← Back
BuildNYC
Public elementary, junior or senior high
Success Academy Bronx 3 Cms
965 LONGWOOD AVENUE · BIN 2005616
💬 Discuss this project
1904Year Built
3Stories
W1Building Class
R7-1Zoning
84,500 sfGross Floor Area
2Units
LL97 Covered10 Active Violations 0 unresolved · 10 paperwork only 2 likely answered ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 30,000 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 39, H.S. 039X2 filings · 20 docs
Floor 3P.S. 39, H.S. 039X2 filings · 20 docs
Floor 2P.S. 39, H.S. 039X2 filings · 20 docs
Floor 1Longwood Preparatory Academy, P.S. 39 +1Under Construction8p · 3 filings · 17 docs
CellarP.S. 39, H.S. 039X2 filings · 20 docs
BasementLongwood Preparatory AcademyUnder Construction1p · 1 filing · 17 docs
Sub-BasementP.S. 39, H.S. 039X +13 filings · 20 docs
Site & exteriorLongwood Preparatory AcademyUnder Construction18p · 1 filing · 6 docs
Filed — no permit issuedLongwood Preparatory Academy29p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority7609/13/2026
NYC Department of Housing Preservation and Development803/21/2026
NYC Department of Education703/22/2026
New York City Public School203/21/2026
Liro103/22/2026
NYC Department of Design and Construction103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV1003/21/2026
NYC School Construction Authority1803/21/2026
Precision 3Sixty NYC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Shining SKYGeneral Contractor208/26/2026
Everest ElectricElectrical103/22/2026
Gemini Electric CoElectrical103/22/2026
G.S.H. ElectricElectrical103/21/2026
Gotham Wiring LicensedElectrical103/22/2026
Charan Electrical Enterp'sElectrical103/21/2026
Remy BuildersElectrical103/21/2026
Nunez ElectricElectrical103/21/2026
Thorn ElectricElectrical103/21/2026
Urban ElectricalElectrical103/22/2026
Prince ElectricElectrical103/21/2026
Kel-Tech ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106303/19/2026
Twin Peaks317403/03/2025
JPC Logistics Dba JPCL EN351205/17/2023
Building Lifecycle
All (24)Filed (24)
03/19/2026
Filed — Alteration
SH/PS39X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (EMERGENCY SHED)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO LLW#145645, NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01373401-I1
03/19/2026
Filed — Alteration
SF/PS39X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (EMERGENCY SCAFFOLD)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO LLW#, NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01373408-I1
09/19/2025
Filed — Alteration
Replace existing light fixtures with new ones
X01281225-S1
09/19/2025
Filed — Alteration
Replace existing light fixtures with new ones
X01281225-S2
09/12/2025
Filed — Alteration
Replace existing light fixtures with new ones
X01281225-I1
03/03/2025
Filed — Alteration
X039_Provide new rooftop air handling units on a new structural dunnages. Remove existing rooftop AC unit and replace with new on steel dunnage.
X00655529-P3
03/03/2025
Filed — Alteration
X039_Provide new rooftop air handling units on a new structural dunnages. Remove existing rooftop AC unit and replace with new on steel dunnage.
X00655529-S1
02/21/2025
Filed — Alteration
X039_Provide new rooftop air handling units on a new structural dunnages. Remove existing rooftop AC unit and replace with new on steel dunnage.
X00655529-P2
02/10/2025
Filed — Alteration
INSTALL NEW TRENCH DRAIN AT THE BOTTOM OF EXTERIOR RAMP. PIPE SHALL BE ROUTED TO AREAWAY AND DISCHARGE INDIRECT INTO AN SPLASH BLOCK.
X01136693-S1
02/10/2025
Filed — Alteration
INSTALL NEW TRENCH DRAIN AT THE BOTTOM OF EXTERIOR RAMP. PIPE SHALL BE ROUTED TO AREAWAY AND DISCHARGE INDIRECT INTO AN SPLASH BLOCK.
X01136693-I1
01/15/2025
Filed — Alteration
X039_Provide new rooftop air handling units on a new structural dunnages. Remove existing rooftop AC unit and replace with new on steel dunnage.
X00655529-P1
05/15/2024
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-S9
05/13/2024
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-S8
01/23/2024
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-S7
11/29/2023
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-S6
11/29/2023
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-S2
11/29/2023
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-S5
11/29/2023
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-S3
11/22/2023
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-S1
11/21/2023
Filed — Alteration
X039 :MS Upgrade and Removal of the 2 Boilers and 2 Oil Burners. Remove all Ductworks and fittings and replace with New Ductworks. New Roof Top Air Handling Units, Unit Ventilators, Water Fin Tubes etc. REFER TO X00923912-I1 FOR ALL MECH INFORMATION.
X00923912-I1
05/17/2023
Filed — Alteration
DEMOLITION OF BASEMENT BATHROOM AND INSTALLATION OF NEW BOYS AND GIRLS BATHROOMS.
X00870379-S1
05/17/2023
Filed — Alteration
DEMOLITION OF BASEMENT BATHROOM AND INSTALLATION OF NEW BOYS AND GIRLS BATHROOMS.
X00870379-S2
05/17/2023
Filed — Alteration
DEMOLITION OF BASEMENT BATHROOM AND INSTALLATION OF NEW BOYS AND GIRLS BATHROOMS.
X00870379-I1
01/06/2022
Filed — Alteration
X039_Provide new rooftop air handling units on a new structural dunnages. Remove existing rooftop AC unit and replace with new on steel dunnage.
X00655529-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedShining SKY08/13/2026
DOB NOWGeneral ConstructionPermit IssuedShining SKY08/06/2026
DOB NOWSupported ScaffoldPermit IssuedKel-Tech Construction06/03/2026
BISOTISSUEDJPR Builders 0711/19/2025
BISPLISSUEDVarsity Plumbing and Heating01/23/2025
BISOTISSUEDPMY Construction09/17/2024
BISOTISSUEDPMY Construction09/17/2024
BISOTISSUEDPMY Construction03/06/2024
BISOTISSUEDPMY Construction03/06/2024
BISPLISSUEDVarsity Plumbing and Heating01/29/2024
BISPLISSUEDVarsity Plumbing and Heating01/30/2023
BISMHISSUEDEmpire Control Abatement09/29/2022
BISOTISSUEDEmpire Control Abatement09/29/2022
BISOTISSUEDPMY Construction08/30/2022
BISOTISSUEDPMY Construction08/30/2022
BISPLISSUEDVarsity Plumbing and Heating02/02/2022
BISOTISSUEDPMY Construction09/15/2021
BISOTISSUEDPMY Construction09/15/2021
BISMHISSUEDDo Rite Mechanical06/18/2021
BISPLISSUEDDo Rite Mechanical06/18/2021
BISOTISSUEDJPR Builders 0702/05/2021
BISPLISSUEDVarsity Plumbing and Heating02/03/2021
BISMHISSUEDEmpire Control Abatement01/14/2021
BISOTISSUEDPMY Construction11/02/2020
BISOTISSUEDPMY Construction11/02/2020
BISOTISSUEDEmpire Control Abatement10/14/2020
BISMHISSUEDDo Rite Mechanical07/31/2020
BISPLISSUEDDo Rite Mechanical07/31/2020
BISOTISSUEDJPR Builders 0707/31/2020
BISOTISSUEDJPR Builders 0707/30/2020
BISPLISSUEDVarsity Plumbing and Heating02/28/2020
BISOTISSUEDPMY Construction02/28/2020
BISOTISSUEDPMY Construction02/28/2020
BISOTISSUEDUrban Electric10/22/2019
BISOTISSUEDEmpire Control Abatement08/30/2019
BISOTISSUEDJPR Builders 0710/09/2018
BISMHISSUEDDo Rite Mechanical07/20/2018
BISPLISSUEDDo Rite Mechanical07/20/2018
BISOTISSUEDJPR Builders 0707/18/2018
BISPLISSUEDTristar Plumbing & Heating04/07/2011
+ 13 more permits on file
3 projects · most recent 03/03/2025
Ventilation Systems Heating and Air Conditioning Systems Heating Systems Associated Ducts and Piping Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2025——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Annexair ERP-E-07-EW05-C-HR-HG-TB-ASP 30 tons · Rooftop Unit ×4
Heating
Trane CSAA040 15,350 CFM · Rooftop Unit ×4
Ventilation
Greenheck BSQ-130HP 1,000 CFM · Exhaust Fan ×4
CSP-A200 250 CFM · Exhaust Fan ×4
Trane CSAA040 15,350 CFM · Rooftop Unit ×4
05/15/2024——Air Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MSZ-FS06NA-U1 6,000 BTU · Heat Pump Outdoor ×4
PKA-A18LA 18,000 BTU · Heat Pump Outdoor ×3
PUY-A18NKA7-BS 18,000 BTU · Heat Pump Outdoor ×3
MXZ-SM48NAMHZ 2-U1 6,000 BTU · Vrf Outdoor ×1
PKA-A24KA8 24,000 BTU · Heat Pump Outdoor ×1
PKA-A30KA7 30,000 BTU · Vrf Indoor ×1
PUY-A24NNHA7 24,000 BTU · Heat Pump Outdoor ×1
PUY-A30NHA7-BS 30,000 BTU · Heat Pump Outdoor ×1
Ventilation
Trane BCHE-024 800 CFM · Fan Coil Indoor ×4
BCHE-018 600 CFM · Fan Coil Indoor ×3
BCHE-036 1,225 CFM · Fan Coil Indoor ×3
BCHE-054 1,650 CFM · Fan Coil Indoor ×3
BCH#-024 700 CFM · Fan Coil Indoor ×1
BCHE-012 475 CFM · Fan Coil Indoor ×1
BCHE-072 1,600 CFM · Fan Coil Indoor ×1
Greenheck CSP-A3300-VG 750 CFM · Exhaust Fan ×1
CUE-090-VG 100 CFM · Exhaust Fan ×1
CUE-100-VG 775 CFM · Exhaust Fan ×1
CUE-140-VG 1,425 CFM · Exhaust Fan ×1
CUE-140HP-VG 800 CFM · Exhaust Fan ×1
SQ-160HP-VG 300 CFM · Exhaust Fan ×1
Aldes ALDES PW15 1,250 CFM · Erv ×2
ALDES PW30 2,250 CFM · Erv ×1
Systemair Freshman HCC ERW IQ-B Cabinet 1,250 CFM · Vav Box ×2
FRESHMAN HCC ERW IQ-B 1,300 CFM · Vav Box ×44
FRESHMAN HCC ERW IQ-B CABINET 1,150 CFM · Vav Box ×1
FRESHMAN HCC ERW IQ-C CABINET 1,550 CFM · Vav Box ×1
Refrigeration
Trane AXM030 252 tons · Chiller ×1
Heat / Cool
Trane CSAA006 2,800 CFM · Chiller ×1
CSAA017 8,700 CFM · Chiller ×1
Heating
Trane OAD / N REV. 6 1,725 CFM · Heat Pump Outdoor ×1
Ducts & Piping
Anemostat EPL-D 175 CFM ×1
05/17/2023——Associated Ducts and Piping, Ventilation Systems
Ventilation
Loren Cook Loren Cook Direct Drive Inline Fan 100SQN12D 550 CFM · Exhaust Fan ×1
Ducts & Piping
__Junk__ Approximately 20' Feet. 1 CFM · Ductwork ×1
1 project · most recent 05/15/2024
Sprinkler System
FiledStatusContractorScope
05/15/2024——Sprinkler System
5 projects · most recent 09/19/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
09/19/2025——Water/Sanitary
03/03/2025——Gas
02/10/2025——Storm
05/15/2024——Gas, Water/Sanitary
05/17/2023——Water/Sanitary
14 projects · most recent 10/12/2026
General Wiring Lighting
FiledStatusContractorScope
10/12/2026CompleteUrban ElectricalGeneral Wiring
07/22/2026Permit IssuedUrban ElectricalGeneral Wiring
02/05/2025CompleteDNR ElectricGeneral Wiring
04/07/2022CompleteCharan Electrical Enterp'sGeneral Wiring
02/18/2021CompleteKLK ElectricGeneral Wiring
07/07/2020CompleteCharan Electrical Enterp's—
01/09/2020CompleteEverest ElectricGeneral Wiring
10/18/2019CompleteKLK ElectricGeneral Wiring
09/27/2019CompleteGemini Electric CoGeneral Wiring
05/31/2019Permit IssuedGotham Wiring LicensedGeneral Wiring
01/14/2019CompleteAnco Electl ContctngGeneral Wiring
11/14/2018CompleteUrban ElectricalGeneral Wiring, Lighting
05/14/2018CompleteRichard NeuGeneral Wiring
12/13/2017CompleteCharan Electrical Enterp's—
3 projects · most recent 03/03/2025
Steel Concrete Masonry
FiledStatusContractorScope
03/03/2025——Steel
02/10/2025——Concrete
05/15/2024——Steel, Concrete, Masonry
2 projects · most recent 03/19/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
03/19/2026——Sidewalk Shed
03/19/2026Permit IssuedKel-Tech ConstructionScaffold
Nothing on file for this building.
Nothing on file for this building.