← Back
Over six families without stores
Leona Blanche House
960 TINTON AVENUE · BIN 2115452
💬 Discuss this project
2003Year Built
5Stories
C1Building Class
R6Zoning
34,554 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: NORTH STAR HOUSING,INC. · 14,637 sf lot · 2.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 2 filings · 20 docs
Floor 5Under Construction11p · 1 filing · 20 docs
Floor 4Under Construction8p · 1 filing · 20 docs
Floor 3Under Construction8p · 1 filing · 20 docs
Floor 2Under Construction8p · 1 filing · 20 docs
Floor 1Under Construction32p · 3 filings · 20 docs
CellarUnder Construction14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROJECT RENEWAL7008/28/2026
NORTH STAR HOUSING503/22/2026
J PILLA GROUP103/22/2026
MEGA CONTRACTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JZ ARCH CONSULTING1003/21/2026
JM ZONING, LLC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE J. PILLA GROUP LTDGeneral Contractor1007/08/2026
CS BRIDGE CORPGeneral Contractor504/09/2026
INFINITI ESC PLUMBING CORPlumbing307/08/2026
BREEZING MECHANICAL INCGeneral Contractor303/21/2026
FOLOR INCGeneral Contractor207/08/2026
JOHN AHRENSElectrical103/21/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
PSI PARTNERS, LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC20031008/14/2026
TSF ENGINEERING, PC1274411/16/2020
SPECIAL INSPECTION SERVIC1200107/09/2020
Building Lifecycle
All (124)Filed (17)Permit Issued (18)Signed Off (5)Violation (43)Inspection (4)Objection (7)Special Inspection (30)
09/15/2026
Objection raised — Scope
08/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/17/2026
Filed — Alteration
STRUCTURAL WORK FILED TO REPAIR CRACKS IN EXISTING RETAINING WALL IN REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01107007-S7
08/14/2026
Filed — Alteration
STRUCTURAL WORK FILED TO REPAIR CRACKS IN EXISTING RETAINING WALL IN REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01107007-P4
08/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
08/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
08/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/03/2026
Signed off — Alteration
STRUCTURAL WORK FILED TO REPAIR CRACKS IN EXISTING RETAINING WALL IN REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01107007-I1
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/22/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
07/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
07/20/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
07/20/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
07/20/2026
Special inspection requirement — Final
Christopher Drutjons
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
07/20/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
07/20/2026
Special inspection requirement — Chimneys and vents
Christopher Drutjons
07/09/2026
Signed off — Alteration
STRUCTURAL WORK FILED TO REPAIR CRACKS IN EXISTING RETAINING WALL IN REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01107007-S3
06/24/2026
Filed — Alteration
STRUCTURAL WORK FILED TO REPAIR CRACKS IN EXISTING RETAINING WALL IN REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01107007-P2
06/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
06/23/2026
Special inspection requirement — Final
Christopher Drutjons
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
06/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
06/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
06/23/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
06/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
06/23/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
06/16/2026
Signed off — Alteration
STRUCTURAL WORK FILED TO REPAIR CRACKS IN EXISTING RETAINING WALL IN REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01107007-S4
06/11/2026
Filed — Alteration
STRUCTURAL WORK FILED TO REPAIR CRACKS IN EXISTING RETAINING WALL IN REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01107007-P1
06/09/2026
Permit issued — Plumbing
X01107007-S1-PL
05/18/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01198831-I1
05/18/2026
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01190909-I1
03/26/2026
Permit issued — Sidewalk Shed
X01190909-I1-SH
03/23/2026
Permit issued — Supported Scaffold
X01198831-I1-SF
01/14/2026
Permit issued — Boiler Equipment
X01107007-S5-BE
11/17/2025
Violation issued (HPD, closed)
I
10/02/2025
Permit issued — Structural
X01107007-S4-ST
10/02/2025
Permit issued — General Construction
X01107007-I1-GC
10/01/2025
Permit issued — Structural
X01107007-S3-ST
08/20/2025
Violation issued (ECB, closed)
Construction
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Admin
08/05/2025
Objection raised — Admin
08/05/2025
Objection raised — Admin
07/31/2025
Filed — Alteration
STRUCTURAL WORK FILED TO REPAIR CRACKS IN EXISTING RETAINING WALL IN REAR YARD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01107007-S5
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR06/09/2026
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP03/26/2026
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP03/23/2026
DOB NOWBoiler EquipmentPermit IssuedINFINITI ESC PLUMBING COR01/14/2026
DOB NOWStructuralSigned-offTHE J. PILLA GROUP LTD10/02/2025
DOB NOWGeneral ConstructionSigned-offTHE J. PILLA GROUP LTD10/02/2025
DOB NOWStructuralSigned-offTHE J. PILLA GROUP LTD10/01/2025
DOB NOWMechanical SystemsSigned-offBREEZING MECHANICAL INC06/24/2025
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP03/24/2025
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP03/24/2025
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR03/20/2025
DOB NOWStructuralSigned-offTHE J. PILLA GROUP LTD02/06/2025
DOB NOWStructuralSigned-offTHE J. PILLA GROUP LTD02/06/2025
DOB NOWGeneral ConstructionSigned-offTHE J. PILLA GROUP LTD02/06/2025
DOB NOWPlumbingPermit IssuedMORA FIRE PROTECTION LLC08/06/2020
DOB NOWMechanical SystemsPermit IssuedFOLOR INC04/02/2020
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC02/24/2020
DOB NOWMechanical SystemsPermit IssuedFOLOR INC02/10/2020
BISOTISSUEDFOLOR INC09/09/2020
BISPLISSUEDG.N.T. MECHANICAL, LLC12/26/2003
BISEQISSUEDMEGA CONTRACTING11/05/2003
BIS—ISSUEDMEGA CONTRACTING INC01/07/2003
BISSDISSUEDG.N.T. MECHANICAL, LLC01/07/2003
BISEQISSUEDMEGA CONTRACTING01/07/2003
BISPLISSUEDG.N.T. MECHANICAL, LLC01/07/2003
BISPLISSUEDG.N.T. MECHANICAL, LLC01/02/2003
2 projects · most recent 08/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Signed-offTHE J. PILLA GROUP LTDHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU073SJ4 7,500 BTU · Vrf Indoor ×2
ARNU363NJA4 36,000 BTU · Vrf Indoor ×2
ARNU123SJ4 13,600 BTU · Vrf Indoor ×1
ARNU123SJS4 1,300 BTU · Vrf Indoor ×1
ARNU123TD4 12,300 BTU · Vrf Indoor ×1
ARNU243SK4 24,200 BTU · Vrf Indoor ×1
ARNU243TAA4 24,200 BTU · Vrf Indoor ×1
ARNU303NJA4 30,000 BTU · Vrf Indoor ×1
ARNU543NKA4 53,000 BTU · Vrf Indoor ×1
LSN243HLV3 22,000 BTU · Vrf Indoor ×1
11/16/2020Permit IssuedFOLOR INCVentilation Systems
Ventilation
Mitsubishi Electric TPKFP012HM142A 1 tons · Vrf Indoor ×1
TPKFYP12HM142A 1 tons · Vrf Indoor ×1
TUMYP0361AK42NA 3 tons · Vrf Outdoor ×1
1 project · most recent 07/09/2020
FiledStatusContractorScope
07/09/2020Permit IssuedPSI PARTNERS, LLC18 heads
2 projects · most recent 08/17/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
08/17/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
07/09/2020Signed-offBEDROCK PLBG. & HTG., INCGas, Water/Sanitary
4 projects · most recent 12/10/2025
General Wiring Lighting
FiledStatusContractorScope
12/10/2025Permit IssuedRELIANT ELEC'L CONT'G INCGeneral Wiring, Lighting
09/05/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
03/07/2025CompleteNASH ELECTRIC SERVICES IN—
03/31/2020CompleteRIVERDALE ELECTRIC CORPGeneral Wiring
2 projects · most recent 08/17/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/17/2026Permit IssuedINFINITI ESC PLUMBING CORSteel, Concrete, Masonry
07/09/2020Permit IssuedMORA FIRE PROTECTION LLCSteel, Concrete
2 projects · most recent 03/24/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/24/2025Signed-offCS BRIDGE CORPScaffold
03/24/2025Signed-offCS BRIDGE CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2026Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
08/12/2026HVAC-R and service water heating system controls—energy_progress
08/12/2026Tenant Protection Plan Compliance—special
08/12/2026HVAC-R and service water piping design and insulation—energy_progress
08/12/2026HVAC-R and service water heating equipment—energy_progress
08/11/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
08/11/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
08/11/2026Tenant Protection Plan Compliance—special
08/11/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
08/11/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
07/20/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
07/20/2026Chimneys and ventsChristopher Drutjonsspecial
07/20/2026Tenant Protection Plan ComplianceChristopher Drutjonsspecial
07/20/2026Heating SystemsChristopher Drutjonsspecial
07/20/2026Mechanical SystemsChristopher Drutjonsspecial
07/20/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
07/20/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
07/20/2026Fire-Resistance Rated ConstructionChristopher Drutjonsprogress
07/20/2026FinalChristopher Drutjonsprogress
07/20/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
07/20/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
07/20/2026Maintenance informationChristopher Drutjonsenergy_progress
06/23/2026Chimneys and ventsChristopher Drutjonsspecial
06/23/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
06/23/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
06/23/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
Latest 25 of 72.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch12
08/20/2026X01107007-P4Request digital key ↗
08/20/2026X01107007-S7Request digital key ↗
08/20/2026X01107007-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026X00288048-I1Request digital key ↗
08/15/2026X00288048-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026X00287852-I1Request digital key ↗
08/15/2026X00287852-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026X00287852-I1Request digital key ↗
08/15/2026X00287852-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/26/2026X00287852-S1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
08/14/2020240281930Open ↗
07/17/2013220288150Open ↗
05/08/2013220288150Open ↗
▸BISWORK PERMIT APPLICATION1
09/09/2020240281930Open ↗
▸Seals & Professional Certifications62
▸DOB NOWSpecial Inspector Seal & Signature23
08/31/2026X01107007-I1Open ↗
08/31/2026X01107007-I1Open ↗
08/31/2026X01107007-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
08/31/2026X01107007-I1Open ↗
08/31/2026X01107007-I1Open ↗
08/31/2026X00287852-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/26/2026X00287852-I1Open ↗
08/26/2026X00287852-P1Open ↗
08/26/2026X00287852-S1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/14/2020240281930Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/14/2020240281930Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/14/2020240281930Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
12/30/2014220288150Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan5
08/13/2026X00287852-P1Open ↗
08/13/2026X00288048-P1Open ↗
08/13/2026X00288048-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
08/14/2020240281930Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/11/2021240281930Open ↗
08/14/2020240281930Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/14/2020240281930Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/11/2021240281930Open ↗
08/14/2020240281930Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/20/2026X01107007-P4Open ↗
08/20/2026X01107007-S7Open ↗
08/20/2026X01107007-P2Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/17/2021240281930Open ↗
12/30/2014220288150Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/30/2014220288150Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
03/11/2021240281930Open ↗
08/14/2020240281930Open ↗
12/30/2014220288150Open ↗
Showing 3 of 4 on file for this type
▸BISEMERGENCY RESPONSE AGENCIES C/O NOTIFICATION AFFIDAVIT1
03/11/2021240281930Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/14/2020240281930Open ↗
▸BISEFILING COVER SHEET1
05/08/2013220288150Open ↗