← Back
Condo, residential unit, 1-3 unit building (orig. class 1)
965 46 STREET
BROOKLYN · BIN 3136588
💬 Discuss this project
1930Year Built
2Stories
R6Building Class
R6Zoning
3,104 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Condo, residential unit, 1-3 unit building (orig. class 1) · 2,454 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNIVERSAL SYSTEMS507/08/2026
MBC CONSTRUCTION303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT903/21/2026
EUROCELT EXPEDITING, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI STATE PLBG & HTG INCPlumbing807/08/2026
JZ CONSTRUCTION GROUP INCGeneral Contractor607/08/2026
MBC CONSTRUCTION CORPGeneral Contractor407/08/2026
UNIVERSAL SYSTEMS INCGeneral Contractor207/08/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
RRP PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREAT WALL CONSULTANT P.E5633205/26/2022
WW ENGINEERING PLLC7502112/13/2021
STREET CONSULTING ENGINEE4259112/11/2021
ALEX GAD P.E.4671407/02/2021
Building Lifecycle
All (71)Filed (10)Permit Issued (11)Signed Off (6)Violation (10)Inspection (7)Special Inspection (27)
02/06/2023
Signed off — Alteration
PROPOSE STRUCTURAL WORK IN CONJUNCTION WITH ALT 1 #322028328 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00420513-I1
08/23/2022
Signed off — Alteration
B00568876-I1
08/16/2022
Signed off — Alteration
B00380554-I1
08/16/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
08/15/2022
Signed off — Alteration
B00619180-I1
08/12/2022
Signed off — Alteration
Propose plumbing work on existing 3-story apartments building in conjunction with ALT-1 #322028328 as per plan. No change in use, egress, or occupancy under this application.
B00574852-I1
06/29/2022
Permit issued — Plumbing
B00574852-I1-PL
05/26/2022
Filed — Alteration
Propose plumbing work on existing 3-story apartments building in conjunction with ALT-1 #322028328 as per plan. No change in use, egress, or occupancy under this application.
B00574852-P3
05/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiong Wei Wu
05/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Xiong Wei Wu
05/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
04/29/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/21/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/25/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/19/2022
Permit issued — Plumbing
B00574852-I1-PL
12/30/2021
Signed off — Alteration
B00375108-I1
12/27/2021
Permit issued — Sprinklers
B00619180-I1-EW-SP
12/17/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/13/2021
Filed — Alteration
B00619180-I1
12/11/2021
Filed — Alteration
Propose plumbing work on existing 3-story apartments building in conjunction with ALT-1 #322028328 as per plan. No change in use, egress, or occupancy under this application.
B00574852-P1
12/03/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Erik Street
12/03/2021
Special inspection requirement — Energy Code Compliance Inspections
Erik Street
12/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Erik Street
08/24/2021
Permit issued — Plumbing
B00574852-I1-PL
08/18/2021
Filed — Alteration
Propose plumbing work on existing 3-story apartments building in conjunction with ALT-1 #322028328 as per plan. No change in use, egress, or occupancy under this application.
B00574852-I1
08/09/2021
Permit issued — Construction Fence
B00568876-I1-FN
08/06/2021
Filed — Alteration
B00568876-I1
08/04/2021
Permit issued — Sidewalk Shed
B00375108-I1-SH
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2021
Permit issued — Structural
B00380554-I1-ST
08/02/2021
Permit issued — Structural
B00420513-I1-ST
07/08/2021
Special inspection requirement — Final
NAGY GAD
07/08/2021
Special inspection requirement — Masonry
NAGY GAD
07/08/2021
Special inspection requirement — Concrete - Cast-In-Place
NAGY GAD
07/08/2021
Special inspection requirement — Structural Steel - High Strength Bolting
NAGY GAD
07/08/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
NAGY GAD
07/08/2021
Special inspection requirement — Subgrade Inspections
NAGY GAD
07/08/2021
Special inspection requirement — Structural Steel - Welding
NAGY GAD
07/02/2021
Filed — Alteration
PROPOSE STRUCTURAL WORK IN CONJUNCTION WITH ALT 1 #322028328 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00420513-P2
07/02/2021
Special inspection requirement — Final
NAGY GAD
07/02/2021
Special inspection requirement — Subgrade Inspections
NAGY GAD
07/02/2021
Special inspection requirement — Structural Steel - Welding
NAGY GAD
07/02/2021
Special inspection requirement — Structural Steel - High Strength Bolting
NAGY GAD
07/02/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
NAGY GAD
07/02/2021
Special inspection requirement — Masonry
NAGY GAD
07/02/2021
Special inspection requirement — Concrete - Cast-In-Place
NAGY GAD
06/08/2021
Filed — Alteration
PROPOSE STRUCTURAL WORK IN CONJUNCTION WITH ALT 1 #322028328 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00420513-P1
06/07/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
NAGY GAD
06/07/2021
Special inspection requirement — Concrete - Cast-In-Place
NAGY GAD
06/07/2021
Special inspection requirement — Masonry
NAGY GAD
06/07/2021
Special inspection requirement — Structural Steel - Welding
NAGY GAD
06/07/2021
Special inspection requirement — Structural Steel - High Strength Bolting
NAGY GAD
06/07/2021
Special inspection requirement — Subgrade Inspections
NAGY GAD
05/07/2021
Violation issued (ECB, closed)
Construction
01/11/2021
Special inspection requirement — Final
NAGY GAD
11/30/2020
Permit issued — Structural
B00420513-I1-ST
11/23/2020
Violation issued (ECB, closed)
Construction
11/20/2020
Filed — Alteration
PROPOSE STRUCTURAL WORK IN CONJUNCTION WITH ALT 1 #322028328 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00420513-I1
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC06/29/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC01/19/2022
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.12/27/2021
DOB NOWPlumbingSigned-offDW PLUMBING INC08/24/2021
DOB NOWConstruction FenceSigned-offJZ CONSTRUCTION GROUP INC08/09/2021
DOB NOWSidewalk ShedSigned-offUNIVERSAL SYSTEMS INC08/04/2021
DOB NOWStructuralSigned-offJZ CONSTRUCTION GROUP INC08/02/2021
DOB NOWStructuralSigned-offJZ CONSTRUCTION GROUP INC08/02/2021
DOB NOWStructuralSigned-offMBC CONSTRUCTION CORP11/30/2020
DOB NOWStructuralSigned-offMBC CONSTRUCTION CORP08/13/2020
DOB NOWSidewalk ShedSigned-offUNIVERSAL SYSTEMS INC07/24/2020
BIS—ISSUEDJZ CONSTRUCTION GROUP INC09/03/2021
BIS—RE-ISSUEDJZ CONSTRUCTION GROUP INC08/17/2021
BISOTISSUEDJZ CONSTRUCTION GROUP INC07/30/2021
BISOTISSUEDMBC CONSTRUCTION CORP03/02/2020
3 projects · most recent 04/16/2022
General Wiring
FiledStatusContractorScope
04/16/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
07/22/2020CompleteTOP SHELF ELECTRIC CORP—
07/06/2020CompleteAL-LECTRIC ELECT'L CONTRG—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/16/2022Pass-Final Fence Non-Directive 14PassView ↗
04/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/25/2022HVAC-R and service water piping design and insulationXiong Wei Wuenergy_progress
05/25/2022Energy Code Compliance InspectionsXiong Wei Wuprogress
05/25/2022Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
12/03/2021HVAC-R and service water piping design and insulationErik Streetenergy_progress
12/03/2021Energy Code Compliance InspectionsErik Streetprogress
12/03/2021Fire-Resistant Penetrations and JointsErik Streetspecial
07/08/2021FinalNAGY GADprogress
07/08/2021MasonryNAGY GADspecial
07/08/2021Concrete - Cast-In-PlaceNAGY GADspecial
07/08/2021Structural Steel - High Strength BoltingNAGY GADspecial
07/08/2021Structural Stability – Alterations of existing buildingsNAGY GADspecial
07/08/2021Subgrade InspectionsNAGY GADspecial
07/08/2021Structural Steel - WeldingNAGY GADspecial
07/02/2021FinalNAGY GADprogress
07/02/2021Subgrade InspectionsNAGY GADspecial
07/02/2021Structural Steel - WeldingNAGY GADspecial
07/02/2021Structural Steel - High Strength BoltingNAGY GADspecial
07/02/2021Structural Stability – Alterations of existing buildingsNAGY GADspecial
07/02/2021MasonryNAGY GADspecial
07/02/2021Concrete - Cast-In-PlaceNAGY GADspecial
06/07/2021Structural Stability – Alterations of existing buildingsNAGY GADspecial
06/07/2021Concrete - Cast-In-PlaceNAGY GADspecial
06/07/2021MasonryNAGY GADspecial
06/07/2021Structural Steel - WeldingNAGY GADspecial
06/07/2021Structural Steel - High Strength BoltingNAGY GADspecial
Latest 25 of 27.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch5
09/01/2026B00568876-I1Request digital key ↗
09/01/2026B00574852-P1Request digital key ↗
09/01/2026B00574852-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/02/2026B00380554-I1Request digital key ↗
09/02/2026B00420513-I1Request digital key ↗
09/02/2026B00420513-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00375108-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION19
01/23/2023322028328Open ↗
10/12/2022322028328Open ↗
10/11/2022322028328Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION4
09/07/2021322028328Open ↗
08/17/2021322028328Open ↗
07/30/2021322028998Open ↗
Showing 3 of 4 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
08/16/2021322028328Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/16/2021322028328Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/21/2020340735645Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/08/2022322028328Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
01/11/2023322028328Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/11/2023322028328Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature20
08/28/2026B00574852-P1Open ↗
08/26/2026B00574852-P3Open ↗
08/24/2026B00420513-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026B00420513-P2Open ↗
09/02/2026B00420513-I1Open ↗
09/02/2026B00420513-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026B00574852-P1Open ↗
08/28/2026B00574852-P1Open ↗
08/26/2026B00574852-P3Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/13/2020322028998Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/21/2020340735645Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/13/2020322028998Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/21/2020340735645Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/13/2020322028998Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
08/27/2020340735645Open ↗
06/25/2020322028328Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/11/2021322028328Open ↗
07/17/2020322028328Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/02/2026B00420513-P2Open ↗
09/02/2026B00420513-I1Open ↗
09/02/2026B00420513-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/06/2020322028328Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/29/2022322028328Open ↗
06/21/2022322028998Open ↗
08/16/2021322028328Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/29/2022322028328Open ↗
06/21/2022322028998Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/13/2020322028998Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00574852-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/29/2022322028328Open ↗
07/29/2022322028328Open ↗
06/21/2022322028998Open ↗
Showing 3 of 6 on file for this type
▸BISSOIL REPORT1
07/17/2020322028328Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/17/2020322028328Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
10/15/2021322028328Open ↗
10/12/2021322028328Open ↗
08/11/2021322028328Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/23/2022322028998Open ↗
▸BISSUPERSEDING LETTER1
07/30/2021322028998Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/23/2022322028998Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
07/29/2022322028328Open ↗
06/21/2022322028998Open ↗
06/25/2020322028328Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
07/21/2022322028328Open ↗
11/30/2021322028328Open ↗
10/19/2021322028328Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
04/02/2020322028328Open ↗
03/05/2020322028998Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/21/2020340735645Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/31/2020340735645Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
10/14/2022322028328Open ↗