HPD11/28/2022§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT METAL GATE AT BUILDING ENTRANCE DOOR , 1st STORY
HPD04/17/2012SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 1, 1st STORY
HPD04/17/2012SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW CRANK 4TH WINDOW FROM NORTH IN THE 6th ROOM FROM EAST LOCATED AT APT 1, 1st STORY
Two family frame · 2,000 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.