsonage, rectory
Epiphany Roman Catholic Church
96 SOUTH 9TH STREET · Name © OpenStreetMap contributors · BIN 3059665
💬 Discuss this project
1920Year Built
3Stories
M3Building Class
R6Zoning
3,375 sfGross Floor Area
1Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Parsonage, rectory · Owner of record: 96 S 9 LLC · 2,500 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEpiphany Roman Catholic Church17p · 1 filing · 20 docs
Floor 4Epiphany Roman Catholic Church1 filing · 10 docs
Floor 3Epiphany Roman Catholic Church31p · 2 filings · 20 docs
Floor 2Epiphany Roman Catholic Church30p · 2 filings · 20 docs
Floor 1Epiphany Roman Catholic Church31p · 2 filings · 20 docs
CellarEpiphany Roman Catholic Church33p · 1 filing · 20 docs
BasementEpiphany Roman Catholic Church30p · 1 filing · 20 docs
Site & exteriorEpiphany Roman Catholic Church8p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
100 S 9203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/17/2025$6.1M—— → —$1,807/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hidamari Engineering Services402/26/2024
Leonid Krupnik, P.E208/24/2023
Daniel C. Ruzeu311/02/2022
Enthink Engineers110/03/2022
Socotec109/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Builders Services703/21/2026
Silvia Boscolo403/21/2026
Bay Ridge Buildings Consulting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spearhead ContractingGeneral Contractor1107/08/2026
Reliable EnterprisesScaffold303/21/2026
Spearhead ContractingScaffold203/21/2026
Mpi PlumbingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616702/26/2024
DR Architecture & Design8111209/22/2022
Building Lifecycle
All (117)Filed (11)Permit Issued (10)Signed Off (8)Violation (33)Inspection (11)Objection (14)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
03/26/2026
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2024
Violation issued (HPD, closed)
A
03/05/2024
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S5
03/01/2024
Permit issued — Mechanical Systems
B08030130-S5-MS
02/26/2024
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S5
12/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Signed off — Alteration
B08010012-I1
12/14/2023
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S1
12/13/2023
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S3
12/11/2023
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S4
12/11/2023
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S2
12/06/2023
Signed off — Alteration
DEMOLITION OF NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHES. NO STRUCTURAL WORK OR ALTERATION OF BUILDING BULK IS PROPOSED. REPOINTING / REPAIR OF THE BRICK FACADE AND PARAPET IS PROPOSED.
B08002901-I1
11/24/2023
Permit issued — General Construction
B08030130-I1-GC
11/24/2023
Special inspection requirement — Final
FAHAD FATEH
11/24/2023
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
09/29/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2023
Permit issued — General Construction
B08002901-I1-GC
09/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/20/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/20/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/06/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
09/05/2023
Signed off — Alteration
INSTALLAION OF CONSTRUCTION FENCE AS PER PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY
B07997408-I1
08/31/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/29/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/28/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/24/2023
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-P1
08/14/2023
Special inspection requirement — Final
FAHAD FATEH
08/14/2023
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/23/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/17/2023
Permit issued — Mechanical Systems
B08030130-S2-MS
05/17/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/16/2023
Permit issued — Sprinklers
B08030130-S1-EW-SP
05/11/2023
Permit issued — Plumbing
B08030130-S3-PL
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2023
Objection raised — Other
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Energy
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Admin
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Scope
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Other
04/21/2023
Objection resolved — Addressed
04/19/2023
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S1
04/19/2023
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S3
04/19/2023
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO, job number: B08030130-I1.
B08030130-S2
04/18/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSpearhead Contracting03/01/2024
DOB NOWGeneral ConstructionPermit IssuedSpearhead Contracting11/24/2023
DOB NOWGeneral ConstructionSigned-offSpearhead Contracting09/25/2023
DOB NOWMechanical SystemsSigned-offSpearhead Contracting05/17/2023
DOB NOWSprinklersSigned-offAmb Mechanical05/16/2023
DOB NOWPlumbingSigned-offYG Services05/11/2023
DOB NOWStructuralSigned-offSpearhead Contracting02/16/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises10/04/2022
DOB NOWGeneral ConstructionSigned-offSpearhead Contracting09/23/2022
DOB NOWConstruction FenceSigned-offSpearhead Contracting09/08/2022
1 project · most recent 02/26/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/26/2024Signed-offSpearhead ContractingHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NAHZ2 22,000 BTU · Heat Pump Outdoor ×3
MXZ-3C30NAHZ2 28,400 BTU · Heat Pump Outdoor ×2
MXZ-SM36NAMHZ-U1 36,000 BTU · Heat Pump Outdoor ×2
MXZ-2C20NAHZ2 18,000 BTU · Heat Pump Outdoor ×1
MXZ-3C30NAHZ3-U1 28,400 BTU · Heat Pump Outdoor ×4
MXZ-2C20NAHZ4-U1 18,000 BTU · Heat Pump Outdoor ×2
MXZ-3C24NAHZ3-U1. 22,000 BTU · Heat Pump Outdoor ×1
MXZ-SM42NAMHZ-U1 42,000 BTU · Heat Pump Outdoor ×1
MXZ-SM48NAMHZ-U1 48,000 BTU · Heat Pump Outdoor ×1
Ventilation
Renewaire EV-90 300 CFM · Erv ×2
1 project · most recent 02/16/2023
General Wiring
FiledStatusContractorScope
02/16/2023CompleteB.P. ElectricGeneral Wiring
1 project · most recent 02/26/2024
FiledStatusContractorScope
02/26/2024Signed-offSpearhead Contracting2 scope_items
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/26/2026Pass-Final Construction Permit WithdrawalPassView ↗
12/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/31/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/28/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/24/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/23/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/17/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
11/24/2023FinalFAHAD FATEHprogress
11/24/2023Structural Cold-Formed SteelFAHAD FATEHspecial
09/20/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/20/2023Fenestration air leakageFAHAD FATEHenergy_progress
09/20/2023Fenestration areasFAHAD FATEHenergy_progress
08/14/2023FinalFAHAD FATEHprogress
08/14/2023Structural Cold-Formed SteelFAHAD FATEHspecial
04/18/2023Maintenance informationFAHAD FATEHenergy_progress
04/18/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/18/2023Heating SystemsFAHAD FATEHspecial
04/18/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
04/18/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/18/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
04/18/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
04/18/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/18/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/18/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/18/2023Electrical motors and elevatorsFAHAD FATEHenergy_progress
04/18/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/18/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/18/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/18/2023Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
04/18/2023Maintenance informationFAHAD FATEHenergy_progress
04/18/2023Shutoff dampersFAHAD FATEHenergy_progress
11/25/2022Mechanical SystemsFAHAD FATEHspecial
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Epiphany Roman Catholic ChurchReligiousEntire building
Project B08030130 Alteration CO · LOC Issued · 11/02/2022
Project B08010012 Alteration · LOC Issued · 10/03/2022
Project B08002901 Alteration · LOC Issued · 09/16/2022
Project B07997408 Alteration · LOC Issued · 09/07/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B07997408-I1Request digital key ↗
08/28/2026B08002901-I1Request digital key ↗
08/28/2026B08002901-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/15/2023301027877Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08030130-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
10/02/2026B08030130-S2Open ↗
10/02/2026B08030130-S2Open ↗
09/26/2026B08030130-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B07997408-I1Open ↗
08/28/2026B08002901-P1Open ↗
08/28/2026B08002901-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/02/2026B08030130-S2Open ↗
09/26/2026B08030130-S3Open ↗
09/02/2026B08002901-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B08030130-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B08002901-P1Open ↗
08/28/2026B08002901-I1Open ↗
08/13/2026B08030130-S5Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B08030130-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08030130-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B08030130-I1Open ↗