← Back
Four families
962 46 STREET
BROOKLYN · BIN 3136821
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R6Zoning
2,680 sfGross Floor Area
4Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Four families · 2,454 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 25p · 2 filings · 18 docs
Floor 11p · 1 filing · 6 docs
Basement6p · 2 filings · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/05/2024$2.0M—Private party → Private party$746/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI701/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor407/08/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394301/17/2025
Building Lifecycle
All (33)Filed (7)Permit Issued (4)Signed Off (3)Violation (10)Special Inspection (9)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
02/18/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01110637-I1
02/18/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN BASEMENT; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01110640-I1
02/14/2025
Signed off — Alteration
INSTALL 8' TEMP. PLYWOOD FENCE AS PER PLAN. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
B01114147-I1
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
01/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
01/17/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01110637-P2
01/17/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN BASEMENT; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01110640-P2
01/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
01/17/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
01/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
11/27/2024
Violation issued (HPD, open)
I
11/25/2024
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN BASEMENT; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01110640-P1
11/25/2024
Permit issued — General Construction
B01110637-I1-GC
10/07/2024
Permit issued — Construction Fence
B01114147-I1-FN
10/04/2024
Filed — Alteration
INSTALL 8' TEMP. PLYWOOD FENCE AS PER PLAN. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
B01114147-I1
09/26/2024
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01110637-P1
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/25/2024
Violation issued (ECB, closed)
Construction
09/25/2024
Violation issued (ECB, closed)
Construction
09/19/2024
Permit issued — General Construction
B01110637-I1-GC
09/18/2024
Permit issued — Plumbing
B01110640-I1-PL
09/16/2024
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR AT FRONT AND REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01110637-I1
09/16/2024
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN BASEMENT; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01110640-I1
04/08/2024
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/25/2024
DOB NOWConstruction FenceSigned-offKLE CONSTRUCTION INC10/07/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC09/19/2024
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC09/18/2024
2 projects · most recent 03/28/2025
General Wiring
FiledStatusContractorScope
03/28/2025CompleteE D ELECTRICAL INCGeneral Wiring
02/10/2025CompleteE D ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/03/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/21/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
01/21/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
01/21/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
01/17/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
01/17/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
01/17/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
09/26/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/26/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/26/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B01114147-I1Request digital key ↗
08/23/2026B01110640-P2Request digital key ↗
08/23/2026B01110640-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026B01110640-P1Open ↗
08/23/2026B01110640-P2Open ↗
08/23/2026B01110640-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026B01110637-P2Open ↗
08/27/2026B01110637-I1Open ↗
08/23/2026B01110637-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026B01110637-P2Open ↗
08/27/2026B01110637-I1Open ↗
08/23/2026B01110637-P1Open ↗